This document is a Task Assignment (TA) under an indefinite delivery contract between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc., with Erwin Remediation serving as a subcontractor for remedial waste disposal services. The task is assigned under Contract Number HW684, with TA Number DC012D, and is located at Nu-Way Cleaners, Inc., a dry cleaning site in Plant City, Hillsborough County, Florida (ERIC_4701). The FDEP Project Manager is Nicole Knutson, and the Contractor's Project Manager is Brian Moore.
The task encompasses twelve months of operations and maintenance (O&M) activities and groundwater monitoring for a soil vapor extraction (SVE) system from April 2024 through March 2025, divided into five subtasks. The total TA value is $48,235.26, comprised of a fixed unit rate of $36,235.26 and cost reimbursement of $12,000.00 for utilities. The cost breakdown includes labor ($19,895.05), travel ($1,800.00), subcontracted services including utilities ($12,377.50) and laboratory testing ($8,355.50), and field expenses ($3,817.70). Deliverables include a Semi-Annual Summary (due 10/23/2024), paid utility invoices for April-September 2024 (due 11/29/2024), a Remedial Action Status Report (due 05/09/2025), and paid utility invoices for October 2024-March 2025 (due 05/30/2025). The task completion date is July 30, 2025. Erwin Remediation will provide industrial waste disposal (IDW) transportation services at rates of $125.00 per drum for non-hazardous water disposal, with pricing based on regional location and volume in Florida.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC012D Completion July 30, 2025
GHD will conduct O&M activities at Nu-Way Cleaners, Inc.
Nicole Knutson 850-245-8763 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-257-0658
ERIC_4701
1219 W Reynolds St, Plant City, Hillsborough County
Nu-Way Cleaners, Inc.
Contractor Contractor
✔ $ 36,235.26 ✔ $ 12,000.00
$ 48,235.26
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2024.02.08 16:59:25 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2024.02.08 11:25:55 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Semi-Annual Summary - Subtask 2 10/23/2024
Paid Utilities ($6,00 cost reimbursement and $120 handling fee).
April 2024 through September 2024 - Subtask 3 11/29/2024
Remedial Action Status Report & PM - Subtasks 4 & 1 05/09/2025
Paid Utilities ($6,00 cost reimbursement and $120 handling fee).
October 2024 through March 2025 - Subtask 5 05/30/2025
Upon FDEP Approval of Semi-Annual Summary - Subtask 2 $ 8,215.67
Upon Receipt of Paid Utilities ($6000 cost reimbursement and $120 handling fee).
April 2024 through September 2024 - Subtask 3 $ 6,120.00
Upon FDEP Approval of Remedial Action Status Report & PM - Subtasks 4 & 1 $ 27,779.59
Upon Receipt of Paid Utilities ($6000 cost reimbursement and $120 handling fee).
October 2024 through March 2025 - Subtask 5 $ 6,120.00
$ 48,235.26
HW684
DC012D
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawnn Hamilton Secretary
Memorandum
TO: ERIC_4701
Nu-Way Cleaners, Inc.
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW684 DC012D
DATE: February 2, 2024
GHD will perform O&M activities at Nu-Way Cleaners, Inc., as detailed in the February 2, 2024 proposal. Erwin Remediation will provide IDW transportation and disposal services.
Total task amount is $48,235.26. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is May 30, 2025.
Task completion date is July 30, 2025.
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s
In c.
D at e:
2/
Ta sk
D C
2D
S ub Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
N u- W ay C le an er s, Ta sk
O
M (6 m on th s)
S ub
Ta sk
A ct iv ity
/P ha se
O
M
Ta sk
U til iti es S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
O
M
(6 m on th
s) S ub Ta sk
S ub
Ta sk
U til iti es S ub Ta sk
TTo ta ls
La bo r
R at e C at eg or y
$4 9.
PP
ro je ct M an ag er
JM
.2
.2
$0
.0
P rin ci pa l E ng in ee r/S ci en tis t 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
Te ch ni ca l D ire ct or
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$5 6.
S r P ro fe ss io na l E ng in ee r
JH
2.
0.
0.
2.
0.
0.
0.
0.
0.
0.
$0 .0
S en io r P ro je ct
M an ag er
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 5.
P ro fe ss io na l E ng in ee r/S c G
E 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
9.
P ro je ct
E ng in ee r/S ci en tis
C H
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 9.
P ro je ct M an ag er / E ng in ee
JM
.0
.5
0.
.5
0.
0.
0.
0.
0.
0.
$3
1.
S ta ff E ng in ee r/S ci en tis t
JW
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$3
2.
D at a A na ly st
JL
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$4 3.
Fi el d
M an ag er
O T
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 2.
S en io r T ec hn ic ia n
S A
.2
0.
0.
.2
0.
0.
0.
0.
0.
0.
$2 6.
S en io r T ec hn ic ia n
W M
.5
.0
0.
.5
0.
0.
0.
0.
0.
0.
$2
4.
S en io r T ec hn ic ia n D
C 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2
0.
Ju ni or T ec hn ic ia n W
O 0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$1
9.
Ju ni or T ec hn ic ia n
JM
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$2 9.
D ra fti ng T ec hn ic ia n P
M 9.
0.
0.
8.
0.
0.
0.
0.
0.
0.
$2
1.
Ad m in is tra tiv e As si st an t
JJ
.0
7.
0.
.0
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0
.0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
$0 .0
0.
0.
0.
0.
0.
0.
0.
0.
0.
0.
To ta l H ou rs
6.
.2
.0
0.
0.
0.
0.
0.
0.
0.
0.
D ire ct L ab or
$7
,4
.6
$8
.3
$1 ,9
.8
$0
.0
$4 ,6
.4
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
O ve rh ea d
9.
$9
,6
.1
$1 ,1
.1
$2
,4
.5
$0 .0
$6
,0
.3
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
G en
A dm in
0.
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fr in ge
.8 0%
$2 ,8
.2
$3
.3
$7
.6
$0
.0
$1 ,7
.3
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l L ab or
$1
9, 5.
$2 ,2
.8
$5
,1
.0
$0 .0
$1
2, 0.
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Pa ge
FD
EP
C O
ST
E
ST
IM
A
TE
C on tra ct or
G H
D S er vi ce s at e:
Ta sk
D C
2D
Ta sk
P ro je ct
M an ag em en t
S ub
Ta sk
S ite
N u- W ay C le an er s, Ta sk
O
M (6 m on th s)
S ub
Ta sk
A ct iv ity
/P ha se
O
M
Ta sk
U til iti es S ub Ta sk
P ro je ct
M an ag er
B ria n
M oo re , P
E
Ta sk
O
M
(6 m on th
s) S ub Ta sk
S ub
Ta sk
U til iti es S ub Ta sk
TTo ta ls
TTr av el
V eh ic le
R en ta l
$1 ,8
.0
$7
.0
$0
.0
$1 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ile ag e C os ts
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
A ir
Fa re
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
P er d ie m
H ot el $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l T ra ve l $$1
,8
.0
$7
.0
$0 .0
$1
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ub co nt ra ct or (E qu ip m en t P ro cu re m en t)
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
P ro cu re m en t F ee $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l S ub co nt ra ct or
C os t $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
(S er vi ce s P ro cu re m en t) ril lin g (C on ve nt io na l)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
D ril lin g
(N on
-c on ve nt io na
l) $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
M ob ile
L ab or at or y
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S ur ve yi ng $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
ID
W $1
.0
$0
.0
$0 .0
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til iti es $1
2, 0.
$0 .0
$6
,0
.0
$0 .0
$6
,0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
U til ity
L oc at io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub co nt ra ct or
S ub to ta l $1
2, 5.
$0 .0
$6
,0
.0
$1
.0
$6 ,0
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
H an dl in g Fe e $2
.5
$0
.0
$1
.0
$1 2.
$1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l S ub co nt ra ct or C os t
$1 2, 7.
$0
.0
$6 ,1
.0
$1
.5
$6
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
La bo ra to ry
A na ly tic al
C os ts $7
,6
.5
$8
.0
$0 .0
$6
,8
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fa st
T ur na ro un d
C ha rg es
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
S am pl e
S hi pp in g $7
.0
$2
.0
$0
.0
$5
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l L ab or at or y
$8 ,3
.5
$1
,0
.0
$0 .0
$7
,3
.5
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
Fi el d E xp en se s
P er so na l P ro te ct io n $0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
E xp en da bl es $6
.0
$2
.0
$0
.0
$3
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
D ril lin g re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
A na ly tic al re la te
d) $3
,1
.7
$6
.0
$0 .0
$2
,5
.7
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
ID
W re la te d)
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
E qu ip m en t (
O th er
$1
.0
$0 .0
$0
.0
$1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
To ta l F ie ld E xp en se s
$3 ,8
.7
$8
.0
$0
.0
$2 ,9
.7
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
S ub to ta l $4
6, 5.
$2 ,2
.8
$7
,7
.0
$6 ,1
.0
$2
4, 2.
$6 ,1
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
C om pl et io n
Fe e
$1 ,9
.5
$2
.8
$5
.6
$0
.0
$1 ,2
.0
$0
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
To ta l E st im at ed C os t
$4 8, 5.
$2
,5
.6
$8 ,2
.6
$6
,1
.0
$2 5, 1.
$6
,1
.0
$0 .0
$0
.0
$0 .0
$0
.0
$0 .0
C os t f ro m P rio r C
E F:
M an ua l E nt ry
C os t f ro m D el ta
C E
F;
M an ua l E nt ry C os t (
P rio r + D el ta
$0
.0
A ut o- C al cu la te d R ou nd in g
E rr or
$4 8, 5.
A ut o-
C al cu la te d
Fi na l T ot al C os t:
$4 8, 5.
A ut o-
C al cu la te d
Pa ge
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Nu-Way Cleaners SUBTASK 2: O&M (6 months)
DATE: 02/02/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Prepare field scope of work for O&M (0.5 hr/month) 3 Project Manager JM Calculate Flow Rates and Analyze Vacuum Data (0.50 hrs/month) 3 Project Manager JM Detail system operations and any troubleshooting 2.5 Project Manager JM Summarize system performance (vacuum, pressure, flow) 3 Project Manager JM Summarize analytical results (influent, effluent, OVA) 2 Project Manager JM Prepare Semi-Annual Summary and Recommendations 4
17.5
Senior Technician WM Mob/demob (6 days) 9 Senior Technician WM Monthly O&M (4 hours per month) 24
Drafting Technician PM Summary Figures (As-Builts) 0.5 0.5
Staff Assistants JJ Data Entry (0.5 per month) 3 Staff Assistants JJ Summary Tables (O&M) 2 Staff Assistants JJ Publish Report/generate pdf 2
TOTAL LABOR 58
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 6 $720.00
TOTAL VEHICLE $720.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
$0.00 $0.00
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Influent TO-15 (VOCs) $200.00 2 $400.00 Influent EPA-18 (gaseous organics) $200.00 2 $400.00
Sample Shipping small cooler (overnight) $110.00 2 $220.00
TOTAL LAB $1,020.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 6 $240.00
Equipment (Analytical Related)
Air Sampling Pump $27.00 Day 2 $54.00 Anemometer $33.00 Day 6 $198.00 Vacuum Gauges $19.00 Day 6 $114.00 Summa Canisters $33.00 each 2 $66.00 PID $88.00 Day 2 $176.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $848.00
FINAL --7/24/96
SUBTASK 3: Utilities
DATE: 02/02/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Tampa Electric Utilities (Electrical) $1,000.00 month 6 $6,000.00 Handling Fee $20.00 month 6 $120.00
TOTAL $6,120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Equipment (Analytical Related)
Equipment (Other) $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 4: O&M (6 months)
DATE: 02/02/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions / Recommendations (RASR) 2
Project Manager JM Prepare field scope of work for O&M (0.5 hr/month) 3 Project Manager JM Calculate Flow Rates and Analyze Vacuum Data (0.50 hrs/month) 3 Project Manager JM Prepare RASR 4 Project Manager JM Site Visits and Syesm Run Time (RASR) 2 Project Manager JM Detail system operations and any troubleshooting (RASR) 2.5 Project Manager JM Summarize system performance (vacuum, pressure, flow) - RASR 3 Project Manager JM Summarize analytical results (influent, effluent, OVA) - RASR 2 Project Manager JM Groundwater sampling parameters 2 Project Manager JM Groundwater Analytical summary (5 zones) 4 Project Manager JM UIC parameters and TOC data summary 2 Project Manager JM Laboratory Data Validation 2 Project Manager JM Conclusions/Recommendations (RASR) 4
33.5
Senior Technician WM Mob/demob (9 days) 13.5 Senior Technician WM Monthly O&M (4 hours per month) 24 Senior Technician WM Full round of water levels (49 total) 3.5 Senior Technician WM Groundwater Sampling (15 wells) 22.5
63.5
Senior Technician SA Mob/demob from Tampa (3 days) 4.75 Senior Technician SA Full round of water levels (49 total) 3.5 Senior Technician SA Groundwater Sampling (14 wells) 21
29.25
Drafting Technician PM Summary Figures (As-Builts) 0.5 Drafting Technician PM Prepare GW Flow Figures (5 zones) 4 Drafting Technician PM Prepare GW Analytical Figures (5 zones) 4
8.5
Staff Assistants JJ O&M Data Entry (0.5 per month) 3 Staff Assistants JJ GW Data Entry (49 wls, 29 gw samples) 4 Staff Assistants JJ GW Update summary tables (wl, parameter, analytical, uic) 3 Staff Assistants JJ Summary Tables (O&M) 2 Staff Assistants JJ Publish Report/generate pdf 2
TOTAL LABOR 150.75
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 9 $1,080.00
TOTAL VEHICLE $1,080.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Disposal $125 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Influent TO-15 (VOCs) $200.00 2 $400.00 Influent EPA-18 (gaseous organics) $200.00 2 $400.00
VOHs EPA Method 8260 $73.00 28 $2,044.00 MW002, MW004, MW006, MW017, MW042, MW029, MW031, MW032, MW033, MW034, MW045, MW047, MW007, MW016, MW019, MW024, MW025, MW028, MW035, MW038, MW040, MW044, MW009, MW014, MW015, MW008, MW022, and MW037 VOC Full List EPA Method 8260 $150.00 1 $150.00 MW001
TOC 9060 $30.00 8 $240.00 MW001, 6, 7, 25, 28, 29, 31, 33
TDS SM2540C $16.00 9 $144.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33
TRPH FL-PRO $88.00 9 $792.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33
sodium 6010 $13.50 9 $121.50 MW001, 7, 24, 25, 28, 29, 31, 32, 33 ammonia EPA 350.1 $24.00 9 $216.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33 nitrate 353.2 $23.00 9 $207.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33 molbdenum 6010 $13.50 9 $121.50 MW001, 7, 24, 25, 28, 29, 31, 32, 33 chloride 300 $24.00 9 $216.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33 sulfate 300 $21.00 9 $189.00 MW001, 7, 24, 25, 28, 29, 31, 32, 33 iron 6010 $13.50 9 $121.50 MW001, 7, 24, 25, 28, 29, 31, 32, 33 dissolved gases RSK175 $180.00 8 $1,440.00 MW001, 6, 7, 25, 28, 29, 31, 33
Sample Shipping Large Cooler overnight $150.00 2 $300.00 Sample Shipping small cooler (overnight) $110.00 2 $220.00
Ice $6.50 2 $13.00
TOTAL LAB $7,335.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 9 $360.00
Equipment (Analytical Related)
Air Sampling Pump $27.00 Day 2 $54.00 Anemometer $33.00 Day 6 $198.00 Vacuum Gauges $19.00 Day 6 $114.00 Summa canisters $33.00 each 2 $66.00 PID $88.00 Day 2 $176.00 Groundwater Sampling Kit (shallow) $290.00 day 2 $580.00 Groundwater Sampling Kit (Deep) $415.00 day 2 $830.00 Poly Tubing $0.30 ft 1349 $404.70 Silicon Tubing $3.00 ft 29 $87.00
Equipment (Other)
Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $2,969.70
FINAL --7/24/96 Page 5
SUBTASK 5: Utilities
DATE: 02/02/24
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Tampa Electric Utilities (Electrical) $1,000.00 month 6 $6,000.00 Handling Fee $20.00 month 6 $120.00
TOTAL $6,120.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Equipment (Analytical Related)
Equipment (Other) $0.00
TOTAL EQUIPMENT $0.00
COST PROPOSAL FOR TASK DC012D
<Nu Way Cleaners, Inc./FDEP #ERIC_4701>
< Operations & Maintenance (Twelve Months)> (April 2024 through March 2025)
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD submitted a Site Assessment Report/Interim Source Removal Plan (SAR/ISRP) for the Nu-Way Cleaners, Inc. site located in Plant City, Hillsborough County, in July 2015. The SAR/ISRP was approved and the soil vapor extraction (SVE) system was installed in April 2016. Startup of the SVE system occurred on May 20, 2016. Although the system has likely removed the majority of available mass in the vadose zone, additional operations are recommended as part of the recently approved RAP in order to mitigate and potential vapors generated during enhanced groundwater bioremediation.
Task DC012D includes twelve (12) additional months of operation of the SVE system (April 2024 through March 2025) and annual groundwater monitoring. O&M will include monthly site visits and quarterly air sampling. During monthly O&M site visits, the remedial system operation will be verified and performance monitoring will be conducted. Performance monitoring will include determining and adjusting operating conditions to maximize mass recovery.
Subtask 1: Project Management Subtask 1 includes all tasks associated with management of six (6) months of O&M, sampling, and reporting at the Nu-Way Cleaner site.
Subtask 2: O&M (April 2024 through September 2024) During the operational period, GHD will conduct monthly Operations and Maintenance (O&M) site visits. During monthly site visits, the SVE system operations will be verified. The system operational conditions will be recorded. These conditions include the current status of each SVE well (open/closed), vacuum readings at wellheads, flow readings (total and well), hour meter readings, and water accumulation. During monthly site visits, the SVE operations will be modified (as directed by the Engineer) in order to optimize mass recovery. Verification of radius of influence may also be conducted. During quarterly site visits, field screening measurements will be recorded for each SVE well. Sampling will be conducted at effluent ports for laboratory analysis. All vapor samples will be analyzed for the presence of volatile organics by Method TO-15 and air phase hydrocarbons by MADEP APH Method.
After six months of operation and receipt of analytical data, an email summary will be prepared including recommendations for additional operations and/or modifications. The email summary will include update remedial action tables and any additional groundwater sampling information.
Subtask 3: Utilities (April 2024 through September 2024) Subtask 3 includes six (6) months of utility (electrical) service. The utility service was obtained through TECO and GHD will submit invoices for reimbursement.
Subtask 4: O&M (October 2024 through March 2025) During the operational period, GHD will conduct monthly Operations and Maintenance (O&M) site visits. During monthly site visits, the SVE system operations will be verified. The system operational conditions will be recorded. These conditions include the current status of each SVE well (open/closed), vacuum readings at wellheads, flow readings (total and well), hour meter readings, and water accumulation. During monthly site visits, the SVE operations will be modified (as directed by the Engineer) in order to optimize mass recovery. Verification of radius of influence may also be conducted. During quarterly site visits, field screening measurements will be recorded for each SVE well. Sampling will be conducted at effluent ports for laboratory analysis. All vapor samples will be analyzed for the presence of volatile organics by Method TO-15 and air phase hydrocarbons by MADEP APH Method.
After the 12th month of operation and receipt of analytical data, a Remedial Action Status Report (RASR) will be prepared including recommendations for additional operations and/or modifications. The RASR will include updated remedial action summary tables and will also summarize any additional groundwater sampling results obtained as part of the RAP implementation.
Annual groundwater performance monitoring is proposed for January 2025. Groundwater sampling will be conducted at twenty-nine (29) monitor wells including: MW001, MW002, MW004, MW006, MW017, MW042, MW029, MW031, MW032, MW033, MW034, MW045, MW047, MW007, MW016, MW019, MW024, MW025, MW028, MW035, MW038, MW040, MW044, MW009, MW014, MW015, MW008, MW022, and MW037. A full round of water levels will be gathered during this sampling event. Samples will be analyzed for the presence of volatile organic halocarbons, total organic carbon, total dissolved solids, total recoverable petroleum hydrocarbons, sodium, ammonia, nitrate, molybdenum, chloride, sulfate, iron, and/or dissolved gases per the RAP sampling schedule.
Subtask 5: Utilities (October 2024 through March 2025) Subtask 5 includes six (6) months of utility (electrical) service. The utility service was obtained through TECO and GHD will submit invoices for reimbursement.
Deliverables:
Deliverable Deliverable Due Date
Semi-Annual Summary 10/23/24
Paid Utilities ($6,00 cost reimbursement and $120 handling fee).
April 2024 through September 2024 11/29/24
Remedial Action Status Report 5/9/25
Paid Utilities ($6,00 cost reimbursement and $120 handling fee).
October 2024 through March 2025 5/30/25
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.