Task Assignment DC016C Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW684. The task assignment authorizes GHD Services, Inc. to conduct groundwater monitoring and PFAS sampling at Island Cleaners, located at 2445 Periwinkle Way in Sanibel, Lee County, Florida (FDEP Project Number ERIC_4836). The document was executed on February 5, 2025, with a completion date of August 22, 2025. Key personnel include Mackenzie Childs (FDEP Project Manager) and Brian Moore (Contractor's Project Manager for GHD Services, Inc.).
The task assignment is structured as three subtasks with a total value of $13,329.11 on a fixed unit rate basis. Subtask 1 comprises project management activities calculated at 13% of direct labor costs ($759.59). Subtask 2 involves groundwater monitoring at eleven monitoring wells (MW001, MW006, MW009, MW010, MW013, MW017, MW019, MW020, MW021, MW022, and MW023), including water level collection from 21 total wells and groundwater sampling with volatile organic compound analysis using EPA Method 8260, valued at $6,670.13. Subtask 3 includes PFAS sampling at ten monitoring wells with analytical testing valued at $5,823.43. The work requires 62.73 total labor hours and includes costs for vehicle rental ($240.00), laboratory analysis ($4,718.00), field equipment and expendables ($970.80), and subcontractor services for industrial waste disposal ($137.50). Deliverables consist of a Field Notes and Groundwater Monitoring Report and PFAS field notes with analytical data, both due May 22, 2025. Payment is contingent upon FDEP approval of the Groundwater Monitoring Report for Subtasks 1 and 2, and completion of PFAS sampling for Subtask 3.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
DC016C Completion August 22, 2025
This Task Assignment authorizes GHD Services, Inc to conduct groundwater monitoring and PFAS sampling at Island Cleaners.
Mackenzie Childs 850-245-8929 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813-971-3882
ERIC_4836
2445 Periwinkle Way, Lee County, Sanibel, FL 33957
Island Cleaners
Contractor Contractor
✔ $ 13,329.11
$ 13,329.11
Scope of Work
GHD Services, Inc.
Contractor
Brian Moore Digitally signed by Brian Moore Date: 2025.02.05 13:06:24 -05'00'
Mubeen Darji
Mubeen Darji, P.E. Digitally signed by Mubeen Darji, P.E.
Date: 2025.02.05 08:22:40 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtasks 1 & 2: Groundwater Sampling + Project Management 05/22/2025
Subtask 3: PFAS Sampling 05/22/2025
Subtasks 1 & 2: FDEP approval of Groundwater Monitoring Report + Project Management $ 7,505.68
Subtask 3: PFAS Sampling $ 5,823.43
$ 13,329.11
HW684
DC016C
RRonn DeSantis Governor
JJeanette Nuñez Lt. Governor
Shawnn Hamilton Secretary
TO:
FROM:
DATE:
SUBJECT:
FLORIDAA DEPARTMENTT OFF
Environmentall Protectionn
Bob Martinez Center 2600 Blair Stone Road
Tallahassee, FL 32399-2400
FDEP COST ESTIMATE
Contractor: GHD Services Inc.
Date: 2/4/2025
Task #: DC016C SubTask 1 Project Management SubTask 6
Site: Island Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 PFAS Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.76 Project Manager JM 5.48 5.48 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$58.35 Sr Professional Engineer JH 2.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sci GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $51.76 Project Manager/ Enginee JM 18.00 13.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.65 Staff Engineer/Scientist JW 17.00 11.50 5.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.81 Staff Engineer/Scientist MM 13.00 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.69 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25.00 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.01 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.87 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.02 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.65 Junior Technician CD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.58 Drafting Technician KJ 3.00 2.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.06 Administrative Assistant JJ 4.25 2.75 1.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 62.73 5.48 43.25 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,467.32 $283.85 $1,616.57 $566.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $3,202.59 $368.44 $2,098.31 $735.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $932.65 $107.30 $611.06 $214.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,602.56 $759.59 $4,325.94 $1,517.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 2/4/2025
Task #: DC016C SubTask 1 Project Management SubTask 6
Site: Island Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 PFAS Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 TTravel
Vehicle Rental $240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $$240.00 $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SSubcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SSubcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $12.50 $12.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $137.50 $137.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LLaboratory Analytical Costs $4,583.00 $803.00 $3,780.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $135.00 $58.50 $76.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $4,718.00 $861.50 $3,856.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FField Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $60.00 $40.00 $20.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $810.80 $652.60 $158.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $970.80 $792.60 $178.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SSubtotal $12,668.86 $759.59 $6,237.54 $5,671.73 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CCompletion Fee $660.25 $75.96 $432.59 $151.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TTotal Estimated Cost $13,329.11 $835.55 $6,670.13 $5,823.43 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $13,329.11 Auto-Calculated
Final Total Cost: $13,329.11 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Island Cleaners SUBTASK 2: Groundwater Monitoring
DATE: 2/4/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 1
Project Manager JM Prepare field scope of work/contact owner 1 Project Manager JM Previous monitoring summary/results 1 Project Manager JM Profile IDW 1 Project Manager JM Groundwater sampling methods/analysis 2 Project Manager JM Field parameter evaluation 2 Project Manager JM Groundwater flow evaluation 2 Project Manager JM Groundwater analytical evaluation 2 Project Manager JM Laboratory Data Validation 1 Project Manager JM Conclusions/Recommendations 1
Staff Engineer/Scientist JW Mob/demob (1 day) 2 Staff Engineer/Scientist JW Water Levels (all wells - 21 total) 2 Staff Engineer/Scientist JW Groundwater Sampling (5 wells) 7.5
11.5
Staff Engineer/Scientist JW Mob/demob (1 day) 2 Staff Engineer/Scientist JW Water Levels (all wells - 21 total) 2 Staff Engineer/Scientist JW Groundwater Sampling (6 wells) 9
CADD Design KJ Update groundwater flow maps (shallow) 1 CADD Design KJ Update groundwater analytical map 1
Staff Assistant JJ Data entry (21 wls and 11 gw samples) 0.75 Staff Assistant JJ Summary tables (water quality, elevation, analytical) 1 Staff Assistant JJ Publish report generate pdf 1
2.75
TOTAL LABOR 43.25
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Disposal $125 drum 1 $125.00
TOTAL $125.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs $73.00 11 $803.00 MW001, 6, 9, 10, 13, 17, 19, 20, 21, 22, 23 sample shipping (Two Day) small cooler $52.00 1 $52.00 ice $6.50 1 $6.50
TOTAL LAB $861.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Groundwater Sampling Kit $290.00 Day 2 $580.00 1 per technician Poly Tubing $0.30 ft 132 $39.60 Silicon Tubing $3.00 ft 11 $33.00 drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $792.60
FINAL --7/24/96
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Island Cleaners SUBTASK 3: PFAS Sampling
DATE: 2/4/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations (PFAS) 1
Project Manager JM Prepare field scope of work (PFAS) 1 Project Manager JM Groundwater analytical evaluation (PFAS) 2 Project Manager JM Laboratory Data Validation (PFAS) 1 Project Manager JM Conclusions/Recommendations (PFAS) 1
Staff Engineer/Scientist JW Mob/demob (1 day) 2 Staff Engineer/Scientist JW Groundwater Sampling (2 wells) 3.5
5.5
CADD Design KJ Update groundwater analytical map (PFAS) 1
Staff Assistant JJ Data entry (2 gw samples) 0.5 Staff Assistant JJ Summary tables (PFAS analytical) 1
1.5
TOTAL LABOR 14
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
PFAS $315.00 12 $3,780.00 MW001, 6, 9, 10, 12, 20, 21, 22, 23, 24, Blank, Duplicate sample shipping (Two Day) large cooler $70.00 1 $70.00 ice $6.50 1 $6.50
TOTAL LAB $3,856.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 0.5 $20.00
Groundwater Sampling Kit $290.00 Day 0.5 $145.00 Poly Tubing $0.30 ft 24 $7.20 Silicon Tubing $3.00 ft 2 $6.00
TOTAL EQUIPMENT $178.20
FINAL --7/24/96
COST PROPOSAL FOR TASK DC016C
<Island Cleaners, Inc./FDEP #ERIC_4836>
<Groundwater Monitoring >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD submitted an Interim Source Removal Plan (ISRP) in May 2024 for the Island Cleaners, Inc. site located in Sanibel, Lee County. The ISRP recommended soil removal and monitoring.
In order to establish current groundwater quality conditions at the site, groundwater sampling is recommended as part of Task DC016C. A summary of the proposed sampling is included below.
Subtask 1: Project Management Subtask 1 includes all project management activities associated with completion of groundwater sampling and reporting.
Subtask 2: Groundwater Monitoring Groundwater sampling is proposed at site monitoring wells MW001, MW006, MW009, MW010, MW013, MW017, MW019, MW020, MW021, MW022, and MW023. The sampling will include gathering water levels from all existing wells (21 total) and conducting groundwater sampling in accordance with FDEP Standard Operating Procedures. All groundwater samples will be analyzed for the presence of volatile organic halocarbons by EPA Method 8260.
Following receipt of groundwater analytical data, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results for both sampling events. The report will also include recommendations regarding the next step toward site rehabilitation.
Subtask 3: PFAS Sampling As part of subtask 3, GHD will also conduct additional PFAS sampling to determine the extent of PFAS impacts identified in June 2023. Specifically, monitoring wells MW001, MW006, MW009, MW010, MW012, MW020, MW021, MW022, MW023, and MW024 will be sampled and analyzed for PFAS. Groundwater sampling will be conducted in accordance with FDEP and GHD SOPs for PFAS sampling. Monitoring wells MW001, MW006, MW009, MW010, MW020, MW021, MW022, and MW023 will be sampled as part of subtask 2. Monitoring wells MW012 and MW024 will be sampled for PFAS and an equipment blank and duplicate will also be collected.
The results of the PFAS sampling will be incorporated into the Groundwater Monitoring Report prepared as part of subtask 2. The PFAS results will be presented along with conclusions/recommendations.
Deliverables:
Deliverable Deliverable Due Date
Field Notes and Groundwater Monitoring Report 5/22/25
PFAS field notes and analytical data 5/22/25
408 Ditmar Street
Pensacola, FL 32503
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit False Mobilization (No drum found) $ 85.00 Per Stop T&D - Non-Haz Soil $ 110.00 Per Drum T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street Pensacola, FL 32503
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358 p y, Robert Donado
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER: Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups. **Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.