CN-370000-HW684-DC005A.pdf

PDF 2 MB Posted

Attached to
Master Agreement FL|HW684|68b160b8827755ddf560142dd2a41e53
Contract number
HW684
Issued by
Florida

About this file

This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for environmental assessment work at the former Michael the Cleaner site located at 3432 Clark Road, Sarasota, Sarasota County, Florida. The task assignment is numbered DC005A and operates under Contract Number HW684. Kevin Kane serves as the FDEP Department Project Manager, while Brian Moore is the Contractor's Project Manager for GHD Services, Inc.

GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former drycleaner facility, with work to be completed in accordance with a scope of work and cost proposal submitted on January 25, 2022. The project includes two subtasks: Subtask 1 covers project management calculated at 13% of direct labor costs, and Subtask 2 involves soil and groundwater testing, including advancement of eleven shallow soil borings, sampling at multiple depths, and groundwater sampling from eight monitor wells. Soil and groundwater samples will be analyzed for volatile organic compounds using EPA Method 8260. The primary deliverable is a Supplemental Site Assessment Report due April 28, 2022, with a total task assignment completion date of July 29, 2022. The total fixed unit rate contract value is $12,640.01, with payment due upon submittal and FDEP approval of the Supplemental Site Assessment Report and Project Management deliverables. The cost estimate includes direct labor of $2,529.32, overhead and fringe benefits totaling $4,239.14, laboratory analytical costs of $3,208.00, subcontractor costs of $110.00, field equipment expenses of $1,516.70, vehicle rental of $360.00, and a completion fee of $676.85.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS02A.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
CN-370000-HW684-DC046B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC005A Completion July 29, 2022

GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former Michael the Cleaner site. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 25, 2022.

Kevin Kane (850) 245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore (813) 257-0658

ERIC_5426

3432 Clark Rd, Sarasota, Sarasota County

Michael the Cleaner

✔ $ 12,640.01

$ 12,640.01

Scope of Work

Brian Moore

Contract Manager

Brian Moore Digitally signed by Brian Moore Date: 2022.02.17 21:02:03 -05'00'

William E. Burns, Jr.

William E. Burns, Jr. Digitally signed by William E. Burns, Jr.

Date: 2022.02.17 07:33:34 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Supplemental Site Assessment Report + Project Management 04/28/2022

Subtasks 1 & 2: Upon submittal and FDEP approval of the Supplemental Site Assessment Report + Project Management $ 12,640.01

$ 12,640.01

HW684

DC005A

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

TO: HW684 Contract File

FROM: Kevin Kane, Contract Manager

DATE: January 21, 2022

SUBJECT: Task Assignment DC005A

Michael the Cleaner

ERIC_5426

Assessment

GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former Michael the Cleaner site. Specific subtasks are detailed below:

Subtask 1: Project Management Project management is calculated at 13% of direct labor costs.

Subtask 2: Soil and Groundwater Assessment GHD personnel will mobilize to the site and complete soil sampling at eleven (11) locations. The soil sampling will involve the advancement of eleven (11) shallow soil borings in close proximity to the former drycleaner facility. Soil borings will be advanced with a hand auger and soil samples will be field screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-3 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs by EPA Method 8260.

During the same mobilization, GHD will conduct groundwater sampling. Prior to sampling, depth to water will be gathered at all site wells (17 total). Following depth to water measurements, GHD personnel will sample monitor wells MW006, MW007, MW008, MW010, MW011, MW012, MW013, and MW015. Groundwater sampling will be conducted in accordance with FDEP Standard Operating Procedures. Groundwater samples will be analyzed for VOHs by EPA Method 8260.

Following receipt of analytical results, GHD will prepare a Supplemental Site Assessment Report (SAR) with a summary of historical and current soil and groundwater sampling results. The SAR will include recommendations regarding source removal and additional testing.

Subcontractors for drilling and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.

The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed January 22, 2020.

This work will be conducted in line with the scope of work included with GHD’s proposal, received January 25, 2022.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is April 28, 2022, and the completion date for the task assignment is July 29, 2022.

The final cost total for Task Assignment DC005A is $12,640.01.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/16/22

Task #: DC005A SubTask 1 Project Management SubTask 6

Site: Michael the Cleaner SubTask 2 Soil and Groundwater Testing SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$40.12 Project Manager JM 7.30 7.3 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$46.33 Sr Professional Engineer JH 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$43.28 Professional Engineer/Sc GE 17.00 17.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 30.75 30.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 30.75 30.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 96.80 7.30 89.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,529.32 $290.98 $2,238.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $3,283.06 $377.69 $2,905.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $956.08 $109.99 $846.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,768.46 $778.66 $5,989.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 02/16/22

Task #: DC005A SubTask 1 Project Management SubTask 6

Site: Michael the Cleaner SubTask 2 Soil and Groundwater Testing SubTask 7

Activity/Phase: Assessment SubTask 3 SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $2,993.00 $2,993.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $215.00 $215.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,208.00 $3,208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,396.70 $1,396.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,516.70 $1,516.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $11,963.16 $778.66 $11,184.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $676.85 $77.87 $598.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,640.01 $856.53 $11,783.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Michael the Cleaner SUBTASK 2: Soil and Groundwater Testing

DATE: 02/16/22

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr Professional Engineer JH Conclusions/Recommendations 2

Professional Engineer/Scientist GE Prepare field scope of work and laboratory coordination 1 Professional Engineer/Scientist GE Uility Locate 0.5 Professional Engineer/Scientist GE Coordination with property owner for work in pharmacy area 1 Professional Engineer/Scientist GE Review field package (QA/QC) 1 Professional Engineer/Scientist GE Background information for Assessment Summary 1 Professional Engineer/Scientist GE Soil Sampling Methodology 2 Professional Engineer/Scientist GE Groundwater Sampling Methodology 1 Professional Engineer/Scientist GE Soil Sampling Results 2 Professional Engineer/Scientist GE Groundwater Flow Evaluation (shallow/int/deep) 2 Professional Engineer/Scientist GE Groundwater Sampling Results (shallow/int/deep) 2 Professional Engineer/Scientist GE QA/QC Laboratory Data 1.5 Professional Engineer/Scientist GE Conclusions/Recommendations 2

Senior Technician SA Mob/demob (3 days) 9 Senior Technician SA Soil Borings (11 borings - 1.25 hour per boring) 13.75 Senior Technician SA Water Levels (17 total) 2 Senior Technician SA Groundwater Sampling (4 wells) 6

30.75

Junior Technician WO Mob/demob (3 days) 9 Junior Technician WO Soil Borings (11 borings - 1.25 hour per boring) 13.75 Junior Technician WO Water Levels (17 total) 2 Junior Technician WO Groundwater Sampling (4 wells) 6

30.75

Drafting Technician PM 12 boring locations with soil data 1.5 Drafting Technician PM Water level contours (3 zones) 1.5 Drafting Technician PM Groundwater data (shallow/int/deep) 1

Administrative Assistant DA Data Entry (10 soil borings, 17 wl, 8 gw) 1.5 Administrative Assistant DA Update Summary Tables 1.5 Administrative Assistant DA Finalize pdf document 2

TOTAL LABOR 89.5

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin IDW Disposal 1 drum $100.00 $100.00

TOTAL $100.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOHs - soil EPA 8260 $73.00 33 $2,409.00 3 samples per location VOHs - gw EPA 8260 $73.00 8 $584.00 MW006, 7, 8, 10, 11, 12, 13, 15

SPLP (zero head space) $50.00 0 $0.00 VOHs Leachate analysis (8260) $73.00 0 $0.00 ice $6.50 2 $13.00 Shipping (soil) large cooler -overnight $150.00 1 $150.00 shipping (gw) small cooler - 2 day $52.00 1 $52.00

TOTAL LAB $3,208.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 3 $120.00

Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 2 $580.00 1 per technician Poly Tubing (HDPE) $0.30 ft 259 $77.70 Silicon Tubing $3.00 ft 8 $24.00 Soil Sampling Kit (through concrete) $235.00 day 1 $235.00 Encore Sampler $16.00 each 30 $480.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $1,516.70

FINAL --7/24/96

COST PROPOSAL FOR TASK DC005A

<Michael the Cleaner / FDEP ERIC_5426>

< Soil and Groundwater Testing >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) previously completed initial assessment at the former Michael the Cleaner site located in Sarasota, Sarasota County, and a Site Assessment Report was submitted in April 2021. The assessment identified impacted groundwater and soil beneath the site. In anticipation of potential source removal, additional soil testing was recently recommended along with groundwater monitoring. Task DC005A includes soil and groundwater sampling.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the soil and groundwater testing activities at the former Michael the Cleaner site.

Subtask 2: Soil and Groundwater Sampling Initially, GHD will coordinate site access with the current property owner. GHD personnel will mobilize to the site and complete soil sampling at eleven (11) locations. The soil sampling will involve the advancement of eleven (11) shallow soil borings in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5- 2, and 2-3 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs by EPA Method 8260.

During the same mobilization, GHD will conduct groundwater sampling. Prior to sampling, depth to water will be gathered at all site wells (17 total). Following depth to water measurements, GHD personnel will sample monitor wells MW006, MW007, MW008, MW010, MW011, MW012, MW013, and MW015. Groundwater sampling will be conducted in general accordance with FDEP Standard Operating Procedures. Groundwater samples will be analyzed for VOHs by EPA Method 8260.

Following receipt of analytical results, GHD will prepare a Supplemental Site Assessment Report (SSAR) with a summary of historical and current soil and groundwater sampling results. The SSAR will include recommendations regarding source removal and additional testing.

Deliverables:

Deliverable Deliverable Due Date

Supplemental Site Assessment Report 4/28/22

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

March 16, 2020

Re: IP Cleaners - Miami, FL

Mr. Moore:

The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png

$95.00 per drum plus $150.00 stop charge Have a great day

Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.

P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com

From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami

Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks

Brian Moore, PE

GHD

Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect

WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION

mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

This e-mail has been scanned for viruses

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22

2 Subtask 1: Project Management

58 days Tue 2/8/22 Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

54 days Mon 2/14/22

Thu 4/28/22

4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22

5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22

6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22

7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22

1/16 1/23 1/30 2/6 2/13 2/20 February

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County

Project: Schedule - TA_005A Date: Tue 1/25/22

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22

2 Subtask 1: Project Management

58 days Tue 2/8/22 Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

54 days Mon 2/14/22

Thu 4/28/22

4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22

5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22

6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22

7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22

Gabrielle Enos

Skylar Albritton,William Ouchie

Skylar Albritton,William Ouchie

2/27 3/6 3/13 3/20 3/27 4/3 March April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22

2 Subtask 1: Project Management

58 days Tue 2/8/22 Thu 4/28/22

3 Subtask 2: Soil and Groundwater Sampling

54 days Mon 2/14/22

Thu 4/28/22

4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22

5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22

6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22

7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22 Jeremy Hess,Gabrielle Enos,Peter M

4/10 4/17 4/24 5/1 5/8 5/15 May

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County

File details come from the government source that posted it. Updated .