This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for environmental assessment work at the former Michael the Cleaner site located at 3432 Clark Road, Sarasota, Sarasota County, Florida. The task assignment is numbered DC005A and operates under Contract Number HW684. Kevin Kane serves as the FDEP Department Project Manager, while Brian Moore is the Contractor's Project Manager for GHD Services, Inc.
GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former drycleaner facility, with work to be completed in accordance with a scope of work and cost proposal submitted on January 25, 2022. The project includes two subtasks: Subtask 1 covers project management calculated at 13% of direct labor costs, and Subtask 2 involves soil and groundwater testing, including advancement of eleven shallow soil borings, sampling at multiple depths, and groundwater sampling from eight monitor wells. Soil and groundwater samples will be analyzed for volatile organic compounds using EPA Method 8260. The primary deliverable is a Supplemental Site Assessment Report due April 28, 2022, with a total task assignment completion date of July 29, 2022. The total fixed unit rate contract value is $12,640.01, with payment due upon submittal and FDEP approval of the Supplemental Site Assessment Report and Project Management deliverables. The cost estimate includes direct labor of $2,529.32, overhead and fringe benefits totaling $4,239.14, laboratory analytical costs of $3,208.00, subcontractor costs of $110.00, field equipment expenses of $1,516.70, vehicle rental of $360.00, and a completion fee of $676.85.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC005A Completion July 29, 2022
GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former Michael the Cleaner site. All work will be conducted in accordance with the scope of work and cost proposal submitted on January 25, 2022.
Kevin Kane (850) 245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore (813) 257-0658
ERIC_5426
3432 Clark Rd, Sarasota, Sarasota County
Michael the Cleaner
✔ $ 12,640.01
$ 12,640.01
Scope of Work
Brian Moore
Contract Manager
Brian Moore Digitally signed by Brian Moore Date: 2022.02.17 21:02:03 -05'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.02.17 07:33:34 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Supplemental Site Assessment Report + Project Management 04/28/2022
Subtasks 1 & 2: Upon submittal and FDEP approval of the Supplemental Site Assessment Report + Project Management $ 12,640.01
$ 12,640.01
HW684
DC005A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: January 21, 2022
SUBJECT: Task Assignment DC005A
Michael the Cleaner
ERIC_5426
Assessment
GHD Services, Inc. will conduct soil sampling and groundwater sampling at the former Michael the Cleaner site. Specific subtasks are detailed below:
Subtask 1: Project Management Project management is calculated at 13% of direct labor costs.
Subtask 2: Soil and Groundwater Assessment GHD personnel will mobilize to the site and complete soil sampling at eleven (11) locations. The soil sampling will involve the advancement of eleven (11) shallow soil borings in close proximity to the former drycleaner facility. Soil borings will be advanced with a hand auger and soil samples will be field screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5-2, and 2-3 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs by EPA Method 8260.
During the same mobilization, GHD will conduct groundwater sampling. Prior to sampling, depth to water will be gathered at all site wells (17 total). Following depth to water measurements, GHD personnel will sample monitor wells MW006, MW007, MW008, MW010, MW011, MW012, MW013, and MW015. Groundwater sampling will be conducted in accordance with FDEP Standard Operating Procedures. Groundwater samples will be analyzed for VOHs by EPA Method 8260.
Following receipt of analytical results, GHD will prepare a Supplemental Site Assessment Report (SAR) with a summary of historical and current soil and groundwater sampling results. The SAR will include recommendations regarding source removal and additional testing.
Subcontractors for drilling and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.
The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed January 22, 2020.
This work will be conducted in line with the scope of work included with GHD’s proposal, received January 25, 2022.
Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is April 28, 2022, and the completion date for the task assignment is July 29, 2022.
The final cost total for Task Assignment DC005A is $12,640.01.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/16/22
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Soil and Groundwater Testing SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.12 Project Manager JM 7.30 7.3 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$46.33 Sr Professional Engineer JH 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 17.00 17.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.17 Staff Engineer/Scientist DB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 30.75 30.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 30.75 30.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 96.80 7.30 89.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,529.32 $290.98 $2,238.34 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $3,283.06 $377.69 $2,905.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $956.08 $109.99 $846.09 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,768.46 $778.66 $5,989.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 02/16/22
Task #: DC005A SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Soil and Groundwater Testing SubTask 7
Activity/Phase: Assessment SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,993.00 $2,993.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $215.00 $215.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,208.00 $3,208.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,396.70 $1,396.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,516.70 $1,516.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $11,963.16 $778.66 $11,184.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $676.85 $77.87 $598.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $12,640.01 $856.53 $11,783.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Michael the Cleaner SUBTASK 2: Soil and Groundwater Testing
DATE: 02/16/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 2
Professional Engineer/Scientist GE Prepare field scope of work and laboratory coordination 1 Professional Engineer/Scientist GE Uility Locate 0.5 Professional Engineer/Scientist GE Coordination with property owner for work in pharmacy area 1 Professional Engineer/Scientist GE Review field package (QA/QC) 1 Professional Engineer/Scientist GE Background information for Assessment Summary 1 Professional Engineer/Scientist GE Soil Sampling Methodology 2 Professional Engineer/Scientist GE Groundwater Sampling Methodology 1 Professional Engineer/Scientist GE Soil Sampling Results 2 Professional Engineer/Scientist GE Groundwater Flow Evaluation (shallow/int/deep) 2 Professional Engineer/Scientist GE Groundwater Sampling Results (shallow/int/deep) 2 Professional Engineer/Scientist GE QA/QC Laboratory Data 1.5 Professional Engineer/Scientist GE Conclusions/Recommendations 2
Senior Technician SA Mob/demob (3 days) 9 Senior Technician SA Soil Borings (11 borings - 1.25 hour per boring) 13.75 Senior Technician SA Water Levels (17 total) 2 Senior Technician SA Groundwater Sampling (4 wells) 6
30.75
Junior Technician WO Mob/demob (3 days) 9 Junior Technician WO Soil Borings (11 borings - 1.25 hour per boring) 13.75 Junior Technician WO Water Levels (17 total) 2 Junior Technician WO Groundwater Sampling (4 wells) 6
30.75
Drafting Technician PM 12 boring locations with soil data 1.5 Drafting Technician PM Water level contours (3 zones) 1.5 Drafting Technician PM Groundwater data (shallow/int/deep) 1
Administrative Assistant DA Data Entry (10 soil borings, 17 wl, 8 gw) 1.5 Administrative Assistant DA Update Summary Tables 1.5 Administrative Assistant DA Finalize pdf document 2
TOTAL LABOR 89.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW Disposal 1 drum $100.00 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs - soil EPA 8260 $73.00 33 $2,409.00 3 samples per location VOHs - gw EPA 8260 $73.00 8 $584.00 MW006, 7, 8, 10, 11, 12, 13, 15
SPLP (zero head space) $50.00 0 $0.00 VOHs Leachate analysis (8260) $73.00 0 $0.00 ice $6.50 2 $13.00 Shipping (soil) large cooler -overnight $150.00 1 $150.00 shipping (gw) small cooler - 2 day $52.00 1 $52.00
TOTAL LAB $3,208.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 3 $120.00
Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 2 $580.00 1 per technician Poly Tubing (HDPE) $0.30 ft 259 $77.70 Silicon Tubing $3.00 ft 8 $24.00 Soil Sampling Kit (through concrete) $235.00 day 1 $235.00 Encore Sampler $16.00 each 30 $480.00
Equipment (Other) $0.00
TOTAL EQUIPMENT $1,516.70
FINAL --7/24/96
COST PROPOSAL FOR TASK DC005A
<Michael the Cleaner / FDEP ERIC_5426>
< Soil and Groundwater Testing >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) previously completed initial assessment at the former Michael the Cleaner site located in Sarasota, Sarasota County, and a Site Assessment Report was submitted in April 2021. The assessment identified impacted groundwater and soil beneath the site. In anticipation of potential source removal, additional soil testing was recently recommended along with groundwater monitoring. Task DC005A includes soil and groundwater sampling.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the soil and groundwater testing activities at the former Michael the Cleaner site.
Subtask 2: Soil and Groundwater Sampling Initially, GHD will coordinate site access with the current property owner. GHD personnel will mobilize to the site and complete soil sampling at eleven (11) locations. The soil sampling will involve the advancement of eleven (11) shallow soil borings in close proximity to the former drycleaner facility. Soil borings will be advanced with a stainless steel hand auger and soil samples will be field-screened with an OVA. Soil samples will be gathered from 0-0.5, 0.5- 2, and 2-3 ft bls at all soil boring locations for laboratory analysis. Soil samples will be submitted to a fixed laboratory for analysis for the presence of VOHs by EPA Method 8260.
During the same mobilization, GHD will conduct groundwater sampling. Prior to sampling, depth to water will be gathered at all site wells (17 total). Following depth to water measurements, GHD personnel will sample monitor wells MW006, MW007, MW008, MW010, MW011, MW012, MW013, and MW015. Groundwater sampling will be conducted in general accordance with FDEP Standard Operating Procedures. Groundwater samples will be analyzed for VOHs by EPA Method 8260.
Following receipt of analytical results, GHD will prepare a Supplemental Site Assessment Report (SSAR) with a summary of historical and current soil and groundwater sampling results. The SSAR will include recommendations regarding source removal and additional testing.
Deliverables:
Deliverable Deliverable Due Date
Supplemental Site Assessment Report 4/28/22
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 16, 2020
Re: IP Cleaners - Miami, FL
Mr. Moore:
The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png
$95.00 per drum plus $150.00 stop charge Have a great day
Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami
Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks
Brian Moore, PE
GHD
Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION
mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail has been scanned for viruses
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22
2 Subtask 1: Project Management
58 days Tue 2/8/22 Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
54 days Mon 2/14/22
Thu 4/28/22
4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22
5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22
6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22
7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22
1/16 1/23 1/30 2/6 2/13 2/20 February
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County
Project: Schedule - TA_005A Date: Tue 1/25/22
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22
2 Subtask 1: Project Management
58 days Tue 2/8/22 Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
54 days Mon 2/14/22
Thu 4/28/22
4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22
5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22
6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22
7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22
Gabrielle Enos
Skylar Albritton,William Ouchie
Skylar Albritton,William Ouchie
2/27 3/6 3/13 3/20 3/27 4/3 March April
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 1/25/22 Mon 2/7/22
2 Subtask 1: Project Management
58 days Tue 2/8/22 Thu 4/28/22
3 Subtask 2: Soil and Groundwater Sampling
54 days Mon 2/14/22
Thu 4/28/22
4 Field Work Preparation 3 wks Mon 2/14/22Fri 3/4/22
5 Soil Sampling 2 days Tue 3/8/22 Wed 3/9/22
6 Groundwater Sampling 1 day Thu 3/10/22 Thu 3/10/22
7 Summary Report 6 wks Fri 3/18/22 Thu 4/28/22 Jeremy Hess,Gabrielle Enos,Peter M
4/10 4/17 4/24 5/1 5/8 5/15 May
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the implementation of Task DC005A at the Michael the Cleaner site located in Sarasota, Sarasota County
File details come from the government source that posted it. Updated .