Document Summary
This document is a Task Assignment Change Order (TACO) executed between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. The change order amends Task Assignment BIL02E under Contract Number HW684 for environmental remediation work at the Former Polk County Fertilizer Site (Site ID: ERIC_13343) located in Haines City, Polk County, Florida. Megan Johnson serves as the FDEP Project Manager, while Brian Moore, P.E., Vice President, represents GHD Services, Inc. as the contractor's project manager.
The TACO authorizes additional soil sampling activities necessary to delineate contamination boundaries prior to finalizing the Interim Source Removal (ISR) Plan. Specifically, the change order increases the total task value from $10,911.55 to $39,370.79, representing a cost increase of $28,459.24. The scope modifications include three subtasks: (1) Project Management with a cost increase of $2,307.37; (2) ISR Plan review and collation with an increase of $1,590.71; and (3) Soil Assessment Activities, the primary driver of additional costs at $24,561.16, which encompasses 61 additional soil borings with multiple depth interval sampling for dieldrin and PAH analysis. The completion date has been extended from May 2, 2025 to June 30, 2025, providing 59 additional days. Invoice payments are scheduled upon FDEP approval of deliverables: $24,561.16 upon approval of analytical data and field notes (due 05/05/2025), and $14,809.63 upon approval of the project management and interim source removal plan (due 05/23/2025).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/17/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment Change Order This Change Order is entered into between the Parties named below and amends the Task Assignment (TA) and any previous TA Change Orders (TACO) as follows:
1. TA Number: TACO Number: Contract Number:
TACO Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department’s Project Manager: Department’s Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number) Project Name:
4. There are no changes to the TA compensation.
The compensation of the TA is changed to the amounts indicated below:
Amended Price Price Prior to TACO Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. There are no changes to the TA Expiration Date.
The TA Completion Date is changed from ______________ to ______________ (a total of ______ days).
6. There are no changes to the Attachments.
Attachment ___ is replaced with Attachment -____.
7. No Additional Changes.
Additional Changes:
8. All other terms and conditions of the TA remain in effect. If and to the extent that any inconsistencies may appear between the TA and this TACO, the provisions of this TACO shall control.
IN WITNESS WHEREOF, this TACO shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
BIL02E 1 HW684
This Task Assignment Change Order (TACO) authorizes additional soil sampling that is needed prior to writing the ISR Plan. This is being executed per the TACO request from GHD received on February 26, 2025.
Megan Johnson 850.245.8994 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813.971.3882
ERIC_13343
Former Polk County Fertilizer
✔ $ 39,370.79 $ 10,911.55
$ 39,370.79 $ 10,911.55 Completion
✔ Completion 05/02/2025 06/30/2025 59
✔ 1 1 1
GHD Services, Inc.
Contractor Brian Moore, P.E.
Vice President
Brian Moore Digitally signed by Brian Moore Date: 2025.03.06 09:08:34 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.03.03 16:35:03 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
HW684
BIL02E
$ 39,370.79
Analytical Data and Field Notes.
Interim Source Removal Plan; Project Management.
Department approval of Analytical Data and Field Notes (Subtask 3)
Department approval of Project Management and Interim Source Removal Plan (Subtasks 1 and 2)
05/05/2025
05/23/2025
$ 14,809.63
$ 24,561.16 www.FloridaDEP.gov
FFLORIDAA DEPARTMENTT OF
EEnvironmentall Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ronn DeSantis Governor
Alexiss A.. Lambert
Secretary
Memorandum TO: GHD Services Inc. HW684 Contract File
FROM: Megan Johnson, Contract Manager
DATE: March 3, 2025
SUBJECT: Negotiation Summary – BIL22, Change Order #1 - TA BIL02E C1 Former Polk County Fertilizer - Site ID # ERIC_13343 ISR Plan and Assessment Activities
This Task Assignment Change Order (TACO) authorizes additional soil sampling that is needed prior to writing the Interim Source Removal (ISR) Plan and extends the Task Assignment completion date. Specific changes are detailed below:
Subtask 1: Project Management The increase in overall task hours produced a change associated with Project Management. This change resulted in a cost actual increase of $2,307.37.
Subtask 2: Interim Source Removal Plan Under this subtask, GHD requests additional labor hours for staff to review and collate the findings from the additional soil sampling performed under subtask 3. This change resulted in a cost actual increase of $1,590.71.
Subtask 3: Soil Assessment Activities When GHD began developing excavation plans to be included in the ISR Plan, it was determined that additional delineation soil sampling was necessary to determine excavation boundaries for direct exposure exceedances for dieldrin and PAHs. Under this subtask, GHS will advance 61 additional soil borings and collect soil samples at multiple depth intervals. This addition resulted in a cost increase of $24,561.16.
Summary The Department’s BIL Contract Manager and GHD’s Contract Manager have both agreed to the above changes. All changes noted above represent a total overall cost increase of $28,459.24, as shown in the Final LOE. Due to a rounding error in Excel, the Delta LOE shows a change of $28,459.23, however this was corrected in the Final LOE. The changes were noted in the TACO Request received from GHD on February 26, 2025. The final cost associated with this TA increased from $10,911.55 to $39,370.79. Documentation of the changes is included in the attached TACO Request, the Delta LOE spreadsheet and the Final LOE spreadsheet, and the TACO form for BIL02E C1, prepared by the Department.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 3/3/2025
Task #: BIL002E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Former Polk County Fertilizer Site SubTask 7
Activity/Phase: Design SubTask 3 Soil Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.76 PProject Manager JM 23.38 23.38 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$66.59 Sr Professional Engineer GK 12.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $51.76 Project Manager/ Enginee JM 75.00 51.00 24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.65 Staff Engineer/Scientist JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.80 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.69 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25.00 Senior Technician SA 77.00 0.00 77.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.01 Senior Technician WM 77.00 0.00 77.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.87 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.02 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.65 Junior Technician CD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.58 Drafting Technician KJ 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.06 Administrative Assistant JJ 7.00 3.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 281.38 23.38 76.00 182.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $10,520.38 $1,210.31 $3,820.82 $5,489.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $13,655.45 $1,570.98 $4,959.42 $7,125.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,976.71 $457.50 $1,444.27 $2,074.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $28,152.54 $3,238.79 $10,224.51 $14,689.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,200.00 $0.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,200.00 $0.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Final LOE
Task #: BIL002E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Former Polk County Fertilizer Site SubTask 7
Activity/Phase: Design SubTask 3 Soil Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TTotal Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,900.00 $0.00 $4,900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $313.00 $0.00 $313.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $5,213.00 $0.00 $5,213.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,750.00 $0.00 $1,750.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,990.00 $0.00 $1,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $36,555.54 $3,238.79 $10,224.51 $23,092.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,815.25 $323.88 $1,022.45 $1,468.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $39,370.79 $3,562.67 $11,246.96 $24,561.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: $10,911.55 Manual Entry Cost from Delta CEF; $28,459.23 Manual Entry
Cost (Prior + Delta): $39,370.78 Auto-Calculated Rounding Error: $0.01 Auto-Calculated
Final Total Cost: $39,370.79 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Former Polk County Fertilizer Site SUBTASK 2: Design
DATE: 3/3/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer GK Statistical Analysis of existing data 6 Sr Professional Engineer GK Establish Cleanup Levels through Iterative Scenarios 6
Project Manager JM Soil and Groundwater Assessment Summary (ISRP) 12 Project Manager JM Remedial Alternative Evaluation 4 Project Manager JM Excavation Layout 4 Project Manager JM Volume calculations 4 Project Manager JM Access Considerations 4 Project Manager JM Dust Control 4 Project Manager JM Dust Monitoring 3 Project Manager JM Health and Safety Provisions 3 Project Manager JM Soil Characterization/Profiling 2 Project Manager JM Mointoring and Reporting 3 Project Manager JM Cost Estimate 4 Project Manager JM RAP Checklist 2 Project Manager JM Schedule 2
Drafting Technician KJ Assessment figures 6 Drafting Technician KJ Prepare Excavation Layouts 4
Staff Assistants JJ Document Preparation/Publishing/build pdf 3
TOTAL LABOR 76
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
FINAL --7/24/96
SITE : Former Polk County Fertilizer SUBTASK 3: Soil Sampling
DATE: 3/3/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Contact Property Owner 4 Project Manager JM Field Work Preparation 4 Project Manager JM Evaluate Data and Determine need for additional analysis of contingency samples 8 Project Manager JM Data Summary 8
Sr Technician WM Mob/demob (6 days) 12 Sr Technician WM Locate/measure soil borings 4 Sr Technician WM Soil Borings (61 total - 1 hr per boring) 61
Sr Technician SA Mob/demob (6 days) 12 Sr Technician SA Locate/measure soil borings 4 Sr Technician SA Soil Borings (61 total - 1 hr per boring) 61
Staff Assistants JJ Data Entry and Summary Tables 4
TOTAL LABOR 182
VEHICLE TYPE RATE UNIT USEAGE
WM Company Truck $480.00 week 1 $480.00 WM Company Truck $120.00 day 1 $120.00 SA Company Truck $480.00 week 1 $480.00 SA Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $1,200.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs Soil EPA 8081 $105.00 32 $3,360.00 PAHs Soil EPA 8270 SIM $110.00 14 $1,540.00 Sample Shipping - soil overnight - large cooler $150.00 2 $300.00 Ice $6.50 2 $13.00
TOTAL LAB $5,213.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 6 $240.00
Soil Assessment Kit $700.00 week 1 $700.00 Soil Assessment Kit $175.00 day 1 $175.00
GPS (Trimble) $700.00 week 1 $700.00 GPS (Trimble) $175.00 day 1 $175.00
TOTAL EQUIPMENT $1,990.00
Task #: BIL02E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Design SubTask 7
Activity/Phase: Design SubTask 3 Soil Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.76 PProject Manager JM 15.14 15.14 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$66.59 Sr Professional Engineer GK 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $51.76 Project Manager/ Enginee JM 32.00 8.00 24.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.65 Staff Engineer/Scientist JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.80 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.69 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25.00 Senior Technician SA 77.00 0.00 77.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.01 Senior Technician WM 77.00 0.00 77.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.87 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.02 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.65 Junior Technician CD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.58 Drafting Technician KJ 4.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.06 Administrative Assistant JJ 4.00 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 209.14 15.14 12.00 182.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $6,813.50 $783.85 $540.40 $5,489.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $8,843.93 $1,017.44 $701.44 $7,125.05 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $2,575.51 $296.30 $204.27 $2,074.94 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $18,232.94 $2,097.59 $1,446.11 $14,689.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $1,200.00 $0.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,200.00 $0.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Delta LOE
Task #: BIL02E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Design SubTask 7
Activity/Phase: Design SubTask 3 Soil Sampling SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TTotal Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $4,900.00 $0.00 $4,900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $313.00 $0.00 $313.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $5,213.00 $0.00 $5,213.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $240.00 $0.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $875.00 $0.00 $875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $875.00 $0.00 $875.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,990.00 $0.00 $1,990.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $26,635.94 $2,097.59 $1,446.11 $23,092.24 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,823.29 $209.76 $144.61 $1,468.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $28,459.23 $2,307.35 $1,590.72 $24,561.16 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $28,459.23 Auto-Calculated
Final Total Cost: $28,459.23 Auto-Calculated
SUBTASK 2: Design
DATE: 3/3/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer GK Statistical Analysis of existing data 0 Sr Professional Engineer GK Establish Cleanup Levels through Iterative Scenarios 0
Project Manager JM Soil and Groundwater Assessment Summary (ISRP) 8 Project Manager JM Remedial Alternative Evaluation 0 Project Manager JM Excavation Layout 0 Project Manager JM Volume calculations 0 Project Manager JM Access Considerations 0 Project Manager JM Dust Control 0 Project Manager JM Dust Monitoring 0 Project Manager JM Health and Safety Provisions 0 Project Manager JM Soil Characterization/Profiling 0 Project Manager JM Mointoring and Reporting 0 Project Manager JM Cost Estimate 0 Project Manager JM RAP Checklist 0 Project Manager JM Schedule 0
Drafting Technician KJ Assessment figures 4 Drafting Technician KJ Prepare Excavation Layouts 0
Staff Assistants JJ Document Preparation/Publishing/build pdf 0
TOTAL LABOR 12
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
SITE : Former Polk County Fertilizer SUBTASK 3: Soil Sampling
DATE: 3/3/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Contact Property Owner 4 Project Manager JM Field Work Preparation 4 Project Manager JM Evaluate Data and Determine need for additional analysis of contingency samples 8 Project Manager JM Data Summary 8
Sr Technician WM Mob/demob (6 days) 12 Sr Technician WM Locate/measure soil borings 4 Sr Technician WM Soil Borings (61 total - 1 hr per boring) 61
Sr Technician SA Mob/demob (6 days) 12 Sr Technician SA Locate/measure soil borings 4 Sr Technician SA Soil Borings (61 total - 1 hr per boring) 61
Staff Assistants JJ Data Entry and Summary Tables 4
TOTAL LABOR 182
VEHICLE TYPE RATE UNIT USEAGE
WM Company Truck $480.00 week 1 $480.00 WM Company Truck $120.00 day 1 $120.00 SA Company Truck $480.00 week 1 $480.00 SA Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $1,200.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
OCPs Soil EPA 8081 $105.00 32 $3,360.00 PAHs Soil EPA 8270 SIM $110.00 14 $1,540.00 Sample Shipping - soil overnight - large cooler $150.00 2 $300.00 Ice $6.50 2 $13.00
TOTAL LAB $5,213.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 6 $240.00
Soil Assessment Kit $700.00 week 1 $700.00 Soil Assessment Kit $175.00 day 1 $175.00
GPS (Trimble) $700.00 week 1 $700.00 GPS (Trimble) $175.00 day 1 $175.00
TOTAL EQUIPMENT $1,990.00
Task #: BIL02E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Former Polk County Fertilizer Site SubTask 7
Activity/Phase: Design SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$51.76 PProject Manager JM 8.24 8.24 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$66.59 Sr Professional Engineer GK 12.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $51.76 Project Manager/ Enginee JM 43.00 43.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $33.65 Staff Engineer/Scientist JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $36.80 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $46.69 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $25.00 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.01 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.87 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.02 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.65 Junior Technician CD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.58 Drafting Technician KJ 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.06 Administrative Assistant JJ 3.00 3.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 72.24 8.24 64.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $3,706.87 $426.45 $3,280.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $4,811.52 $553.53 $4,257.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,401.20 $161.20 $1,240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $9,919.59 $1,141.18 $8,778.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Original TA LOE
Task #: BIL02E SubTask 1 Project Management SubTask 6
Site: Former Polk County Ferti SubTask 2 Former Polk County Fertilizer Site SubTask 7
Activity/Phase: Design SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
TTotals 1 2 3 4 5 6 7 8 9 10 Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TTotal Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $9,919.59 $1,141.18 $8,778.41 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $991.96 $114.12 $877.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $10,911.55 $1,255.30 $9,656.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $10,911.55 Auto-Calculated
Final Total Cost: $10,911.55 Auto-Calculated
SUBTASK 2: Design
DATE: 3/3/2025
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer GK Statistical Analysis of existing data 6 Sr Professional Engineer GK Establish Cleanup Levels through Iterative Scenarios 6
Project Manager JM Soil and Groundwater Assessment Summary (ISRP) 4 Project Manager JM Remedial Alternative Evaluation 4 Project Manager JM Excavation Layout 4 Project Manager JM Volume calculations 4 Project Manager JM Access Considerations 4 Project Manager JM Dust Control 4 Project Manager JM Dust Monitoring 3 Project Manager JM Health and Safety Provisions 3 Project Manager JM Soil Characterization/Profiling 2 Project Manager JM Mointoring and Reporting 3 Project Manager JM Cost Estimate 4 Project Manager JM RAP Checklist 2 Project Manager JM Schedule 2
Drafting Technician KJ Assessment figures 2 Drafting Technician KJ Prepare Excavation Layouts 4
Staff Assistants JJ Document Preparation/Publishing/build pdf 3
TOTAL LABOR 64
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
From: Brian Moore To: Johnson, Megan R Cc: Sweeney, Scott L Subject: RE: Polk County Fertilizer Site Date: Wednesday, February 26, 2025 10:53:11 AM Attachments: image001.png image002.png image003.png image004.png image005.png image006.png TA_002E CO#1.doc TA_002E Delta CO1.xlsx Schedule - TA_002E CO#1.pdf Sampling Plan BIL002E.pdf TA_002E Final CO1.xlsx TA_002E.xlsx
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Megan, A proposed TACO is attached for additional sampling. I will communicate with Michael regarding off-site access and if effort is needed we can create a WCD.
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, February 24, 2025 12:29 PM To: Brian Moore <Brian.Moore@ghd.com> Cc: Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov> Subject: RE: Polk County Fertilizer Site
Hey Brian, Our grant funds will cover the cost of delineating the contamination, and any excavation, including offsite. We would need to get signed site access from property owners if we went offsite, but perhaps Michael Sznapstajler can help with that. Was there another reason why we would stop at the property boundary?
Thanks, Megan
From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, February 24, 2025 9:39 AM To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Cc: Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov> Subject: RE: Polk County Fertilizer Site
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Thanks Megan, I will prepare a TACO
1 other comment, we will pushing up against the property line to the west and north of the site, our plan is to excavate to the property line and not sample offsite. If you have a different perspective/preference, please advise
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Monday, February 24, 2025 9:36 AM To: Brian Moore <Brian.Moore@ghd.com> Cc: Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov> Subject: RE: Polk County Fertilizer Site
Hey Brian, I figured that might happen, that sounds good. I am assuming the need for additional soil data will push out the deliverable due date for the ISR Plan. If so, let’s do a TACO to add the soil sampling as a new subtask, and we can bump out the due dates. Really appreciate your continued work on this site.
Thanks!
Megan
From: Brian Moore <Brian.Moore@ghd.com> Sent: Monday, February 24, 2025 9:29 AM To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Subject: RE: Polk County Fertilizer Site
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Megan, Based on our initial mapping of the direct exposure exceedances, additional soil sampling is needed. I am generating a scope, should I do a TACO to the ISRP, or just generate a separate TA for the additional soil sampling?
Thank you in advance
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
From: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Sent: Wednesday, February 5, 2025 12:19 PM To: Brian Moore <Brian.Moore@ghd.com> Cc: Sweeney, Scott L <Scott.L.Sweeney@FloridaDEP.gov>; Cross, Justin L.
<Justin.L.Cross@FloridaDEP.gov> Subject: RE: Polk County Fertilizer Site
Hey Brian, Attached is the Department signed Task Assignment, BIL02E, for the ISR Plan at Polk County Fertilizer. It is ready for your review and signature. Please copy us on the final executed agreement. Let us know if you have any questions.
Thanks!
Megan
Megan R. Johnson Environmental Consultant Brownfields and CERCLA Site Screening Section Florida Department of Environmental Protection 2600 Blair Stone Road, MS 4535
Tallahassee, FL 32399
Megan.R.Johnson@floridadep.gov Office: 850-245-8994
From: Brian Moore <Brian.Moore@ghd.com> Sent: Friday, January 31, 2025 11:45 AM To: Johnson, Megan R <Megan.R.Johnson@FloridaDEP.gov> Subject: Polk County Fertilizer Site
EXTERNAL MESSAGE
This email originated outside of DEP. Please use caution when opening attachments, clicking links, or responding to this email.
Megan, Our proposal for preparation of an interim source removal plan is attached for your review.
Thank you
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
COST PROPOSAL FOR TASK BIL02E Change Order #1 <Former Polk County Fertilizer Site/FDEP ERIC_13343>
< Interim Source Removal Plan >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD Services Inc. (GHD) is pleased to submit this proposal to prepare an Interim Source Removal Plan for the referenced site located in Haines City, Polk County. Our proposed scope of work is included below.
Task BIL02D was recently implemented and provided additional soil data for the delineation of polycyclic aromatic hydrocarbon (PAH) and dieldrin impacts. Based on discussions with the Department, preparation of an Interim Source Removal Plan (ISRP) was recommended. Task BIL02E includes costs associated with ISRP preparation.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the preparation of an ISRP for the Polk County Fertilizer site.
Subtask 2: ISR Plan The results of the initial testing revealed PAH and dieldrin detections in shallow soil beneath the site. Based on discussions with the Department, it was recommended that an ISR Plan be prepared and data evaluated in order to determine a cost-effective approach to mitigating exposure risks and future potential for leaching to groundwater.
The ISR Plan will include an evaluation of the existing data including a statistical evaluation in order to establish cleanup goals for dieldrin. Once established, the ISRP will be prepared that will include a site summary, summary of soil assessment, and a proposed approach for excavating shallow soils for off-site disposal. The ISRP will also include sequencing, estimated volumes, and required monitoring. The document will also include a cost estimate and monitoring schedule. The ISRP will also include a completed RAP Checklist for applicable portions of the ISRP.
Subtask 3: Soil Sampling Under subtask 2, GHD began developing excavation plans to be included in the ISR Plan.
During review, it was determined that additional delineation soil sampling was necessary to determine excavation boundaries for direct exposure exceedances for dieldrin and PAHs.
Subtask 3 includes additional soil sampling. GHD proposes to advance 61 additional soil borings and collect soil samples at multiple depth intervals. Soil samples will be advanced with a stainless-steel hand auger to depths up to 6 ft bls. Soil samples will be gathered from 0.5, 2, 4, and/or 6 ft bls for confirmation laboratory analysis. Soil samples will be analyzed for the presence of dieldrin or PAHs. Several soil samples will also be collected and the laboratory will be instructed to hold the samples pending the results of the initial analysis.
Upon receipt of analytical data, the sampling methods and results will be discussed within the ISR Plan prepared as part of subtask 2 above.
Deliverables:
Deliverable Deliverable Due Date
Interim Source Removal Plan 5/23/25
Soil Sampling Notes and Analytical Data 5/5/25
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 1/31/25 Thu 2/13/25
2 Subtask 1: Project Management
25 days Fri 2/14/25 Thu 3/20/25
3 Subtask 2: Interim Source Removal Plan
71 days Fri 2/14/25 Fri 5/23/25
4 Assessment Summary 1 wk Fri 2/14/25 Thu 2/20/25
5 Statistical Evaluation 2 wks Fri 2/14/25 Thu 2/27/25
6 Cleanup Goals 1 wk Fri 2/21/25 Thu 2/27/25
7 Volume Calculations 1 wk Mon 5/5/25 Fri 5/9/25
8 Monitoring/Reporting 3 days Mon 5/12/25 Wed 5/14/25
9 Cost Estimate 1 wk Mon 5/12/25 Fri 5/16/25
10 Schedule 1 wk Mon 5/12/25 Fri 5/16/25
11 RAP Checklist 3 days Mon 5/19/25 Wed 5/21/25
12 Finalize ISRP 2 days Thu 5/22/25 Fri 5/23/25
13 Subtask 3: Soil Sampling 46 days Mon 3/3/25 Mon 5/5/25
14 Field Work Preparation 3 wks Mon 3/3/25 Fri 3/21/25
15 Soil Sampling 6 days Mon 3/24/25 Mon 3/31/25
16 Data Summary 3 wks Tue 4/15/25 Mon 5/5/25
Jenna Martin
Guy Kaminski
Guy Kaminski
T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M 25 Feb 3, '25 Feb 10, '25 Feb 17, '25 Feb 24, '25 Mar 3, '25
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task BIL002E at the former Polk County Fertilizer site located in Haines City, Polk County
Project: TA_002E CO#1 Date: Wed 2/26/25
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 1/31/25 Thu 2/13/25
2 Subtask 1: Project Management
25 days Fri 2/14/25 Thu 3/20/25
3 Subtask 2: Interim Source Removal Plan
71 days Fri 2/14/25 Fri 5/23/25
4 Assessment Summary 1 wk Fri 2/14/25 Thu 2/20/25
5 Statistical Evaluation 2 wks Fri 2/14/25 Thu 2/27/25
6 Cleanup Goals 1 wk Fri 2/21/25 Thu 2/27/25
7 Volume Calculations 1 wk Mon 5/5/25 Fri 5/9/25
8 Monitoring/Reporting 3 days Mon 5/12/25 Wed 5/14/25
9 Cost Estimate 1 wk Mon 5/12/25 Fri 5/16/25
10 Schedule 1 wk Mon 5/12/25 Fri 5/16/25
11 RAP Checklist 3 days Mon 5/19/25 Wed 5/21/25
12 Finalize ISRP 2 days Thu 5/22/25 Fri 5/23/25
13 Subtask 3: Soil Sampling 46 days Mon 3/3/25 Mon 5/5/25
14 Field Work Preparation 3 wks Mon 3/3/25 Fri 3/21/25
15 Soil Sampling 6 days Mon 3/24/25 Mon 3/31/25
16 Data Summary 3 wks Tue 4/15/25 Mon 5/5/25
Jenna Martin
William McKinney,Skylar Albritton
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T Mar 10, '25 Mar 17, '25 Mar 24, '25 Mar 31, '25 Apr 7, '25 Apr 14, '25
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task BIL002E at the former Polk County Fertilizer site located in Haines City, Polk County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Fri 1/31/25 Thu 2/13/25
2 Subtask 1: Project Management
25 days Fri 2/14/25 Thu 3/20/25
3 Subtask 2: Interim Source Removal Plan
71 days Fri 2/14/25 Fri 5/23/25
4 Assessment Summary 1 wk Fri 2/14/25 Thu 2/20/25
5 Statistical Evaluation 2 wks Fri 2/14/25 Thu 2/27/25
6 Cleanup Goals 1 wk Fri 2/21/25 Thu 2/27/25
7 Volume Calculations 1 wk Mon 5/5/25 Fri 5/9/25
8 Monitoring/Reporting 3 days Mon 5/12/25 Wed 5/14/25
9 Cost Estimate 1 wk Mon 5/12/25 Fri 5/16/25
10 Schedule 1 wk Mon 5/12/25 Fri 5/16/25
11 RAP Checklist 3 days Mon 5/19/25 Wed 5/21/25
12 Finalize ISRP 2 days Thu 5/22/25 Fri 5/23/25
13 Subtask 3: Soil Sampling 46 days Mon 3/3/25 Mon 5/5/25
14 Field Work Preparation 3 wks Mon 3/3/25 Fri 3/21/25
15 Soil Sampling 6 days Mon 3/24/25 Mon 3/31/25
16 Data Summary 3 wks Tue 4/15/25 Mon 5/5/25
Jenna Martin,Kyle Jameson
Jenna Martin
Jenna Martin
Jenna Martin
Jenna Ma
Jenna
Jenna Martin,Kyle Jameson,Jennifer Jarnigan
F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M Apr 21, '25 Apr 28, '25 May 5, '25 May 12, '25 May 19, '25 Ma
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task BIL002E at the former Polk County Fertilizer site located in Haines City, Polk County
34 33
40 39
38 37
43 42 41
464544
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
Fixed Price:
Fixed Unit Rate: (Extended Price)
Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
Additional signatures attached on separate page.
HW684
BIL02E Completion May 2, 2025
GHD Services, Inc. will prepare an Interim Source Removal Plan in accordance with the Cost Proposal and Level of Effort (LOE) submitted on January 31, 2025.
Megan Johnson 850.245.8994 Contractor GHD Services, Inc. Contractor
Contractor Brian Moore Contractor 813.971.3882
ERIC_13341
0 Citrus Ave, Haines City
Former Polk County Fertilizer
Contractor Contractor
✔ $ 10,911.55
$ 10,911.55
Scope of Work
GHD Services, Inc.
Contractor Brian Moore
Vice President
Brian Moore Digitally signed by Brian Moore Date: 2025.02.05 13:25:14 -05'00'
Jennifer Farrell
Digitally signed by Jennifer Farrell Date: 2025.02.05 12:05:56 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WC TAFORM
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Interim Source Removal Plan 03/20/2025
DEP approval of Project Management and Interim Source Removal Plan (Subtasks 1 and 2) $ 10,911.55
$ 10,911.55
HW684
BIL02E