Document Summary

This Task Assignment (TA CSS02A) is entered into between the State of Florida Department of Environmental Protection (DEP) and GHD Services, Inc. under the parent Contract HW684. The task assignment addresses environmental site investigation activities at the Agricultural Insecticide facility located at 48 SE Avenue B, Belle Glade, Palm Beach County, Florida. The project is identified as ERIC_14964 and is funded through federal CERCLA Site Screening Program (CSS) cooperative agreement funds administered by DEP on behalf of the Environmental Protection Agency.

GHD Services, Inc. shall conduct a CERCLA Site Screening event and generate a Site Investigation Report in accordance with a cost proposal and Level of Effort submitted on February 3, 2023. The contract is structured on a fixed unit rate basis with a total task assignment value of $25,774.46. Work is divided into four subtasks: Subtask 1 (Project Management) at $2,783.74; Subtask 2 (Preparation of Site-Specific Quality Assurance Project Plan) at $3,363.35; Subtask 3 (Field Work—Soil and Sediment Sampling) at $12,094.34; and Subtask 4 (Report and Data Summary Tables/Figures—Draft and Final) at $7,533.03. Deliverables include a site-specific QAPP due March 13, 2023; field notes, subcontractor receipts, and waste manifests due May 18, 2023; and the Site Investigation Report due June 9, 2023. The task assignment was effective February 8, 2023, and was completed August 9, 2023.

View the file

Other files

File Type Posted
CN-370000-HW684-BIL02F.pdf PDF
CN-370000-HW684-BIL2CC03.pdf PDF
CN-370000-HW684-BIL2ECO1.pdf PDF
CN-370000-HW684-BIL2FCO1.pdf PDF
CN-370000-HW684-BIL2GCO1.pdf PDF
CN-370000-HW684-CSS03B.pdf PDF
CN-370000-HW684-D033CCO1.pdf PDF
CN-370000-HW684-DC001A.pdf PDF
CN-370000-HW684-DC001F.pdf PDF
CN-370000-HW684-DC002B.pdf PDF
CN-370000-HW684-DC002C.pdf PDF
CN-370000-HW684-DC002D.pdf PDF
CN-370000-HW684-DC003D.pdf PDF
CN-370000-HW684-DC004D.pdf PDF
CN-370000-HW684-DC005A.pdf PDF
CN-370000-HW684-DC005D.pdf PDF
CN-370000-HW684-DC006B.pdf PDF
CN-370000-HW684-DC009C.pdf PDF
CN-370000-HW684-DC009D.pdf PDF
CN-370000-HW684-DC009E.pdf PDF
CN-370000-HW684-DC011A.pdf PDF
CN-370000-HW684-DC011C.pdf PDF
CN-370000-HW684-DC012D.pdf PDF
CN-370000-HW684-DC013B.pdf PDF
CN-370000-HW684-DC014D.pdf PDF
CN-370000-HW684-DC014F.pdf PDF
CN-370000-HW684-DC015A.pdf PDF
CN-370000-HW684-DC015C.pdf PDF
CN-370000-HW684-DC016B.pdf PDF
CN-370000-HW684-DC016C.pdf PDF
CN-370000-HW684-DC017C.pdf PDF
CN-370000-HW684-DC018C.pdf PDF
CN-370000-HW684-DC019C.pdf PDF
CN-370000-HW684-DC019D.pdf PDF
CN-370000-HW684-DC01ACO2.pdf PDF
CN-370000-HW684-DC020B.pdf PDF
CN-370000-HW684-DC025A.pdf PDF
CN-370000-HW684-DC026B.pdf PDF
CN-370000-HW684-DC026D.pdf PDF
CN-370000-HW684-DC027C.pdf PDF
CN-370000-HW684-DC028C.pdf PDF
CN-370000-HW684-DC029C.pdf PDF
CN-370000-HW684-DC031A.pdf PDF
CN-370000-HW684-DC034B.pdf PDF
CN-370000-HW684-DC03ACO1.pdf PDF
CN-370000-HW684-DC03CCO1.pdf PDF
CN-370000-HW684-DC03CCO2.pdf PDF
CN-370000-HW684-DC040A.pdf PDF
CN-370000-HW684-DC045B.pdf PDF
CN-370000-HW684-DC046B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

CSS02A Completion August 9, 2023

GHD Services, Inc. will conduct a CERCLA Site Screening event and generate a Site Inspection Report in accordance with the cost proposal and Level of Effort (LOE) submitted on February 3, 2023.

Allison Hankins 850 245 8990 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore 813 971 3882

ERIC_14964

48 SE Avenue B, Belle Glade

Agricultural Insecticide

✔ $ 25,774.46

$ 25,774.46

Scope of Work

Brian Moore

Vice President

Brian Moore Digitally signed by Brian Moore Date: 2023.02.08 17:25:17 -05'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.02.08 08:31:33 -05'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Site-specific QAPP 03/13/2023

Field notes, subcontractor receipts, waste manifest 05/18/2023

Site Investigation Report/Project Management 06/09/2023

Upon completion of QAPP preparation and DEP approval of Site-specific QAPP (Subtask 2) $ 3,363.35

Upon completion of field work and DEP approval of field notes, subcontractor receipts, waste manifest (Subtask 3) $ 12,094.34

Upon completion of site screening event and submittal and DEP approval of Site Investigation Report/Project Management (Subtasks 1 & 4) $ 10,316.77

$ 25,774.46

HW684

CSS02A

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: GHD Services Inc. HW684 Contract File

FROM: Allison Hankins, Contract Manager

DATE: February 6, 2023

SUBJECT: Negotiation Summary – CER21, TA CSS-02A

Site Investigation (SI) Activities Agricultural Insecticide

ERIC_14964

This Task Assignment (TA) is for conducting a Site Investigation, including site Field Work, at Agricultural Insecticide. The services are being conducted using federal funds from the CERCLA Site Screening Program (CSS) cooperative agreement that is administered by DEP on behalf of

EPA.

Subtask 1: Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general, administrative, and fringe costs. The agreed upon cost of this subtask is $2,783.74.

Subtask 2: Preparation of a Site-Specific Quality Assurance Project Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP). The SI QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the proposed sample locations. The agreed upon cost of this subtask is $3,363.35.

Subtask 3: Field Work – Soil and Sediment Sampling This subtask includes labor hours, travel, equipment costs, and subcontractor costs associated with the soil and sediment sampling. Deliverables of this subtask include field notes, subcontractor receipts, and waste manifests from SI activities. The agreed upon cost of this subtask is $12,094.34.

Subtask 4: Report and Data Summary Tables/Figures – Draft and Final This subtask includes labor hours associated with the preparation of Data Summary Tables/Figures and the Site Investigation Report. The deliverable will document field and laboratory findings to include soil and sediment sampling forms, and soil and sediment analytical results (tabulated and figures).

Deliverables of this subtask will include both the Data Summary Tables/Figures and the Site Investigation Report. The agreed upon cost of this subtask is $7,533.03.

Summary http://www.floridadep.gov/

Negotiation Summary – Task Assignment (TA) CSS-02 Agricultural Insecticide, ERIC_14964, Belle Glade, Palm Beach County Site Investigation with Soil and Sediment Sampling February 6, 2023 www.FloridaDEP.gov

DEP’s CSS Project Manager and GHD’s Project Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $25,744.46. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by GHD on February 3, 2023, as well as the Task Assignment Form for CSS-02A prepared by DEP. The final deliverable must be received by DEP no later than June 9, 2023.

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 02/06/23

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 21.10 21.1 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$51.08 Sr Professional Enginee JH 34.00 1.00 0.00 33.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$40.72 Professional Engineer/S ES 10.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scienti TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 39.00 22.00 13.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist ED 38.00 0.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $35.10 Staff Engineer/Scientist CH 48.00 0.00 48.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 6.00 0.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.35 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 7.00 2.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 11.00 2.00 5.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0

Total Hours 214.10 21.10 27.00 109.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $8,220.19 $945.69 $1,142.60 $3,572.78 $2,559.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $10,669.81 $1,227.51 $1,483.09 $4,637.47 $3,321.74 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $3,107.23 $357.47 $431.90 $1,350.51 $967.35 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $21,997.23 $2,530.67 $3,057.59 $9,560.76 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $0.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 4

FDEP COST ESTI MATEContractor: GHD Services Inc.

Date: 02/06/23

Task #: CS002 SubTask 1 Project Management SubTask 6

Site: Agricultural Insecticide C SubTask 2 QAPP SubTask 7

Activity/Phase: Site Screening SubTask 3 Soil and Sediment Sampling SubTask 8

Project Manager: Brian Moore, PE SubTask 4 SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $0.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $0.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $160.00 $0.00 $160.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $530.00 $0.00 $530.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $280.00 $0.00 $280.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $970.00 $0.00 $970.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $23,574.73 $2,530.67 $3,057.59 $11,138.26 $6,848.21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $2,199.73 $253.07 $305.76 $956.08 $684.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $25,774.46 $2,783.74 $3,363.35 $12,094.34 $7,533.03 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 5

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Agricultural Insecticide Company

SUBTASK 2: QAPP

DATE: 02/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Finalize QAPP 1

Project Manager JM Prepare QAPP 4 Project Manager JM Overview and Study objectives 4 Project Manager JM Sampling Locations and Rationale 2 Project Manager JM Data Generation and quality/handling 4 Project Manager JM Field Work 4 Project Manager JM Data Validation 4

Drafting Technician PM Prepare figures for QAPP 2

Administrative Assistant DA Finalize QAPP 2

TOTAL LABOR 27

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

FINAL --7/24/96

SUBTASK 3: Soil and Sediment Sampling

DATE: 02/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Site Access 1 Project Manager JM Prepare HASP 3 Project Manager JM Prepare field scope of work 2 Project Manager JM Characterize IDW 1 Project Manager JM Laboratory Data Validation 2 Project Manager JM Prepare Data Summary Package 4

Staff Engineer/Scientist ED Mob/demob (4 days from Wellington) 6 Staff Engineer/Scientist ED Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist ED Sediment Sampling (7 locations) 16

Staff Engineer/Scientist CH Mob/demob (4 days from Ft Myers) 16 Staff Engineer/Scientist CH Soil Boring Advancement and sampling (7 locations) 16 Staff Engineer/Scientist CH Sediment Sampling (7 locations) 16

Drafting Technician PM Site Plan with sample Locations 1 Drafting Technician PM Prepare soil data figure 2 Drafting Technician PM Prepare sediment data figure 2

Administrative Assistant DA Data entry and prepare summary tables (soil and sediment) 5

TOTAL LABOR 109

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 4 $480.00

TOTAL VEHICLE $480.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110 drum 1 $110.00

TOTAL $110.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

Ice $6.50 1 $6.50

TOTAL LAB $6.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 4 $160.00

Equipment (Analytical Related) sediment dredge $30.00 day 2 $60.00 Soil sampling kit (through concrete) $235.00 day 2 $470.00

Equipment (Other)

Jon Boat $90.00 day 2 $180.00 Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $970.00

SUBTASK 4: Site Investigation Report

DATE: 02/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Prepare Site Investigation Report 4

Sr Professional Geologist ES Hydrogeologic Setting 6 Sr Professional Geologist ES Sampling Locations and Rationale 4

Data Analyst JL Laboratory Data Validation 6

Sr. Professional Engineer JH Site Background 4 Sr. Professional Engineer JH Objectives 3 Sr. Professional Engineer JH Site Setting 6 Sr. Professional Engineer JH Soil Sampling Methodology 4 Sr. Professional Engineer JH Sediment Sampling Methodology 4 Sr. Professional Engineer JH Soil Analytical Results 4 Sr. Professional Engineer JH Sediment Analtycal Results 4 Sr. Professional Engineer JH Conclusion/Findings 4

Administrative Assistant DA Finalize Site Investigation Report 4

TOTAL LABOR 57

VEHICLE TYPE RATE UNIT USEAGE

$0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

$0.00 $0.00

Equipment (Analytical Related)

$0.00 $0.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $0.00

COST PROPOSAL FOR TASK CS002

<Agricultural Insecticide Company Site/FDEP ERIC_14964>

< Site Screening >

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) is pleased to submit this proposal for sampling activities at the referenced site located in Belle Glade, Palm Beach County. We understand that subsurface testing was recommended to evaluate any potential threat of contamination. A detail of our proposed scope of work is included below.

Subtask 1: Project Management Subtask 1 includes all tasks associated with project management of the site screening activities for the former Agricultural Insecticide Company Site.

Subtask 2: Site-Specific Quality Assurance Project Plan The initial step in the site screening process will be the development of a site-specific quality assurance project plan (QAPP). The QAPP will include details regarding the site background, objectives of the site screening, a sampling plan detailing locations and rationale for testing, laboratory analytical methods, field methods to be utilized, and the approach to data validation and use. The QAPP will be submitted to the Department for review prior to initiating field activities.

Subtask 3: Site Screening In accordance with our teleconference and the agreed upon scope of work, GHD will advance a series of borings to determine lithology, collect soil samples, and collect representative sediment samples. At this time, a total of seven (7) soil borings are proposed. The borings will be advanced with a hand auger. At each location, soil samples will be gathered from depths of land surface to 2 feet below land surface (bls) and 2-4 feet bls for confirmation laboratory analysis. The samples will be submitted to the FDEP analytical laboratory in Tallahassee for analysis. The samples will be analyzed for the presence of chlordane and toxaphene (EPA Method 8276), methoxychlor, endrin, endosulfan, dieldrin, DDT, phorate, ethoprop, methyl ethyl parathion, malathion, and azodrin (monocrotophos) by EPA Method 8270, and methomyl and 2,4-D by EPA Method 8321.

In addition to soil sampling, GHD will also gather representative sediment samples from seven

(7) identified locations along County Road 880 and Brown’s Farm Road in Belle Glade, Palm Beach County. Sediment samples will be gathered from the center of the canal at each identified location using a sediment sampling device (ponar dredge or similar). In general, the samples will include representative materials from the top 6-inches of the canal bottom. The samples will be analyzed for the presence of chlordane and toxaphene (EPA Method 8276), methoxychlor, endrin, endosulfan, dieldrin, DDT, phorate, ethoprop, methyl ethyl parathion, malathion, and azodrin (monocrotophos) by EPA Method 8270, and methomyl and 2,4-D by EPA Method 8321.

During GHD’s field activities, if anyone is observed to be fishing in the canals, they will be interviewed to determine if they eat any of the fish from the canal.

Following receipt of analytical data, GHD will prepare summary tables and figures presenting a summary of the field and laboratory analytical results. The summary tables and figures will be provided to the FDEP along with all field notes and laboratory analytical repots.

Subtask 4: Site Investigation Report Following the review of the data by FDEP, GHD will assist with the preparation of a Site Investigation Report, which will include a summary of methodology and analytical results.

Deliverables:

Deliverable Deliverable Due Date

Site-specific QAPP 3/13/23

Field notes, subcontractor receipts, waste manifest 5/18/23

Site Investigation Report 6/9/23

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Thu 2/2/23 Wed 2/15/23

2 Subtask 1: Project Management

81 days Thu 2/16/23 Thu 6/8/23

3 Subtask 2: QAPP 3.5 wks Thu 2/16/23 Mon 3/13/23

4 Subtask 3: Soil and Sediment Sampling

49 days Mon 3/13/23

Thu 5/18/23

5 Field Work Preparation3 wks Mon 3/13/23Fri 3/31/23

6 Soil Sampling 2 days Mon 4/3/23 Tue 4/4/23

7 Sediment Sampling 2 days Wed 4/5/23 Thu 4/6/23

8 Data Review and Summary Preparation

4 wks Fri 4/21/23 Thu 5/18/23

9 Subtask 4: Site Investigation Report

3 wks Fri 5/19/23 Thu 6/8/23

1/22 1/29 2/5 2/12 2/19 2/26 February March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Site Screening activities at the Insecticide Agriculture Company facility located in Belle Glade, Palm Beach County

Project: TA_002 Date: Thu 2/2/23

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Thu 2/2/23 Wed 2/15/23

2 Subtask 1: Project Management

81 days Thu 2/16/23 Thu 6/8/23

3 Subtask 2: QAPP 3.5 wks Thu 2/16/23 Mon 3/13/23

4 Subtask 3: Soil and Sediment Sampling

49 days Mon 3/13/23

Thu 5/18/23

5 Field Work Preparation3 wks Mon 3/13/23Fri 3/31/23

6 Soil Sampling 2 days Mon 4/3/23 Tue 4/4/23

7 Sediment Sampling 2 days Wed 4/5/23 Thu 4/6/23

8 Data Review and Summary Preparation

4 wks Fri 4/21/23 Thu 5/18/23

9 Subtask 4: Site Investigation Report

3 wks Fri 5/19/23 Thu 6/8/23

Jenna Martin,Peter McLean,Debra Andrews

Jenna Martin

Edgar Diaz,Conn

Edgar Diaz,Co

3/5 3/12 3/19 3/26 4/2 4/9 April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Site Screening activities at the Insecticide Agriculture Company facility located in Belle Glade, Palm Beach County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Thu 2/2/23 Wed 2/15/23

2 Subtask 1: Project Management

81 days Thu 2/16/23 Thu 6/8/23

3 Subtask 2: QAPP 3.5 wks Thu 2/16/23 Mon 3/13/23

4 Subtask 3: Soil and Sediment Sampling

49 days Mon 3/13/23

Thu 5/18/23

5 Field Work Preparation3 wks Mon 3/13/23Fri 3/31/23

6 Soil Sampling 2 days Mon 4/3/23 Tue 4/4/23

7 Sediment Sampling 2 days Wed 4/5/23 Thu 4/6/23

8 Data Review and Summary Preparation

4 wks Fri 4/21/23 Thu 5/18/23

9 Subtask 4: Site Investigation Report

3 wks Fri 5/19/23 Thu 6/8/23 nor Haydon onnor Haydon

Jenna Martin

4/16 4/23 4/30 5/7 5/14 5/21 May

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Site Screening activities at the Insecticide Agriculture Company facility located in Belle Glade, Palm Beach County

Task Name Duration Start Finish

1 LOE Submittal/Approval 2 wks Thu 2/2/23 Wed 2/15/23

2 Subtask 1: Project Management

81 days Thu 2/16/23 Thu 6/8/23

3 Subtask 2: QAPP 3.5 wks Thu 2/16/23 Mon 3/13/23

4 Subtask 3: Soil and Sediment Sampling

49 days Mon 3/13/23

Thu 5/18/23

5 Field Work Preparation3 wks Mon 3/13/23Fri 3/31/23

6 Soil Sampling 2 days Mon 4/3/23 Tue 4/4/23

7 Sediment Sampling 2 days Wed 4/5/23 Thu 4/6/23

8 Data Review and Summary Preparation

4 wks Fri 4/21/23 Thu 5/18/23

9 Subtask 4: Site Investigation Report

3 wks Fri 5/19/23 Thu 6/8/23 n,Peter McLean,Debra Andrews

Jeremy Hess,Jenna Martin,Jonathan Lang,Edwin

5/28 6/4 6/11 6/18 6/25 7/2 June July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Site Screening activities at the Insecticide Agriculture Company facility located in Belle Glade, Palm Beach County

Task Assignment Form - Agricultural Insecticide_BH
Negotiation Summary - AgInsect_BH
TA_002_Excel_7
Sub 2
Sub 3
Sub 4
Cost Estimate
Formula Sheet
TA_002_7
Bids - TA_002
Bids - TA_001A
Bids - TA_001A

Schedule - TA_002

File details come from the government source that posted it. Updated .