This Task Assignment (TA) is a contract document between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. for groundwater monitoring activities at McNatt's Cleaners (formerly Ehrlich Road Cleaners) located at 5227 Ehrlich Road, Tampa, Hillsborough County, Florida. The project is identified as ERIC_4752 under the parent contract number HW684. Nicole Knutson serves as the FDEP Project Manager, while Brian Moore represents GHD Services, Inc. as the contractor's project manager. The task assignment was signed on November 29, 2023 (FDEP) and December 1, 2023 (Contractor), with a task completion date of April 15, 2024.
The contract involves two subtasks: Subtask 1 covers project management for annual groundwater sampling and reporting, while Subtask 2 encompasses the actual groundwater monitoring activities. Services include depth-to-water measurements at 33 monitor wells and groundwater sampling at 15 specific wells with analysis for volatile organic compounds and additional parameters including total dissolved solids, total recoverable petroleum hydrocarbons, sodium, ammonia, nitrite, nitrate, chloride, and dissolved gases. The total task value is $11,969.46 on a fixed unit rate basis. This amount covers direct labor costs ($2,527.98), overhead at 129.80% ($3,281.32), fringe benefits at 37.80% ($955.57), travel ($240.00), subcontractor costs including IDW disposal through Erwin Remediation ($121.00), laboratory analytical services ($2,685.00), field equipment and expenses ($1,482.10), and a completion fee ($676.49). The primary deliverable is a Groundwater Monitoring Report due February 13, 2024, with invoice payment contingent upon FDEP approval of this report.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC020B Completion April 15, 2024
GHD will perform groundwater monitoring activities at McNatt's Cleaners.
Nicole Knutson 850-245-8763 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore 813 257 0658
ERIC_4752
5227 Ehrlich Rd, Tampa, Hillsborough County
McNatt's Cleaners (Former Ehrlich Road Cleaners)
✔ $ 11,969.46
$ 11,969.46
Scope of Work
Brian Moore Digitally signed by Brian Moore Date: 2023.12.01 08:42:10 -05'00' Kelly Crain Digitally signed by Kelly Crain
Date: 2023.11.29 12:02:27 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report & PM - Subtasks 1 & 2 02/13/2024
FDEP Approval of Groundwater Monitoring Report & PM - Subtasks 1 & 2 $ 11,969.46
$ 11,969.46
HW684
DC020B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_4752
McNatt’s Cleaners
FROM: Nicole Knutson, Project Manager
SUBJECT: Negotiation Summary
HW684 DC020B
DATE: November 27, 2023
GHD will perform groundwater monitoring activities at McNatt's Cleaners, as detailed in the November 15, 2023 proposal. Erwin Remediation will complete IDW transportation and disposal.
Total task amount is $11,969.46. GHD’s time, labor, and subcontractor costs for these activities have been reviewed and are appropriate. The level-of-effort and cost estimate are reasonable for the scope of services. Final deliverable due date is February 13, 2024. Task completion date is April 15, 2024.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 11/27/2023
Task #: DC020B SubTask 1 Project Management SubTask 6
Site: McNatts Ehrlich SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$49.53 Project Manager JM 5.87 5.87 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$56.19 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientis CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.53 Project Manager/ Enginee JM 20.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.78 Staff Engineer/Scientist JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.21 Senior Technician SA 18.00 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $26.63 Senior Technician WM 16.50 16.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 6.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.63 Administrative Assistant JJ 8.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 75.37 5.87 69.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,527.98 $290.83 $2,237.15 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $3,281.32 $377.50 $2,903.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $955.57 $109.93 $845.64 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $6,764.87 $778.26 $5,986.61 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 11/27/2023
Task #: DC020B SubTask 1 Project Management SubTask 6
Site: McNatts Ehrlich SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $240.00 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11.00 $11.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $121.00 $121.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,528.50 $2,528.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $156.50 $156.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,685.00 $2,685.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $1,342.10 $1,342.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,482.10 $1,482.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $11,292.97 $778.26 $10,514.71 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $676.49 $77.83 $598.66 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $11,969.46 $856.09 $11,113.37 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Cost from Prior CEF: Manual Entry Cost from Delta CEF; Manual Entry
Cost (Prior + Delta): $0.00 Auto-Calculated Rounding Error: $11,969.46 Auto-Calculated
Final Total Cost: $11,969.46 Auto-Calculated
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : McNatts Cleaners (Ehrlich) SUBTASK 2: Groundwater Monitoring
DATE: 11/27/2023
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 1
Project Manager JM Field Work Preparation 1 Project Manager JM Update HASP 1 Project Manager JM Owner Coordination 1 Project Manager JM Project Background 1 Project Manager JM Profile and coordinate IDW disposal 1 Project Manager JM Groundwater Sampling Methods 3 Project Manager JM Water Quality Parameter Summary 3 Project Manager JM Groundwater Analtycial Results (VOCs) 3 Project Manager JM Groundwater Analytical Results (UIC/performance) 3 Project Manager JM Laboratory Data Validation 2 Project Manager JM Conclusions/Recommendations 1
Senior Technician SA Mob/Demob (2 days) 2 Senior Technician SA Water levels (all wells - 33 total) 4 Senior Technician SA Groundwater Sampling (8 wells) 12
Senior Technician WM Mob/Demob (2 days) 2 Senior Technician WM Water levels (all wells - 33 total) 4 Senior Technician WM Groundwater Sampling (7 wells) 10.5
16.5
Drafting Technician PM Groundwater elevation figures (4 zones) 3 Drafting Technician PM Groundwater analytical figures (4 zones) 3
Staff Assistant JJ Data Entry (15 monitor wells, 33 wls) 2 Staff Assistant JJ Update summary tables 2 Staff Assistant JJ Document Preparation/Publishing 2 Staff Assistant JJ GIS/ADaPT 2
TOTAL LABOR 69.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 2 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Drum Dispos 1 drum $110.00 $110.00
TOTAL $110.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA Method 8260 $73.00 16 $1,168.00 MW001, 2, 4, 19, 25, 30, 31, 33, 40, 42, 43, 45, 51, 52, 53 & IDW
TOC EPA 9060 $30.00 1 $30.00 MW051
TDS EPA 160.1 $16.00 3 $48.00 MW040, 42, 51
TRPH FL-PRO $88.00 3 $264.00 MW040, 42, 51
sodium EPA 6010 $13.50 3 $40.50 MW040, 42, 51 ammonia SM4500 $24.00 3 $72.00 MW040, 42, 51 chloride EPA 352.2 $24.00 2 $48.00 MW051, 52 nitrate EPA 353.2 $23.00 3 $69.00 MW040, 42, 51 nitrite EPA 353.2 $23.00 3 $69.00 MW040, 42, 51 dissolved gases (methane, ethane, ethene) RSK175 $180.00 4 $720.00 MW051 and 52 and 2 QA/QC Sample Shipping Large Cooler (1 day) $150.00 1 $150.00
Ice $6.50 1 $6.50
TOTAL LAB $2,685.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables $40.00 day 1 $40.00
Groundwater Sampling Kit $290.00 day 4 $1,160.00 Poly Tubing (HDPE) $0.30 ft 457 $137.10 Silicon Tubing $3.00 ft 15 $45.00
55-gallon drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $1,482.10
FINAL --7/24/96
COST PROPOSAL FOR TASK DC020B
McNatt’s Cleaners, 299502136/ERIC_4752
Groundwater Monitoring
1. INTRODUCTION:
GHD prepared a RAP Modification that was implemented in 2017. Following remedial injections and a period of SVE system operations, the system was recently shutdown. In order to continue to evaluate the performance of the remedial injections in accordance with the RAP Modification, groundwater monitoring is recommended. Task DC020B includes annual groundwater sampling in accordance with GHD’s recommendations from the previous annual groundwater monitoring report dated September 2023 and FDEP correspondence dated November 15, 2022.
Subtask 1: Project Management Includes all tasks associated with project management for annual groundwater sampling and reporting.
Subtask 2: Groundwater Monitoring Subtask 2 includes annual groundwater monitoring. Prior to groundwater sampling, depth to water measurements will be gathered at all available monitor wells (33 total). Groundwater sampling will be conducted at fifteen (15) monitor wells including: MW001, MW002, MW004, MW019, MW025, MW030, MW031, MW033, MW040, MW042, MW043, MW045, MW051, MW052, and MW053. Groundwater sampling will be conducted in accordance with FDEP SOPs. All groundwater samples will be analyzed for the presence of Volatile Organic Halocarbons. Select wells (MW025, MW039, MW040, MW042, MW043, MW045, MW051, and MW052) will also be analyzed for the presence of total dissolved solids, total recoverable petroleum hydrocarbons, sodium, ammonia, nitrite, and nitrate. In addition, monitor wells MW051 and MW052 will also be analyzed for chloride and dissolved gases (methane, ethane, ethene). The dissolved gas sampling will be conducted at MW051 and MW052 only, and will include a duplicate and an equipment blank. Finally, the sample from monitor well MW051 will be analyzed for total organic carbon.
Following receipt of analytical data, a Groundwater Monitoring Report (GMR) will be prepared. The GMR will include a summary of groundwater sampling methods and analytical results. The GMR will provide recommendations for additional remediation and/or testing.
Deliverables:
Deliverable Deliverable Due Date
Groundwater Monitoring Report 2/13/24
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v1.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev1_12-12-22.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
| Utility Locate Bids_Compiled.pdf |
| Geosyntec Utility-272_Geotek_1500 |
| Geoview Utility Quote_2000_COT FTF SIS |
| Tallahassee Fire Training Division_V1_Bloodhound_3700 |
| Drilling Bids_Compiled.pdf |
| PDS_Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (sonic) |
| Direct Push |
| City of Tallahassee Fire Training Site_GW Protection PFAS Free Water Estimate Email |
| Cascade_Geosyntec Consultants, Inc. - City of Tallahassee Fire Training Facility - PN221026-118844 |
| GW Protection_Geosyntec (T) 1022060 S.pdf |
| Invoice |
| Geosyntec, Tallahassee Fire Training Division, Tallahassee, FL (MOT).xlsx.pdf |
| Sheet1 |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v1.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| COT FTF (ERIC_ 7413)_HW683 SOW_Supplemental Assessment_2022-12_txt_v2.pdf |
| Subtask 1 – Project Management |
| Subtask 2 – Site Assessment Work Plan, Health and Safety Plan, Access Agreements, and Source Water Sampling |
| Subtask 3 –Monitoring Well Installation |
| Right-of-Way Permitting |
| Utility Locate and Drilling Subcontractors |
| Monitoring Well Installation |
| Subtask 4 – Monitoring Well Sampling and Surveying |
| Laboratory Analysis |
| Trip Report |
| Subtask 5 – Investigation Derived Waste |
| Trip Report |
| Subtask 6 – Supplemental Site Assessment Report |
| Invoice and Deliverable Schedule: |
| ATTACHMENT A |
| ATTACHMENT B |
| ATTACHMENT C |
| ATTACHMENT D |
| ATTACHMENT E |
| ATTACHMENT F |
| Attachment A -COT FTF (ERIC_7413)_HW683 CEF-LOE_Supplemental Assessment_2022-12_v2.pdf |
| Cost Estimate |
| Subtask 2 |
| Subtask 3 |
| Subtask 4 |
| Subtask 5 |
| Subtask 6 |
| 2022-11_COT FTF Groundwater Assessment Rationale Table_Drilling_Rev2.pdf |
| Table 1 for SAWP |
| Monitoring Well Locations |
File details come from the government source that posted it. Updated .