CN-370000-HW684-DC005D.pdf
PDF 3 MB Posted
- Contract number
- HW684
- Issued by
- Florida
About this file
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to GHD Services, Inc. for environmental remediation services at the Michael the Cleaner site located at 3432 Clark Road, Sarasota, Sarasota County, Florida. The task assignment is entered pursuant to Contract Number HW684 and is designated as TA Number DC005D. The Department Project Manager is Nicole Varela, and the Contractor's Project Manager is Brian Moore. The task assignment became effective on April 22, 2024, with a completion date of October 1, 2024.
The contract authorizes GHD Services, Inc. to implement an Interim Source Removal Plan for the Michael the Cleaner site on a fixed unit rate basis with a total task assignment value of $206,809.73. The work is divided into four subtasks: Subtask 1 (Project Management) for $4,410.48; Subtask 2 (Baseline Groundwater Sampling and Well Abandonment) for $9,629.96; Subtask 3 (Source Removal) for $181,676.43; and Subtask 4 (Source Removal Report) for $11,092.86. Deliverables include a Baseline Groundwater Sampling Summary due June 6, 2024; Source Removal Daily Reports and Subcontractor Invoices due July 26, 2024; and the Source Removal Report due August 1, 2024. The work involves groundwater sampling from seven monitoring wells, well abandonment for three wells, excavation of approximately 733 tons of soil to a depth of five feet below land surface over a 2,780 square foot area, backfilling with stone and clean fill, and site restoration including asphalt and concrete repairs. Subcontractors include Montrose Environmental Solutions for excavation and soil transport ($147,893.98), EOS for chemical treatment products ($994.98), and Erwin Remediation for drum disposal services. The funding source is identified as N/A in the appropriation category section.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC005D Completion October 1, 2024
This Task Assignment authorizes GHD Services, Inc. to implement Interim Source Removal for the Michael the Cleaner (Clark Rd) site in accordance with the FDEP approved Interim Source Removal Plan along with the scope of work, cost estimate form, and schedule received on March 29, 2024.
Nicole Varela 850-245-8959 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD
GHD
Brian Moore 813-257-0658
ERIC_5426
3432 Clark Rd, Sarasota, Sarasota County
Michael the Cleaners (Clark Rd)
✔ $ 206,809.73
$ 206,809.73
Scope of Work
Brian Moore Digitally signed by Brian Moore Date: 2024.04.22 20:30:04 -04'00'
Teresa Booeshaghi
Teresa Booeshaghi Digitally signed by Teresa Booeshaghi Date: 2024.04.22 13:26:42 -04'00'
4/22/2024
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Subtask 2: Baseline Groundwater Sampling (7 wells) & Well Abandonment (3 wells) 06/06/2024
Subtask 3: Source Removal 07/26/2024
Subtasks 1 & 4: Source Removal Report + Project Management 08/01/2024
Subtask 2: Upon FDEP approval of Baseline Groundwater Sampling Summary (analytical data, field notes, email summary) $ 9,629.96
Subtask 3: Upon FDEP approval of Source Removal Daily Reports & Subcontractor Invoices (receipts, photos, field notes) $ 181,676.43
Subtasks 1 & 4: Upon FDEP approval of the Source Removal Report + Project Management $ 15,503.34
$ 206,809.73
HW684
DC005D
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: ERIC_5426
Michael the Cleaners (Clark Rd)
FROM: Nicole Varela, Project Manager
SUBJECT: Negotiation Summary
HW684_DC005D
Interim Source Removal
DATE: April 19, 2024
This Task Assignment authorizes GHD Services, Inc. to implement Interim Source Removal for the Michael the Cleaner (Clark Rd) site in accordance with the FDEP approved Interim Source Removal Plan along with the scope of work, cost estimate form, and schedule received on March 29, 2024.
The final deliverable due date is August 1, 2024, and the completion date for the task assignment is October 1, 2024. The final total cost for Task Assignment DC005D is $206,809.73.
Specific subtasks are detailed below:
Subtask 1: Project Management GHD is authorized to calculate Project Management costs at 13% of direct labor costs for all tasks associated with project management for an ISRP implementation at the site.
Subtask 2: Baseline Groundwater Sampling & Well Abandonment GHD will conduct groundwater sampling and well abandonment preparations in accordance with FDEP standard operating procedures (SOPs) and Water Management District guidelines.
Subtask 3: Source Removal GHD will implement Interim Source Removal in accordance with the Interim Source Removal Plan (ISRP), which was approved by FDEP on January 31, 2024.
Subtask 4: Source Removal Report GHD will prepare an Interim Source Removal Report (ISRR) to detail the source removal and restoration activities conducted on site.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 4/19/2024
Task #: DC005D SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Baseline Groundwater Sampling SubTask 7
Activity/Phase: Construction SubTask 3 Source Removal SubTask 8
Project Manager: Brian Moore, PE SubTask 4 Source Removal Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$49.53 Project Manager JM 30.25 30.25 $72.96 Principal Engineer/Scientis MC 8.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$56.19 Sr Professional Engineer JH 50.00 0.00 0.00 50.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$45.07 Professional Engineer/Sci GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.28 Project Engineer/Scientist CH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $49.53 Project Manager/ Enginee JM 39.00 9.00 21.00 9.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.25 Staff Engineer/Scientist NR 105.50 9.50 96.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.08 Project Manager/ Enginee SC 38.00 0.00 38.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.21 Senior Technician SA 27.00 27.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $26.63 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.21 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 13.00 3.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 $21.63 Administrative Assistant JJ 13.00 3.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Hours 323.75 30.25 59.50 155.00 79.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $13,023.93 $1,498.33 $2,079.96 $5,677.17 $3,768.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $16,905.06 $1,944.83 $2,699.79 $7,368.97 $4,891.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $4,923.04 $566.37 $786.22 $2,145.97 $1,424.48 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $34,852.03 $4,009.53 $5,565.97 $15,192.11 $10,084.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 4/19/2024
Task #: DC005D SubTask 1 Project Management SubTask 6
Site: Michael the Cleaner SubTask 2 Baseline Groundwater Sampling SubTask 7
Activity/Phase: Construction SubTask 3 Source Removal SubTask 8
Project Manager: Brian Moore, PE SubTask 4 Source Removal Report SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Travel
Vehicle Rental $1,560.00 $360.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,560.00 $0.00 $1,560.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $3,120.00 $360.00 $2,760.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $125.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Utility Location $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Atlantic Supply $22.90 $22.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Montrose $147,895.84 $0.00 $147,895.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
EOS $994.98 $0.00 $994.98 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $149,038.72 $147.90 $148,890.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $11,009.08 $14.79 $10,994.29 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $160,047.80 $162.69 $159,885.11 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $1,994.00 $1,994.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $153.00 $153.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $2,147.00 $2,147.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $480.00 $80.00 $400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $2,577.70 $657.70 $1,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,157.70 $837.70 $2,320.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $203,324.53 $4,009.53 $9,073.36 $180,157.22 $10,084.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $3,485.20 $400.95 $556.60 $1,519.21 $1,008.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $206,809.73 $4,410.48 $9,629.96 $181,676.43 $11,092.86 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Michael the Cleaner SUBTASK 2: Baseline Groundwater Sampling
DATE: 4/19/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Principal Scientist MC Well Abandonment Permitting 4 Principal Scientist MC Well Abandonment Completion Reports 4
Project Manager JM Prepare field scope of work 1 Project Manager JM Update HASP 1 Project Manager JM Contact Property Owner 1 Project Manager JM Data Summary prior to ISR Implementation 6
Senior Technician SA Mob/demob (3 days) 9 Senior Technician SA Water Levels (17 total) 2 Senior Technician SA Groundwater Sampling (4 wells) 6 Senior Technician SA Backfill Sampling and Borrow 4 Senior Technician SA Well Abandonment (3 wells) 6
Staff Engineer/Scientist RS Mob/demob 3 Staff Engineer/Scientist RS Water Levels (17 total) 2 Staff Engineer/Scientist RS Groundwater Sampling (3 wells) 4.5
9.5
Drafting Technician PM Water level contours (3 zones) 1.5 Drafting Technician PM Groundwater data (shallow/int/deep) 1.5
Administrative Assistant JJ Data Entry (17 wl, 7 gw) 1.5 Administrative Assistant JJ Update Summary Tables 1.5
TOTAL LABOR 59.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 3 $360.00
TOTAL VEHICLE $360.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin Remediation IDW Groundwater Disposal $125.00 drum 1 $125.00 Atlantic Supply Portland Cement Type 1, 47 lb $11.45 bag 2 $22.90
TOTAL $147.90
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
Volatile Organic Halocarbons EPA 8260 $73.00 7 $511.00 Total Recoverable Petroleum Hydrocarbons FL-PRO $88.00 2 $176.00
Volatile Organics (soil) EPA Method 8260 $150.00 1 $150.00 Semi-Volatile Organics (soil) EPA Method 8270 $240.00 1 $240.00
PAHs (soil) EPA Methodd 8310 $110.00 1 $110.00 8 RCRA Metals (soil) EPA Method 6010/7470 $119.00 1 $119.00
Pesticides (soil) EPA Method 8141 $170.00 1 $170.00 Pesticides (soil) EPA 8081 $105.00 1 $105.00
PFAS (soil) EPA 537 $325.00 1 $325.00 TRPH (soil) FL-PRO $88.00 1 $88.00 shipping large cooler (2 day) $70.00 2 $140.00 ice $6.50 2 $13.00
TOTAL LAB $2,147.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 2 $80.00
Equipment (Analytical Related) Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing (HDPE) $0.30 ft 189 $56.70 Silicon Tubing $3.00 ft 7 $21.00
Equipment (Other) Drum $100.00 drum 1 $100.00
TOTAL EQUIPMENT $837.70
FINAL --7/24/96
SUBTASK 3: Source Removal
DATE: 4/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Prepare field scope of work 1 Project Manager JM Update HASP 1 Project Manager JM Contact Property Owner 1 Project Manager JM mob/demob (2 days) 6 Project Manager JM Kickoff and Final Inspection 12
Project Engineer SC Daily Updates (10 days - 2 hrs/day) 20 Project Engineer SC mob/demob (2 days) 6 Project Engineer SC Kickoff and Final Inspection 12
Staff Engineer/Scientist NR Mob/demob (2 days) 6 Staff Engineer/Scientist NR Oversee Source Removal (2 weeks) 90
TOTAL LABOR 155
VEHICLE TYPE RATE UNIT USEAGE
SC/JM Company Truck $120.00 day 2 $240.00 NR Company Truck $480.00 week 2 $960.00
TOTAL VEHICLE $1,200.00
PER DIEM STAFF RATE UNIT USEAGE
Per Diem NR $36.00 day 10 $360.00 Hotel NR $150.00 night 8 $1,200.00
TOTAL PER DIEM $1,560.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Montrose Mobilization $7,500.00 each 1 $7,500.00 Montrose Utility Locate $1,035.00 each 1 $1,035.00 Montrose Security Fencing $2,000.00 each 1 $2,000.00 Montrose Soil Excavation/Loading/Backfill $33,472.00 LS 1 $33,472.00 Montrose Soil T&D $55.20 Ton 733 $40,461.60 Montrose Stone Backfill $51.83 yard 213 $11,039.79 Montrose Imported Backfill $21.28 yard 415 $8,831.20 Montrose Site Restoration $43,556.25 LS 1 $43,556.25 EOS EOS PRO $693.00 drum 1 $693.00 EOS Shipping $250.00 each 1 $250.00 EOS Tax $51.98 each 1 $51.98
TOTAL $148,890.82
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 10 $400.00
Equipment (Analytical Related) upwind/downwind (2 monitors) Dusttrack $960.00 week 2 $1,920.00
TOTAL EQUIPMENT $2,320.00
SUBTASK 4: Source Removal Report
DATE: 4/16/2024
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM prepare Source Removal Report 6 Project Manager JM Conclusions Recommendations 3
Sr Professional Engineer JH Assessment Summary and Background 6 Sr Professional Engineer JH Baseline groundwater sampling methodology 2 Sr Professional Engineer JH Baseline groundwater elevation results (shallow, intermediate, deep) 3 Sr Professional Engineer JH Baseline groundwater water quality results 2 Sr Professional Engineer JH Baseline groundwater analytical results (shallow, intermediate, deep) 3 Sr Professional Engineer JH Baseline groundwater UIC results 2 Sr Professional Engineer JH Backfill sampling and results 4 Sr Professional Engineer JH Dust monitoring procedures and results 4 Sr Professional Engineer JH Summarize sequence of source removal 8 Sr Professional Engineer JH Detail Quanities removed and excavation limits 8 Sr Professional Engineer JH Summarize monitoring results/dust control/elevation control 6 Sr Professional Engineer JH Conclusions/Recommendations 2
Drafting Technician PM Prepare Source Removal Figures 10
Administrative Assistant JJ Prepare Summary Tables for ISR/Manifests 5 Administrative Assistant JJ Document Preparation/Publishing/pdf 5
TOTAL LABOR 79
VEHICLE TYPE RATE UNIT USEAGE
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
TOTAL $0.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
TOTAL LAB $0.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
TOTAL EQUIPMENT $0.00
COST PROPOSAL FOR TASK DC005D
< Michael the Cleaner /FDEP ERIC_5426>
< Interim Source Removal Implementation>
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD previously completed site assessment activities and confirmation soil sampling at the Michael the Cleaner site. The assessment identified elevated levels of drycleaning chemicals in soil and groundwater beneath and downgradient of the former facility. As part of Task DC005C an ISRP was prepared that was recently approved by the Department. Task DC005D includes implementation of the source removal plan, specifically, baseline groundwater sampling and source removal activities as detailed below.
Subtask 1: Project Management Subtask 1 includes all tasks associated with project management for an ISRP implementation at the Michael the Cleaner site.
Subtask 2: Baseline Groundwater Sampling and Well Abandonment
The first step in implementation of the proposed source removal is baseline groundwater sampling. Groundwater sampling is proposed at monitoring wells MW006, MW008, MW010, MW011, MW012, MW013, and MW015. Sampling will include volatile organic halocarbons and/or total recoverable petroleum hydrocarbons as specified in the approved ISRP. Prior to groundwater sampling, depth to water measurements will be gathered from all available monitoring wells. Groundwater sampling will be conducted in accordance with FDEP standard operating procedures (SOPs). Samples will be analyzed in accordance with the approved monitoring schedule. Upon receipt of analytical results, the data will be tabulated and summarized for submittal to FDEP with recommendations.
As part of subtask 2 and following receipt of analytical data, well abandonment will be conducted in accordance with the approved ISRP. Monitoring wells MW006, MW011, and MW012 will be properly abandoned in accordance with Water Management District guidelines. Prior to well abandonment, the process will be permitted through local water management district and/or local health department. The wells will be abandoned by pumping grout bottom up using tubing or tremie method. Well abandonment completions will be included in the reporting under subtask 4.
Subtask 3: Source Removal Upon completion of baseline sampling and DEP approval of the email recommendations, source removal activities will be conducted. The following sequence of activities is proposed for the source removal.
• Backfill sampling
• Property Owner Notice
• Utility Clearance
• Equipment Staging
• Excavate Soils
• Backfill and Compaction
• Site Restoration
The excavation activities will be conducted using an excavator. The area will be excavated by maintaining a 1:1.5 slope down to the target depth of 5 feet below land surface. Soils will be directly loaded for off-site disposal. A total excavation weight of approximately 733 tons is expected. The soil is expected to be deemed non-hazardous and will be disposed at a Florida Class I Landfill.
Following excavation to depth, the area will be backfilled with a combination of pea gravel and clean backfill. Following placement of the pea gravel, clean import fill will be placed and compacted above a geotextile liner. The backfill will be used to bring the site to grade. The final restoration will involved repair of the asphalt pavement and concrete curbing.
During the excavation activities, GHD personnel will monitor the activities, conduct dust monitoring, and track truck manifests. and soil volumes/weights.
Subtask 4: Source Removal Report Following completion of source removal activities, a Source Removal Report (SRR) will be prepared. The SRR will include a summary of baseline groundwater sampling methods and results, a detail of the source removal activities, limits of excavation, waste manifests, and total excavation volumes/weights. The SRR will also include photographic documentation of the source removal and restoration activities. The SRR will propose additional monitoring to evaluate groundwater concentration trends.
Deliverables:
Deliverable Deliverable Due Date
Baseline Groundwater Sampling Summary 6/6/24
Source Removal Daily Reports and Subcontractor Invoices 7/26/24
Source Removal Report 8/1/24
Hampton Oaks Business Park, 5904 Hampton Oaks Parkway, Suite F Tampa, Florida 33610 United States United States
The Power of Commitment
GHD
Our ref: 12576594
February 21, 2024
Interested Bidders
FDEP – former Michael the Cleaner, 3432 Clark Road, Sarasota, Florida
GHD is requesting quotes for the implementation of source removal activities in accordance with GHD’s source removal plan dated August 11, 2023 (attached). The general scope is as follows:
• Complete public and private utility locate;
• Establish Site security through installation of a security fence;
• Prepare loading soil staging area;
• Remove asphalt and roadbase
• Complete excavation to target depth of 5 ft bls per the proposed sequencing for Day 1 through Day 4 (see Figure 16); disposal of excavated materials;
• Place gravel at bottom of the deeper excavation to establish working base for restoration;
• Place geotextile fabric membrane above gravel layer;
• Place backfill and compact;
• Replace asphalt paving, concrete curbing, and landscaping in excavated areas to match existing conditions;
Conduct excavation over 2,780 square foot area to 5 ft bls and allow for sloping of 1.5 to 1. Estimated soil volume is 543 cubic yards or 733 tons. General process for excavation to minimize impact to operating businesses is shown in Figure 16. Soil is assumed to be non-hazardous. A backfill sample will need to be provided by the contractor for chemical analysis prior to transport to the site. Quantity estimates for stone fill is 213 yards. Backfill is estimated at 332 cubic yards (415 yards in place).
Proctor and Compaction testing will be conducted by GHD personnel. Compaction requirements are 95% modified proctor.
12576594 | FDEP – former Michael the Cleaner, 3432 Clark Road, Sarasota, Florida 2
Bid Sheet
Michael the Cleaner
Sarasota, Sarasota County
Mobilization: each
Public and private utility locate each
Temporary Security Fencing each
Soil Excavation/Loading/Backfill/Compaction: LS
Soil T&D (assume non-haz): Ton
Stone Backfill: Yard
Imported Backfill: Yard
Site Restoration: LS
Bid Total
Bids must be submitted this form to the contact shown below: Brian Moore
GHD Services Inc.
5904 Hampton Oaks Parkway, Suite F Tampa, Florida 33610
Phone: (813) 257-0658
Fax: (813)971-1862
$7,500.00
$1,035.00
$2,000.00
$33,472.00
$55.20 per
$51.83 per
$21.28 per
$43,556.25
$147,893.98
Bid from Montrose Environmental Solutions
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS
U.P.
U.P.
M.H.
C.B.
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
STM
OE
OE
OE
OE
OE
OE
OE
OE
OE
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANX
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X X X X X X
SOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREA
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
KOREAN
BRBQ AND
SUSHI
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
RETAINING WALL AND VINYL
FENCE
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
STORMWATER
POND
SOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREASOIL STOCKPILING AREA
KOREAN
BRBQ AND
SUSHI
RETAINING WALL AND VINYL
FENCE
STORMWATER
POND
SOIL STOCKPILING AREA
PUBLIXPUBLIXPUBLIXPUBLIXPUBLIXPUBLIXPUBLIXPUBLIXPUBLIX
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
FORMER
DRY
CLEANER
LOCATION
EGRESSEGRESSEGRESSEGRESSEGRESSEGRESSEGRESSEGRESS
INGRESSINGRESSINGRESSINGRESSINGRESSINGRESSINGRESSINGRESS
EGRESS
INGRESS
SB027
SB028
SB020
SB019
SB018
SB008
SB009
SB003/PZ003
SB002/PZ002
SB021
SB015
SB012
SB013
SB016
SB032
SB030
SB017
A
A'
DAY 4DAY 4DAY 4DAY 4DAY 4DAY 4DAY 4DAY 4DAY 4
DAY 3DAY 3DAY 3DAY 3DAY 3DAY 3DAY 3DAY 3
DAY 2DAY 2DAY 2DAY 2DAY 2DAY 2DAY 2DAY 2
DAY 1DAY 1DAY 1DAY 1DAY 1DAY 1DAY 1DAY 1
DAY 3
DAY 2
DAY 1
Date Project No.
Filename: \\ghdnet\ghd\US\Tampa\Projects\565\12576594\Digital_Design\ACAD\Figures\RPT005\12576594-GHD-00-00-RPT-EN-D113_WB-005.dwg Plot Date: 10 August 2023 3:28 PM
12576594 August 2023
FIGURE 16
MICHAEL THE CLEANER (FDEP FACILITY ID #ERIC 5426)
3432 CLARK ROAD, SARASOTA, SARASOTA COUNTY
INTERIM SOURCE REMOVAL PLAN
EXCAVATION LAYOUT PLAN
Data Source: APEX, FIGURE 4, REPLACEMENT WELL NETWORK, BENEVA VILLAGE SHOPS, SARASOTA, FLORIDA, APEX, FIGURE 1, SITE PLAN, BENEVA VILLAGE SHOPS, SARASOTA, FLORIDA
Coordinate System:
FLORIDA WEST STATE PLANE
NAD83 FEET
0 7.5 15 ft 15.000005
0.0
N
PROPERTY BOUNDARY
LEGEND
POWER POLE (OVERHEAD)
SANITARY SEWER
GRATE INLET STORM SEWER
SOIL BORING AND MAGS LOCATION
U.P.
M.H.
C.B.
AREA OF PRIOR SOURCE REMOVAL
EXCEEDS LEACHABILITY-BASED SCTL
DOES NOT EXCEED LEACHABILITY-BASED SCTL
EXCEEDS LEACHABILITY-BASED SCTL, BUT PASSED SPLP
AREA OF SOURCE REMOVAL
CROSS-SECTION IN EXCAVATION AND BACKFILL DETAILS (SEE FIGURE 15)A A'
WORK BOUNDARY
SECURITY FENCE
EXCAVATION PHASES
X
DIRECTION OF TRUCK TRAVEL
EXCAVATION SLOPING 1:1.5 FEET
PROPOSED COMPACTION TESTING LOCATION
3007 N. 50th St. Tampa, FL 33619 813-909-0040
March 5, 2024
BRIAN MOORE PE
GHD
5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
Re: Former Michael the Cleaner Excavation 3432 Clark Rd., Sarasota, FL
Dear Mr. Moore, Action Environmental is pleased to provide the following bid for the excavation project locate at the former Michael the Cleaner site in Sarasota, Florida.
Below is a brief outline how the project will be completed and conditions/assumptions that are included as part of our bid. We are willing to discuss these should you have any questions or concerns
We look forward to future dialog regarding this bid and we appreciate the opportunity.
Methodology
Pre-Excavation
• Submit for local building permits.
• Layout excavation area with assistance from GHD.
• Call 811 Utility Locate and Perform GPR survey. Pothole, uncover and mark utilities.
• Provide erosion eels or other type of barriers to control storm water flow as necessary.
• Provide temporary fence panels to surround open excavation.
Excavation & Backfilling
• Sawcut perimeter of asphalt.
• Excavate soils starting at the northwest corner proceeding south/south east. Soils are to be direct loaded to the extent possible or stockpiled on plastic outside of the excavation footprint.
• Any utilities marked by the GPR or 811 survey shall be maintained during the soil removal process. All utilities within the excavation area (except irrigation) shall remain in place and not undermined during the excavation.
• If excessively wet soils are encountered the plan is to stockpile within the excavation to drain. If necessary, Action may stockpile soils on plastic in an area that slopes back to the excavation.
Action is assuming the extent of wet soils is limited and not deemed excessive resulting in delays to the project.
• Action anticipates that all soils are to be direct loaded to the extent possible.
• Once the excavation has progressed sufficiently to open up a workable area, then backfilling with stone will commence before the excavation is completed.
• Place #57 stone backfill in the areas where standing water and excessively moist/wet areas exist.
Stone shall only be places to a depth approximately 6-inches or less above the top of the observed water/excessive moisture depth which will allow for proper compaction of soils above the stone layer.
• Place filter fabric on top of the stone before soil backfill is placed.
mailto:brian.moore@ghd.com
Qty Unit Unit Rate Cost 1 1 ls 21,000.00$ 21,000.00$ 2 1 ls 500.00$ 500.00$ 3 1 ls 1,500.00$ 1,500.00$ 4 204 lf 12.00$ 2,448.00$ 5 1 ls 55,000.00$ 55,000.00$ 6 733 ton 54.00$ 39,582.00$ 7 213 ton 78.00$ 16,614.00$ 8 415 yard 27.00$ 11,205.00$ 9 2610 sf 6.50$ 16,965.00$
10 145 lf 75.00$ 10,875.00$ 11 1 allowance 7,500.00$ 7,500.00$
183,189.00$
Permit (Fees Invoiced at Cost + 6%)
Total
Public & Private Utility Locate Temporary Security Fencing Excavation/Backfill/Compaction Soil T&D #57 Stone Backfill Imported Soil Backfill Asphalt Restoration Curb Restoration Landscaping & Irrigation
FEE SCHEDULE
Item Description
Mobilization
• Backfill with clean certified fill and compact using a vibratory roller and obtain passing density tests according to the plans (95% of Modified Proctor)
• Apply EOS and Sodium Thiosulfate solution per plans during backfill. Action shall provide a 500-gallon water wagon capable of re-circulating for mixing and discharging into the excavation.
Asphalt Replacement
• Place and compact 6-inches of limerock roadbase as the final lift before asphalt re-surfacing, compact to 95% of Modified Proctor.
• Place 2.5-inches of asphalt.
• Paint parking strips (approx. 3) and one direction arrow.
Landscaping and Irrigation
• Provide and place 6-inches of topsoil
• Provide and plant Podocarpus (Qty: 40) and Mondo Grass (Qty: up to 150) plants.
• Provide and plant one live oak tree (7-gal)
• Provide and place mulch
• Replace existing irrigation Note: Landscaping & Irrigation is presented as an allowance and shall be completed by the property owner’s contractor either directly or through Action at Cost + 10%
Preliminary Schedule (after GPR Survey, based on workdays) Day 1: GPR, Fencing, Utility Locate, Sawcutting, Prep Day 2-5: Excavation Day 6-9: Backfill, Curb & Asphalt Prep Day 10: Curb Day 11: Asphalt Day 12: Cleanup, Demobe
CONDITIONS/ASSUMPTIONS
• Drawings (Signed & Sealed) for permitting provided by others.
• Includes $500 for direct permit fees. Actual fees invoiced at Cost + 10%.
• Assumes unlimited access to work area and excavation is completed in one phase.
• Assumes drive thru is closed.
• Excludes road plates.
• Excludes dewatering.
• Excludes analytical for waste profiling.
• Assumes no interfering active utilities causing significate delays.
• Assumes asphalt is disposed with soils and no separate manifest provided.
• Excludes backfill analytical
• Backfill proctor and density testing by GHD.
• Excludes tracking devise
• Excludes portable scales
• EOS & Sodium Thiosulfate provided by others.
• Assumes water source (hose bib) available for use onsite.
• Assumes paint for asphalt stripping is acceptable.
• Imported fill invoiced per trucked CY.
• Assumes backfill sources pass geotechnical and analytical testing requirements. Additional costs apply if a secondary source required.
• Excludes monitoring well abandonment or replacement.
• Excludes surveying
Respectfully Submitted, Action Environmental
Josh Pryor, EI Construction Division Manager
March 29, 2024
Brian Moore, PE
GHD
Tampa FL
813-257-0658
RE: Clark Road
Delivery to: GHD (office)
5904 Hampton Oaks Parkway, Suite F
Tampa FL, 33610
Product Amount Unit Unit Price Total
EOS Pro (1 drum) 420 lbs. $1.65 $693.00
Shipping 1.00 each $250.00 $250.00
Subtotal $943.00
Sales Tax % 7.500%
Sales Tax $51.98
Total $994.98
Quotation is valid for 30 days. Payment terms not to exceed 60 days
Authorized acceptance complete below
Printed Name:
Title:
Signature: Date:
Prj 12581983 Jenna Mart Brian Moore
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway, Suite F Tampa, FL 33610
June 13, 2023
Re: Non-Hazardous Drum Disposal – State of Florida
Mr. Moore:
The price for the transportation and disposal (T&D) of drums of non-hazardous soil and water located in the State of Florida is listed below.
Non-Hazardous Drums:
Description Rate Unit
False Mobilization (No drum found) $ 85.00 Per Stop
T&D - Non-Haz Soil $ 110.00 Per Drum
T&D - Non-Haz Water $ 125.00 Per Drum
The prices listed are all inclusive without any additional fees or charges (fuel surcharge, low volume stop fee etc.) and are valid for all regions in the State of Florida except for the Florida Keys. Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
The lab data we require for the disposal of drums of petroleum impacted soils are totals for BTEX and the 4 RCRA metals (arsenic, cadmium, chromium, and lead), with analyses no older than 1 year from the estimated disposal date.
We do not require analyticals for the disposal of Petroleum Contact Water (PCW) as long as it has only been impacted with petroleum - not pesticides, herbicides or dry-cleaning solvents etc.
Please ensure that all drum lids are properly secured and that drums are on a level surface like the surrounding area (i.e., not on a pallet, etc.). A single False Mobilization fee will apply if our driver is not able to locate a drum on site or if we are unable to access the property due to a locked gate, etc.
This quote is valid for 90 days.
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
Respectfully, Robert Donado Erwin Remediation, Inc.
Email: Robert@erwinremediation.com Office: (850) 466-2358
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf
Here you go Brian. I do this for a lot of engineering/consulting firms.
Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).
Pass around the GHD Florida offices
From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums
Craig, Is it possible to provide a generic quote for IDW water disposal.
Assumption is non-haz with necessary analytical Maybe provide a range of locations
South florida or central florida, or both?
Thanks in advance
We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination
BRIAN MOORE PE
GHD
Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com
The Power of Commitment
Connect
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Fri 3/29/24 Thu 4/18/24
2 Subtask 1: Project Managem 75 days Fri 4/19/24 Thu 8/1/24
3 Subtask 2: Baseline Groundwater Sampling
35 days Fri 4/19/24 Thu 6/6/24
4 Field Work Preparation 3 wks Fri 4/19/24 Thu 5/9/24
5 Backfill Sampling 1 day Thu 5/2/24 Thu 5/2/24
6 Groundwater Sampling 1 day Fri 5/10/24 Fri 5/10/24
7 Well Abandonment Permit3 wks Fri 4/19/24 Thu 5/9/24
8 Well Abandonment 1 day Mon 5/13/24 Mon 5/13/24
9 Data Summary 3 wks Fri 5/17/24 Thu 6/6/24
10 Subtask 3: Source Removal 10 days Mon 6/10/24 Fri 6/21/24
11 Site Security 1 day Mon 6/10/24 Mon 6/10/24
12 Source Removal 8 days Tue 6/11/24 Thu 6/20/24
13 Source Removal Monitorin10 days Mon 6/10/24 Fri 6/21/24
14 Site Restoration 2 days Thu 6/20/24 Fri 6/21/24
15 Subtask 4: Source Removal Report
6 wks Fri 6/21/24 Thu 8/1/24
W T F S S M T W T F S S M T W T F S S M T W T F S S M 24 Mar 31, '24 Apr 7, '24 Apr 14, '24 Apr
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC005D at the Michael the Cleaner site located in Sarastoa, Sarasota County
Project: TA_005D Date: Fri 3/29/24
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Fri 3/29/24 Thu 4/18/24
2 Subtask 1: Project Managem 75 days Fri 4/19/24 Thu 8/1/24
3 Subtask 2: Baseline Groundwater Sampling
35 days Fri 4/19/24 Thu 6/6/24
4 Field Work Preparation 3 wks Fri 4/19/24 Thu 5/9/24
5 Backfill Sampling 1 day Thu 5/2/24 Thu 5/2/24
6 Groundwater Sampling 1 day Fri 5/10/24 Fri 5/10/24
7 Well Abandonment Permit3 wks Fri 4/19/24 Thu 5/9/24
8 Well Abandonment 1 day Mon 5/13/24 Mon 5/13/24
9 Data Summary 3 wks Fri 5/17/24 Thu 6/6/24
10 Subtask 3: Source Removal 10 days Mon 6/10/24 Fri 6/21/24
11 Site Security 1 day Mon 6/10/24 Mon 6/10/24
12 Source Removal 8 days Tue 6/11/24 Thu 6/20/24
13 Source Removal Monitorin10 days Mon 6/10/24 Fri 6/21/24
14 Site Restoration 2 days Thu 6/20/24 Fri 6/21/24
15 Subtask 4: Source Removal Report
6 wks Fri 6/21/24 Thu 8/1/24
Jenna Martin
Skylar Albritton
Skylar Albritton
Meeghan Casey
Skylar A
M T W T F S S M T W T F S S M T W T F S S M T W T F pr 21, '24 Apr 28, '24 May 5, '24 May 12, '24
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC005D at the Michael the Cleaner site located in Sarastoa, Sarasota County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Fri 3/29/24 Thu 4/18/24
2 Subtask 1: Project Managem 75 days Fri 4/19/24 Thu 8/1/24
3 Subtask 2: Baseline Groundwater Sampling
35 days Fri 4/19/24 Thu 6/6/24
4 Field Work Preparation 3 wks Fri 4/19/24 Thu…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .