This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW684. The document establishes Task Assignment DC016A between the FDEP and GHD Services, Inc., a contractor based in Tampa, Florida. The project involves groundwater sampling and monitoring activities at the Island Cleaners site located in Sanibel, Lee County, Florida, with FDEP project manager Kevin Kane overseeing the work and GHD's Brian Moore serving as the contractor's project manager.
Task DC016A encompasses annual groundwater monitoring at five monitoring wells (MW001, MW003, MW005, MW006, and MW007) including water level measurements from all nine existing wells, groundwater sampling conducted in accordance with FDEP Standard Operating Procedures, laboratory analysis for VOHs, BTEX, and MTBE via EPA Method 8260, and preparation of a comprehensive Groundwater Monitoring Report. The work is structured in two subtasks: Subtask 1 for project management (calculated at 13% of direct labor) and Subtask 2 for groundwater monitoring activities. The total task assignment value is $4,613.58 on a fixed unit rate basis, with the deliverable due by September 1, 2022, and task completion scheduled for December 2, 2022. Costs include direct labor ($1,123.75), overhead and fringe benefits ($1,883.41), laboratory analysis ($608.50), field equipment and expendables ($467.20), investigation-derived waste disposal ($110.00), vehicle rental ($120.00), and a completion fee ($300.72). The contractor is reimbursed upon FDEP approval of the Groundwater Monitoring Report and Project Management deliverables.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC016A Completion December 2, 2022
GHD Services, Inc. will conduct groundwater sampling at the Island Cleaners site located in Sanibel, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on April 19, 2022.
Kevin Kane (850) 245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore (813) 257-0658
ERIC_4836
2445 Periwinkle Way, Sanibel, Lee County
Island Cleaners
✔ $ 4,613.58
$ 4,613.58
Scope of Work
Brian Moore
Contract Manager
Brian Moore Digitally signed by Brian Moore Date: 2022.05.12 17:23:39 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.05.12 14:48:33 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Groundwater Monitoring Report + Project Management 09/01/2022
Subtasks 1 and 2: Upon submittal and FDEP approval of the Groundwater Monitoring Report + Project Management $ 4,613.58
$ 4,613.58
HW684
DC016A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: May 11, 2022
SUBJECT: Task Assignment DC016A
Island Cleaners
ERIC_4836
Monitoring
GHD Services, Inc. (GHD) will conduct annual groundwater sampling. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.
Subtask 2: Groundwater Monitoring Groundwater sampling will be conducted at five (5) monitoring wells including monitoring wells MW001, MW003, MW005, MW006, and MW007. During mobilization for sampling, depth to water measurements will be gathered from all wells (9 total).
Groundwater sampling will be conducted in general accordance with FDEP SOPs.
Samples will be submitted to a fixed laboratory for analysis for the presence of VOHs, BTEX, and MTBE by EPA Method 8260.
Following receipt of analytical data, a Groundwater Monitoring Report will be prepared.
The report will include a detail of field activities along with a summary of laboratory analytical data. The monitoring report will also include recommendations regarding additional monitoring.
Investigation derived waste (IDW) disposal is anticipated and has been accounted for under this subtask. Subcontractors for IDW disposal were chosen on a lowest-cost basis. The Florida Department of Environmental Protection (FDEP) has a current and valid Site Access Agreement for this site, signed February 16, 2015.
This work will be conducted in line with the scope of work included with GHD’s proposal, received April 19, 2022. Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and proposal letter. The final deliverable due date is September 1, 2022, and the completion date for the task assignment is December 2, 2022.
The final cost total for Task Assignment DC016A is $4,613.58.
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/11/22
Task #: DC016A SubTask 1 Project Management SubTask 6
Site: Island Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$40.12 Project Manager JM 3.20 3.2 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$46.33 Sr Professional Engineer JH 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 10.75 10.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $39.82 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.12 Project Manager/ Engine JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $31.25 Staff Engineer/Scientist CH 10.50 10.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.76 Senior Technician SA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.65 Senior Technician SC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.69 Senior Technician WM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.58 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $18.75 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 2.00 2.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $22.44 Administrative Assistant DA 4.25 4.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 31.70 3.20 28.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $1,123.75 $129.28 $994.47 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $1,458.63 $167.81 $1,290.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $424.78 $48.87 $375.91 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $3,007.16 $345.96 $2,661.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 05/11/22
Task #: DC016A SubTask 1 Project Management SubTask 6
Site: Island Cleaners SubTask 2 Groundwater Monitoring SubTask 7
Activity/Phase: Monitoring SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $120.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $10.00 $10.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $110.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $550.00 $550.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $58.50 $58.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $608.50 $608.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $40.00 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $427.20 $427.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $467.20 $467.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $4,312.86 $345.96 $3,966.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $300.72 $34.60 $266.12 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $4,613.58 $380.56 $4,233.02 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Island Cleaners SUBTASK 2: Groundwater Monitoring
DATE: 05/11/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Sr Professional Engineer JH Conclusions/Recommendations 1
Professional Geologist GE Prepare field scope of work/contact owner 0.75 Professional Geologist GE Review COC and field notes 0.5 Professional Geologist GE Coordinate IDW disposal 1 Professional Geologist GE Previous monitoring summary/results 1 Professional Geologist GE Profile and arrange for IDW disposal 1 Professional Geologist GE Groundwater sampling methods/analysis 1 Professional Geologist GE Field parameter evaluation 1.25 Professional Geologist GE Groundwater flow evaluation 1.25 Professional Geologist GE Groundwater analytical evaluation 1.5 Professional Geologist GE QA/QC 1 Professional Geologist GE Conclusions/Recommendations 0.5
10.75
Project Engineer/Scientist CH Mob/demob (1 day) 1.5 Project Engineer/Scientist CH Water Levels (all wells - 9 total) 1.5 Project Engineer/Scientist CH Groundwater Sampling (5 wells) 7.5
10.5
CADD Design PM Update groundwater flow maps (shallow) 1 CADD Design PM Update groundwater analytical map 1
Staff Assistant DA Data entry (9 wls and 5 gw samples) 0.75 Staff Assistant DA Summary tables (water quality, elevation, analytical) 1 Staff Assistant DA Publish report generate pdf 1 Staff Assistant DA GIS/Adapt update 1.5
4.25
TOTAL LABOR 28.5
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $120.00 day 1 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
Erwin IDW Disposal 1 drum $100.00 $100.00
TOTAL $100.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs/BTEX/MTBE $110.00 5 $550.00 sample shipping (Two Day) small cooler $52.00 1 $52.00 ice $6.50 1 $6.50
TOTAL LAB $608.50
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 1 $40.00
Equipment (Analytical Related)
Groundwater Sampling Kit $290.00 Day 1 $290.00 Poly Tubing $0.30 ft 74 $22.20 Silicon Tubing $3.00 ft 5 $15.00 drum $100.00 each 1 $100.00
Equipment (Other) $0.00 $0.00
TOTAL EQUIPMENT $467.20
FINAL --7/24/96
COST PROPOSAL FOR TASK DC016A
<Island Cleaners, Inc./FDEP #ERIC_4836>
<Groundwater Monitoring >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD submitted a Site Assessment Report (SAR) in November 2015 for the Island Cleaners, Inc. site located in Sanibel, Lee County. The results of the groundwater sampling indicated that the horizontal and vertical extent of drycleaning compounds in soil and groundwater are limited, and likely controlled by changes in the shallow groundwater flow direction as the aquifer responds to tidal and seasonal influences. Although geochemical parameters suggest that reductive dechlorination is possible, the lack of breakdown compounds indicates that dechlorination is not readily occurring at the Site. GHD recommended semi-annual groundwater sampling to monitor subsurface conditions and to assure that plume migration remains limited. The Department approved the SAR and recommended the installation of two additional groundwater monitor wells.
More recently, GHD recommended and the Department approved continued annual monitoring in June-August of each year. Task DC016A includes annual groundwater monitoring.
Subtask 1: Project Management Subtask 1 includes all project management activities associated with completion of annual sampling and reporting.
Subtask 2: Groundwater Monitoring Groundwater monitoring will be conducted in July 2022. Groundwater sampling is proposed at site monitoring wells MW001, MW003, MW005, MW006, and MW007. The sampling will include gathering water levels from all existing wells (MW001 through MW008 and MW105) and conducting groundwater sampling in accordance with FDEP Standard Operating Procedures. All groundwater samples will be analyzed for the presence of BTEX/MTBE/volatile organic halocarbons by EPA Method 8260.
Following receipt of groundwater analytical data, a summary report will be prepared. The summary report will include a description of field sampling methodology and analytical results for both sampling events. The report will also include recommendations regarding the next step toward site rehabilitation.
Deliverables:
Deliverable Deliverable Due Date Field Notes and Groundwater Monitoring Report 9/1/22
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
March 16, 2020
Re: IP Cleaners - Miami, FL
Mr. Moore:
The price for disposal of two (2) drums of non-hazardous groundwater located in Miami, FL will be $100.00 per drum, or $200.00 total, for both transportation and disposal.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
From: Jamie Infinger To: Brian Moore Subject: RE: IP Cleaners - Miami Date: Monday, March 16, 2020 8:39:32 AM Attachments: image001.png image002.png image003.png image004.png
$95.00 per drum plus $150.00 stop charge Have a great day
Thanks, Jamie Infinger A Nationwide Waste Disposal Company Clean Management Environmental Group, Inc.
P: (800)-538-8131 F: (843)-538-7845 C: (912)-674-6783 jinfinger@cleanmanagement.com www.cleanmanagement.com
From: Brian.Moore@ghd.com [mailto:Brian.Moore@ghd.com] Sent: Sunday, March 15, 2020 11:45 AM To: Jamie Infinger <jinfinger@cleanmanagement.com> Subject: IP Cleaners - Miami
Jamie, Can you provide quote for disposal of 2 drums of water from the above site. Low level solvents, assume non-haz thanks
Brian Moore, PE
GHD
Proudly employee owned T: 813 257 0658 | M: 813 335 2147 | E: Brian.Moore@ghd.com 5904 Hampton Oaks Parkway Suite F Tampa Florida 33610 USA | www.ghd.com Connect
WATER | ENERGY & RESOURCES | ENVIRONMENT | PROPERTY & BUILDINGS | TRANSPORTATION
mailto:jinfinger@cleanmanagement.com mailto:Brian.Moore@ghd.com mailto:jinfinger@cleanmanagement.com http://www.cleanmanagement.com/ mailto:Brian.Moore@ghd.com http://www.ghd.com/ https://www.linkedin.com/company/ghd https://www.facebook.com/GHDGroup https://twitter.com/GHD_Namerica https://www.youtube.com/channel/UCwUGfe6zgaddIXqA7entIwQ https://www.ghd.com/en/sectors/water.aspx https://www.ghd.com/en/sectors/energy---resources.aspx https://www.ghd.com/en/sectors/environment.aspx https://www.ghd.com/en/sectors/property---buildings.aspx https://www.ghd.com/en/sectors/transportation.aspx
Please consider our environment before printing this email
CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.
This e-mail has been scanned for viruses
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 4/19/22 Mon 5/9/22
2 Subtask 1: Project Management
83 days Tue 5/10/22 Thu 9/1/22
3 Subtask 2: Groundwater Monitoring
46 days Thu 6/30/22 Thu 9/1/22
4 Field Work Preparation 2 wks Thu 6/30/22 Wed 7/13/22
5 Groundwater Sampling 1 day Thu 7/14/22 Thu 7/14/22
6 Groundwater Monitoring Report
6 wks Fri 7/22/22 Thu 9/1/22
4/10 4/17 4/24 5/1 5/8 5/15 May
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC016A at the Island Cleaners facility located in Sanibel, Lee County
Project: TA_016A Date: Tue 4/19/22
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 4/19/22 Mon 5/9/22
2 Subtask 1: Project Management
83 days Tue 5/10/22 Thu 9/1/22
3 Subtask 2: Groundwater Monitoring
46 days Thu 6/30/22 Thu 9/1/22
4 Field Work Preparation 2 wks Thu 6/30/22 Wed 7/13/22
5 Groundwater Sampling 1 day Thu 7/14/22 Thu 7/14/22
6 Groundwater Monitoring Report
6 wks Fri 7/22/22 Thu 9/1/22
5/22 5/29 6/5 6/12 6/19 6/26 June July
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC016A at the Island Cleaners facility located in Sanibel, Lee County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 4/19/22 Mon 5/9/22
2 Subtask 1: Project Management
83 days Tue 5/10/22 Thu 9/1/22
3 Subtask 2: Groundwater Monitoring
46 days Thu 6/30/22 Thu 9/1/22
4 Field Work Preparation 2 wks Thu 6/30/22 Wed 7/13/22
5 Groundwater Sampling 1 day Thu 7/14/22 Thu 7/14/22
6 Groundwater Monitoring Report
6 wks Fri 7/22/22 Thu 9/1/22
Gabrielle Enos
Connor Hayden
7/3 7/10 7/17 7/24 7/31 8/7 y August
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC016A at the Island Cleaners facility located in Sanibel, Lee County
Task Name Duration Start Finish
1 LOE Submittal/Approval 3 wks Tue 4/19/22 Mon 5/9/22
2 Subtask 1: Project Management
83 days Tue 5/10/22 Thu 9/1/22
3 Subtask 2: Groundwater Monitoring
46 days Thu 6/30/22 Thu 9/1/22
4 Field Work Preparation 2 wks Thu 6/30/22 Wed 7/13/22
5 Groundwater Sampling 1 day Thu 7/14/22 Thu 7/14/22
6 Groundwater Monitoring Report
6 wks Fri 7/22/22 Thu 9/1/22 Jeremy Hess,Gabrielle Enos,Peter M
8/14 8/21 8/28 9/4 9/11 9/18 September
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC016A at the Island Cleaners facility located in Sanibel, Lee County