This Task Assignment (TA Number DC004C) is a Florida Department of Environmental Protection (FDEP) contract with GHD Services, Inc. for environmental remediation services at the Garland Supply Co. site located at 7800 W 25th Ave, Hallandale, Miami-Dade County, Florida. The project is identified as ERIC_4464 under the underlying contract HW684. The Department Project Manager is Kevin Kane, and the Contractor's Project Manager is Brian Moore. The work is authorized under an Interim Source Removal Plan for the former Garland Supply Co. contaminated site.
The task authorizes GHD Services, Inc. to install seven (7) temporary groundwater monitoring wells via direct push technology and perform baseline groundwater sampling in the proposed excavation area. The work encompasses two subtasks: Subtask 1 (Project Management) calculated at 13% of direct labor costs, and Subtask 2 (Baseline Groundwater Sampling), which includes well installation, depth-to-water measurements, groundwater sampling and analysis for volatile organic halocarbons, total recoverable petroleum hydrocarbons, and dissolved gases, and backfill soil sampling. The total task assignment value is $18,904.36 on a fixed unit rate basis. Work commenced January 3, 2023, with a completion date of May 9, 2023, and deliverables due February 9, 2023. The cost includes direct labor ($2,072.92), overhead and fringe benefits ($3,473.22), subcontractor services for drilling ($7,520.00) and laboratory analysis ($3,064.00), field equipment and supplies ($986.50), vehicle rental ($480.00), and a completion fee ($554.72). Subcontractors selected on a lowest cost responsive and responsible basis include JAEE Environmental for drilling and Erwin Remediation for investigative derived waste (IDW) disposal.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection
(Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection CONTRACTOR Department Name:
Title:
Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW684
DC004C Completion May 9, 2023
This Task Assignment authorizes GHD Services, Inc. to install temporary wells via direct push and perform baseline groundwater sampling in the area of the proposed excavation as defined in the Interim Source Removal Plan in accordance with the GHD scope of work, cost estimate form, and schedule received on December 21, 2022.
Kevin Kane (850) 245-8971 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
GHD Services, Inc.
GHD Services, Inc.
Brian Moore (813) 257-0658
ERIC_ 4464
7800 W 25th Ave, Hallandale, Miami-Dade County
Garland Supply Co.
✔ $ 18,904.36
$ 18,904.36
Scope of Work
Brian Moore
Project Manager
Brian Moore Digitally signed by Brian Moore Date: 2022.12.21 14:35:13 -05'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2022.12.21 14:22:38 -05'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Baseline Sampling Summary, backfill sampling data, and field notes; PM 02/09/2023
Subtasks 1 & 2: Upon submittal and FDEP approval of Baseline Sampling Summary, backfill sampling data, and field notes; PM $ 18,904.36
$ 18,904.36
HW684
DC004C
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
TO: HW684 Contract File
FROM: Kevin Kane, Contract Manager
DATE: December 21, 2022
SUBJECT: Task Assignment HW684 DC004C
Garland Supply Co.
ERIC_4464
Temporary Well Installation and Baseline Groundwater Sampling
This Task Assignment authorizes GHD Services, Inc. (GHD) to install temporary wells using direct push technology (DPT) and perform baseline groundwater sampling in the area of the proposed excavation as defined in the Interim Source Removal Plan (ISRP) for the former Garland Supply Co. site. Specific subtasks are detailed below:
Subtask 1: Project Management Project Management is calculated at 13% of direct labor costs.
Subtask 2: Baseline Groundwater Sampling GHD will oversee the installation of seven (7) temporary groundwater monitoring wells via DPT. All seven wells and existing wells MW001, MW002, and MW003 will be sampled and analyzed in accordance with the schedule proposed in the ISRP for volatile organic halocarbons (VOHs), total recoverable petroleum hydrocarbons, and/or dissolved gases (methane, ethane, ethene). Samples from the backfill source area will also be collected and sampled for parameters identified in the ISRP. All data will be incorporated into the ISRP under a separate Task Assignment.
The lowest cost responsive and responsible drilling and investigation derived waste (IDW) subcontractors were chosen (JAEE Environmental and Erwin Remediation, respectively).
GHD and the FDEP confirmed a valid Site Access Agreement with the real property owner of the subject site is in place.
This work will be conducted in line with the scope of work included with GHD’s December 21, 2022, cost proposal, CEF, and Level-of-Effort sheets. The final deliverable will be submitted on or before February 9, 2023 and the completion date for the task assignment is November 18, 2022.
The final cost total for Task Assignment HW684 DC004C is $18,904.36
COST PROPOSAL FOR TASK DC004C
< Garland Supply , FDEP ERIC_4464>
< Interim Source Removal >
1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >
GHD prepared an Interim Source Removal (ISR) Plan for the Garland Supply site that was recently reviewed by the Department and approved. Task DC004C includes the activities associated with baseline groundwater sampling and characterization of the proposed backfill.
The ISR Plan proposes the excavation of shallow soils located at the site.
Subtask 1 – Project Management Subtask 1 includes all those activities associated with project management for the implementation, oversight, and reporting associated with the ISR implementation.
Subtask 2 – Baseline Groundwater Sampling Subtask 2 includes baseline groundwater sampling. As referenced in the ISRP, wells are not present in the vicinity of the proposed excavation area. As such, GHD will oversee direct push drilling that will involve the installation of seven (7) temporary wells. The temporary wells will be installed to depths of 15 (4), 28 (2), and 48 (1), feet below land surface.
Following installation, baseline sampling will be conducted at the new wells and at existing wells MW001, MW002, and MW003. Prior to sampling, depth to water measurements will be gathered at all available monitor wells. Groundwater sampling will be conducted in accordance with FDEP standard operating procedures. Groundwater samples will be analyzed in accordance with the sampling schedule proposed in the ISRP and include volatile organic halocarbons, total recoverable petroleum hydrocarbons, and/or dissolved gases (methane, ethane, ethene).
In addition to groundwater sampling, GHD will also gather a soil sample from the source location for the backfill. The soil sample will be analyzed for parameters identified in the
ISRP.
Upon receipt of analytical data, a summary will be prepared and submitted to the Department for review and approval prior to implementing the source removal.
Deliverable Deliverable Due Date Baseline sampling summary and backfill sampling data and field notes 2/9/23
ID Task Mode
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 12/20/22Mon 1/2/23
2 Subtask 1: Project Management
28 days Tue 1/3/23 Thu 2/9/23
3 Subtask 2: Baseline Groundwater Sampling
28 days Tue 1/3/23 Thu 2/9/23
4 Field Work Preparation 2 wks Tue 1/3/23 Mon 1/16/23
5 Temp Well Installation 1 day Tue 1/17/23 Tue 1/17/23
6 Groundwater Sampling 1 day Wed 1/18/23Wed 1/18/23
7 Borrow Pit Sampling 1 day Thu 1/19/23 Thu 1/19/23
8 Data Summary 2 wks Fri 1/27/23 Thu 2/9/23
12/11 12/18 12/25 1/1 January
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004C at the Garland Supply site located in Hialeah, Miami-Dade County
Project: TA_004C Date: Tue 12/20/22
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 12/20/22Mon 1/2/23
2 Subtask 1: Project Management
28 days Tue 1/3/23 Thu 2/9/23
3 Subtask 2: Baseline Groundwater Sampling
28 days Tue 1/3/23 Thu 2/9/23
4 Field Work Preparation 2 wks Tue 1/3/23 Mon 1/16/23
5 Temp Well Installation 1 day Tue 1/17/23 Tue 1/17/23
6 Groundwater Sampling 1 day Wed 1/18/23Wed 1/18/23
7 Borrow Pit Sampling 1 day Thu 1/19/23 Thu 1/19/23
8 Data Summary 2 wks Fri 1/27/23 Thu 2/9/23
Jenna Martin
Edgar Diaz
Edgar Diaz
Edgar Diaz
1/8 1/15 1/22 1/29 February
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004C at the Garland Supply site located in Hialeah, Miami-Dade County
Task Name Duration Start Finish
1 LOE Submittal/Approval 2 wks Tue 12/20/22Mon 1/2/23
2 Subtask 1: Project Management
28 days Tue 1/3/23 Thu 2/9/23
3 Subtask 2: Baseline Groundwater Sampling
28 days Tue 1/3/23 Thu 2/9/23
4 Field Work Preparation 2 wks Tue 1/3/23 Mon 1/16/23
5 Temp Well Installation 1 day Tue 1/17/23 Tue 1/17/23
6 Groundwater Sampling 1 day Wed 1/18/23Wed 1/18/23
7 Borrow Pit Sampling 1 day Thu 1/19/23 Thu 1/19/23
8 Data Summary 2 wks Fri 1/27/23 Thu 2/9/23 Jenna Martin,Peter McLean,Debra Andrews
2/5 2/12 2/19 2/26 March
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Schedule for the Implementation of Task DC004C at the Garland Supply site located in Hialeah, Miami-Dade County
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 12/21/22
Task #: DC004C SubTask 1 Project Management SubTask 6
Site: Garland Supply SubTask 2 Baseline Groundwater Sampling SubTask 7
Activity/Phase: Construction SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category
$44.81 Project Manager JM 5.30 5.3 $0.00 Principal Engineer/Scientist 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Technical Director 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$51.08 Sr Professional Engineer JH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 Senior Project Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$43.28 Professional Engineer/Sc GE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $40.11 Project Engineer/Scientis TC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 10.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $27.40 Staff Engineer/Scientist ED 43.00 43.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $32.40 Data Analyst JL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $43.35 Field Manager OT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $50.00 Senior Technician JW 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.55 Senior Technician DC 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $28.00 Senior Technician BJ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.25 Junior Technician WO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $19.00 Junior Technician JM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 3.50 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 4.50 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 Driller 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 HSEQ&R Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
$0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $0.00 0 0 0 0 0 0 0 0 0 0
Total Hours 66.30 5.30 61.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Direct Labor $2,072.92 $238.48 $1,834.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Overhead 129.80% $2,690.65 $309.55 $2,381.10 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $783.57 $90.15 $693.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $5,547.14 $638.18 $4,908.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Travel Vehicle Rental $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
FDEP COST ESTIMATEContractor: GHD Services Inc.
Date: 12/21/22
Task #: DC004C SubTask 1 Project Management SubTask 6
Site: Garland Supply SubTask 2 Baseline Groundwater Sampling SubTask 7
Activity/Phase: Construction SubTask 3 SubTask 8
Project Manager: Brian Moore, PE SubTask 4 SubTask 9
SubTask 5 SubTask 10
Totals 1 2 3 4 5 6 7 8 9 10 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $480.00 $480.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $7,300.00 $7,300.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
IDW $220.00 $220.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Envirosafe $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $7,520.00 $7,520.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $752.00 $752.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $8,272.00 $8,272.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Laboratory Analytical Costs $2,929.00 $2,929.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $135.00 $135.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $3,064.00 $3,064.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $686.50 $686.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $100.00 $100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $986.50 $986.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subtotal $18,349.64 $638.18 $17,711.46 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $554.72 $63.82 $490.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Total Estimated Cost $18,904.36 $702.00 $18,202.36 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
REV: 02/03 CEF ARCADIS Page 2
LEVEL OF EFFORT/EXPENSE WORKSHEET
SITE : Garland Supply SUBTASK 2: Baseline Groundwater Sampling
DATE: 12/21/22
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Project Manager JM Site Access 1 Project Manager JM Field Work Preparation 2 Project Manager JM Characterize IDW 1 Project Manager JM Prepare baseline data summary for submittal to FDEP 6
Staff Engineer/Scientist ED Mob/demob (4 days) 12 Staff Engineer/Scientist ED Oversee temporary well installation 2 Staff Engineer/Scientist ED Water Levels (17 wells) 2 Staff Engineer/Scientist ED Groundwater Sampling (10 wells) 15 Staff Engineer/Scientist ED travel to borrow location and sample backfill 6 Staff Engineer/Scientist ED Oversee temporary well removal/abandonment 6
Drafting Technician PM Locate temporary wells on site plan 0.5 Drafting Technician PM Groundwater elevation plans (shallow/intermediate/deep) 1.5 Drafting Technician PM Groundwater analytical data (shallow/int/deep) 1.5
3.5
Administrative Assistant DA Data Entry (17 wls and 10 wells) 1.5 Administrative Assistant DA Update summary tables (gw elev, water quality, analytical) 3
4.5
TOTAL LABOR 61
VEHICLE TYPE RATE UNIT USEAGE
Company Truck $480.00 week 1 $480.00
TOTAL VEHICLE $480.00
PER DIEM STAFF RATE UNIT USEAGE
$0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
NAME PURPOSE COST
JAEE Environmental Mobilization $300.00 each 3 $900.00 JAEE Environmental Daily Rate $1,700.00 day 2 $3,400.00 JAEE Environmental Drums $75.00 drum 2 $150.00 JAEE Environmental 15' well $150.00 each 4 $600.00 JAEE Environmental 28' well $250.00 each 2 $500.00 JAEE Environmental 48' well $350.00 each 1 $350.00 JAEE Environmental Abandon wells $200.00 each 7 $1,400.00 Erwin Remediation IDW drum disposal $110.00 drum 2 $220.00
TOTAL $7,520.00
LABORATORY COSTS
PARAMETER RATE # SAMPLES #QAQC
VOHs EPA Method 8260 $73.00 10 $730.00
TRPH FL-PRO $88.00 4 $352.00
Dissolved Gases RSK 175 $180.00 3 $540.00 Volatile Organics EPA Method 8260 $150.00 1 $150.00
Semi-Volatile Organics EPA Method 8270 $240.00 1 $240.00 PAHs EPA Methodd 8310 $110.00 1 $110.00
8 RCRA Metals EPA Method 6010/7470 $119.00 1 $119.00 Pesticides EPA Method 8141 $170.00 1 $170.00 Pesticides EPA 8081 $105.00 1 $105.00
PFAS EPA 537 $325.00 1 $325.00
TRPH FL-PRO $88.00 1 $88.00
Large Cooler (2 day) $70.00 1 $70.00 small cooler (2 day) $52.00 1 $52.00 Ice $6.50 2 $13.00
TOTAL LAB $3,064.00
EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS
Expendables
Expendables $40.00 day 5 $200.00
Equipment (Analytical Related)
Groundwater Sampling Kit $290.00 day 2 $580.00 Poly Tubing $0.30 ft 255 $76.50 Silicon Tubing $3.00 ft 10 $30.00
Equipment (IDW related)
Drum $100.00 each 1 $100.00
TOTAL EQUIPMENT $986.50
FINAL --7/24/96
2703 NW 19th Street, Pompano Beach, FL 33069
Monitoring Wells Sparge Wells Direct Push Geotechnical Drilling SONIC Drilling
DATE
CLIENT: PHONE
SITE:
PROPOSED SCOPE OF WORK:
Unit Number Rate of Units
Sonic Daily Rate per day $3,900.00 2
8" Sonic Over Ride Casing per foot $20.00 0
Compact Track Loader / Water Support per day $575.00 2
1" PVC Well Material (includes all annular backfill) per foot $12.00 164 2" PVC Well Material (includes all annular backfill) per foot 4" PVC Well Material (includes all annular backfill) per foot
8" Bolt-down completion per well $225.00 0 12" Bolt-down completion per well PVC Stickup w/ Development per well $135.00 7 Above Grade Protector (Aluminum) per well
Mobilization (Sonic Drill with all associated equipment) roundtrip $1,000.00 1 Daily Roundtrip for Crew roundtrip $495.00 1
Per Diem per night Permits each $110.00 0 Decontamination Pad (incl. setup & breakdown) lump sum Water Meter and usage (IF NEEDED) lump sum $1,800.00 0 DOT Approved 55-gal Drum (IF NEEDED) each $80.00 4 Borehole Abandonment per foot $8.00 0 Additional Well Development (IF NEEDED) 1/2 hr $75.00 0 Remob, Abandon & Patch (7) Wells each $2,500.00 1 Standby / Difficult Moving Time per hour $550.00 0 Days to Complete Scope of Work 2 Submitted By: Charles Bucher TOTAL QUOTE PRICE
$0.00
$0.00
$0.00
$0.00
$0.00
Well Completion (includes 30 min. development, bolt-down manhole, concrete pad(2'x2' or 10" circle) & lockable well cap $0.00
$1,968.00
12/8/2022
Garland Supply - 7800 W 25th Ave. - Hialeah, FL Client to provide access to water source
Hand Clear ALL Locations to 5' or REFUSAL
(813) 257-0658
(2) Temp MW 1" x 28' w/ 5' .010" Screen (20/30 Sand) - PVC Stickup - No Soil Coring/Sampling
GHD Brian Moore
$0.00
Drum Soil & Water
Sonic Daily Rate (Compact Track) Price Includes a ten hour work day ( 7 to 5 ) Unless otherwise stated in this quote.
(4) Temp MW 1" x 15' w/ 10' .010" Screen (20/30 Sand) - PVC Stickup - No Soil Coring/Sampling
$0.00
$495.00
$0.00
$0.00
Return at later date to remove/abandon wells and patch
$0.00
SONIC DRILL Unit Extended Price
$7,800.00
MISCELLANEOUS
$1,150.00
$0.00
WELL MATERIALS
$945.00
(1) Temp MW 1" x 48' w/ 5' .010" Screen (20/30 Sand) - PVC Stickup - No Soil Coring/Sampling
$16,178.00
$1,000.00
$0.00 $0.00
$320.00
$0.00
$0.00 $2,500.00
$0.00
Sonic Auger DPT Injection Well Abandonment
DATE: 12/7/2022
ESTIMATE #: 1222009
Project Description:
ID QTY Unit Rate TOTAL
1 2 each 1,200.00$ 2,400.00$
2 2 night 250.00$ 500.00$
3 2 day 1,650.00$ 3,300.00$
5 Materials: 1" PVC Well Installation 164 foot 4.00$ 656.00$
6 Materials: (2) 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point 4 each 175.00$ 700.00$
7 Materials: 1" x 5' PVC .010 Slot Prepack Screen, 3" Exp Point 3 each 95.00$ 285.00$
8 Materials: Grout and Abandon After Client Sampling 164 foot 8.00$ 1,312.00$
9 Well Development (up to 1/2 hour w/Pump) 7 each 75.00$ Included
10 Flight Auger Drilling (If Needed on Deep Wells) foot 14.00$ -$
11 55 gallon drums (Soil) (Estimated) 1 each 65.00$ 65.00$
12 55 gallon drums (Water) (Estimated) 2 each 65.00$ 130.00$
13 Permits (Miami Dade County) If Needed each 95.00$ -$
Completion: Subtotal 9,348.00$
Todd Hodgson
TOTAL 9,348.00$
Partner
If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 or Todd@drillprollc.com.
Note: It is Groundwater Protection policy that if 'Pea Gravel' is encountered, ANY type of boring/drilling will be terminated immediately and the boring location will need to be relocated to a clear location by the client.
THANK YOU FOR YOUR BUSINESS!
Todd Hodgson
DPT Rig and Crew (Installation)
"Actual quantities used and days on site will be invoiced"
2 Days for Installation and 1/2 day for Abandonment
DESCRIPTION
Mobilization/Demobilization
Utility Locates on Private Property is the responsibility of the client Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and cost.
Per Diem (2 man crew)
Damages to utilities on private property during borehole clearance are the responsibility of the client
(4) 1" x 15' PVC Temp MW w/10' of .010 Prepack Screen, No Completion, No Sampling
5904 Hampton Oaks Pkwy Suite F
GHD
Brian Moore
Hialeah, Miami Dade, Florida
DPT Well Installation
Return Trip to Remove within 30 days of install and Grout Wells.
PROJECT
Garland Supply 7800 W. 25th Avenue
(2) 1" x 28' PVC Temp MW w/5' of .010 Prepack Screen, No Completion, No Sampling
(1) 1" x 48' PVC Temp MW w/5' of .010 Prepack Screen, No Completion, No Sampling
Tampa, Florida 33610
(813) 971-3882
CUSTOMER
2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586
408 Ditmar Street
Pensacola, FL 32503
ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562
(850) 292-6511
To: Mr. Brian Moore
GHD
5904 Hampton Oaks Parkway – Suite F
Tampa, FL 33610
May 23, 2022
Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida
Mr. Moore:
The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.
This pricing is valid for all regions in the State of Florida except for the Florida Keys.
Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.
This quote is valid for 180 days.
Respectfully, Jonathan Erwin
Erwin Remediation, Inc.
Email: ErwinRemediation@Gmail.com
Office: (850) 292-6511 mailto:Remediation@Gmail.com
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2
Quote Number: 19644
QUOTE
QUOTED TO: Brian Moore
QUOTE DATE: 1/1/2022
COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns
PHONE NUMBER:
Ext.
FAX NUMBER:
PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS
CUSTOMER PO:
CONTACT EMAIL:
SITE ADDRESS: TBD
CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING
COST ESTIMATE FOR
THE SITE/ PROJECT LISTED ABOVE.
DESCRIPTION PRICE QTY. UNIT TOTAL
NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00
NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00
TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$30.00 DRUM $0.00
TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site
$40.00 DRUM $0.00
TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site
$50.00 DRUM $0.00
Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax
$0.00 . $0.00
HAZ Drums to be quoted case-by-case $0.00 . $0.00
OPTIONAL LINE ITEMS
***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00
TOTAL REQUIRED ITEMS $0.00
TOTAL OPTIONAL ITEMS $0.00
GRAND TOTAL $0.00
NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.
**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns
863.327.6289 - cburns@clarkenv.com
This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.
6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2
Name (print) Title
Signature Date
CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854
WWW.ClarkEnvironmental.com
Whatever Waste, LLC 3834 Mandarin Woods Dr. No.
Jacksonville, Florida 32223 United States 904.881.1957
Brian Moore PE
GHD
5904 Hampton Road Parkway Suite F Tampa, FL 33610
Estimate Number 062922.1
Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location
Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice
Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss
Estimate Date 06/29/2022
Description Rate Qty Line Total
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - Central FL Sites
(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums
$150.00 1 $150.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums
$200.00 1 $200.00
IDW-GW Drum Transport & Disposal - South FL Sites
(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums
$200.00 1 $200.00
Subtotal
Tax
700.00
0.00
Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.
| TA_004C.pdf |
| Cost Estimate |
| Sub 2 |
| TA_004C Bids.pdf |
| JAEE |
| GHD - Brian Moore - Garland Supply - 7800 W 25th Ave - Hialeah Sonic Temp Wells 12-8-2022 |
| Sheet1 |
| GHD (T) 1222009 DPT |
| Invoice |
TA_004C Bids
File details come from the government source that posted it. Updated .