This is a Specification Section (02541) for Erosion and Sediment Control work associated with the Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, managed by the West Branch Regional Authority in Clinton Township, Lycoming County, Pennsylvania. The work requires the contractor to provide all plant, labor, and materials necessary to prevent erosion and sedimentation of all disturbed areas within the project limits. The project encompasses the construction of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing, and associated surface restoration and appurtenances. Sealed bids were due February 16, 2026, at 1:00 PM local time, with bids submitted online through http://pennbid.net/. The specification section references the approved Erosion and Sediment Control Plan, an NPDES permit, and compliance with Pennsylvania Department of Environmental Protection (PADEP) standards and Pennsylvania Department of Transportation (PennDOT) Construction Specifications.

The contractor must implement erosion and sediment control devices and Best Management Practices (BMPs) including compost filter socks, stabilized construction entrances, stockpiles, and channel stabilization in accordance with the approved plans and drawings. All materials and products must meet requirements specified in the approved Erosion and Sediment Control Plan, manufacturer specifications, or PADEP standards, whichever is more stringent. The specification mandates maintenance schedules and construction sequences as outlined in the approved plans. Failure to implement the Erosion and Sediment Control Plan may result in stop work orders from government agencies, with no extension of time or additional compensation granted for such violations. Each bid must be accompanied by a certified check or bid bond equal to ten percent (10%) of the total bid amount, and all work is subject to prevailing wage rates established by the Pennsylvania Department of Labor and Industry and the Pennsylvania Steel Products Procurement Act of 1978.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02541

EROSION AND SEDIMENT CONTROL DIVISION 2

West Branch Regional Authority 02541-1 January 2026 Route 54 Sanitary Sewer Extension Project Erosion and Sediment Control Contract No. WB-1

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. Scope

1. The work covered under this section shall consist of providing all plant, labor and materials required to prevent erosion and sedimentation of all disturbed areas within the project limits, as set forth on the Drawings and in accordance with this section of the specifications.

2. The Erosion and Sediment Control approved by the local Conservation District shall be considered a part of these specifications.

1.02 RELATED WORK INCLUDED IN PROJECT SPECIFICATIONS

A. Section 02102: Clearing and Grubbing

B. Section 02205: Earthwork for Pipelines

C. Section 02820: Topsoil, Seeding and Mulching

D. The Contractor is referred to the approved NPDES permit enclosed in Appendix No. 2.

1.03 INTENT

A. It is the intent of this Specification to provide details and specifications which are adequate for the prevention of sediment pollution caused by erosion of areas where earth moving activities and construction are being performed.

1.04 REFERENCES

A. The Contractor shall fully implement and maintain the erosion and sediment control measures approved and permitted in the following plans which are on file with the Engineer:

1. Erosion and Sediment Control Plan approved by the County Conservation District

B. Pennsylvania Department of Environmental Protection (PADEP), Bureau of Waterways

Engineering and Wetlands, Division of Wetlands, Encroachment and Training Erosion and Sediment Pollution Control Program Manual.

C. Pennsylvania Department of Transportation (PennDOT) Publication No. 408 - Construction

Specifications and any subsequent addenda thereto.

West Branch Regional Authority 02541-2 January 2026

1.05 GOVERNMENTAL REQUIREMENTS

A. The Contractor is cautioned that failure to implement the Erosion and Sediment Control Plan as specified in the approved plan may result in a stop work order issued to the Contractor by any government agency having jurisdiction in regard to the implementation and maintenance of the plan. No extension of time or additional compensation will be granted if a stop work order should occur as a result of any action performed by the Contractor or negligence of the Contractor to complete any action which may be necessary to meet the intent of this Specification.

PART 2 - MATERIALS

2.01 GENERAL

A. All products and materials shall meet the requirements as shown in the approved Erosion and Sediment Control Plan and drawings, manufacturer’s specifications or the Pennsylvania Department of Environmental Protection (PADEP), Bureau of Waterways Engineering and Wetlands, Division of Wetlands, Encroachment and Training Erosion and Sediment Pollution Control Program Manual, whichever is more stringent.

2.02 EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZATION MEASURES

A. All erosion and sediment control devices (compost filter socks, stabilized construction entrances, stockpiles, channel stabilization, etc.) and Best Management Practices (BMPs) shall be constructed in accordance with the approved Erosion and Sediment Control Plan and Drawings.

B. Temporary stabilization, seeding and mulching shall be performed in accordance with the materials and specifications shown in the approved Erosion and Sediment Control Plan

C. Permanent stabilization, seeding and mulching shall be performed in accordance with the materials and specifications shown in the approved Erosion and Sediment Control Plan

PART 3 - EXECUTION

3.01 CONSTRUCTION SEQUENCE

A. Refer to the approved Erosion and Sediment Control Plan and Drawings for the construction sequence(s).

3.02 MAINTENANCE SCHEDULE

West Branch Regional Authority 02541-3 January 2026

A. Refer to the approved Erosion and Sediment Control Plan and Drawings for the maintenance schedule for each sediment control device and BMP.