About this file
This is a Specification Section (02541) for Erosion and Sediment Control work associated with the Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, managed by the West Branch Regional Authority in Clinton Township, Lycoming County, Pennsylvania. The work requires the contractor to provide all plant, labor, and materials necessary to prevent erosion and sedimentation of all disturbed areas within the project limits. The project encompasses the construction of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing, and associated surface restoration and appurtenances. Sealed bids were due February 16, 2026, at 1:00 PM local time, with bids submitted online through http://pennbid.net/. The specification section references the approved Erosion and Sediment Control Plan, an NPDES permit, and compliance with Pennsylvania Department of Environmental Protection (PADEP) standards and Pennsylvania Department of Transportation (PennDOT) Construction Specifications.
The contractor must implement erosion and sediment control devices and Best Management Practices (BMPs) including compost filter socks, stabilized construction entrances, stockpiles, and channel stabilization in accordance with the approved plans and drawings. All materials and products must meet requirements specified in the approved Erosion and Sediment Control Plan, manufacturer specifications, or PADEP standards, whichever is more stringent. The specification mandates maintenance schedules and construction sequences as outlined in the approved plans. Failure to implement the Erosion and Sediment Control Plan may result in stop work orders from government agencies, with no extension of time or additional compensation granted for such violations. Each bid must be accompanied by a certified check or bid bond equal to ten percent (10%) of the total bid amount, and all work is subject to prevailing wage rates established by the Pennsylvania Department of Labor and Industry and the Pennsylvania Steel Products Procurement Act of 1978.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02541
EROSION AND SEDIMENT CONTROL DIVISION 2
West Branch Regional Authority 02541-1 January 2026 Route 54 Sanitary Sewer Extension Project Erosion and Sediment Control Contract No. WB-1
PART 1 - GENERAL
1.01 DESCRIPTION OF WORK
A. Scope
1. The work covered under this section shall consist of providing all plant, labor and materials required to prevent erosion and sedimentation of all disturbed areas within the project limits, as set forth on the Drawings and in accordance with this section of the specifications.
2. The Erosion and Sediment Control approved by the local Conservation District shall be considered a part of these specifications.
1.02 RELATED WORK INCLUDED IN PROJECT SPECIFICATIONS
A. Section 02102: Clearing and Grubbing
B. Section 02205: Earthwork for Pipelines
C. Section 02820: Topsoil, Seeding and Mulching
D. The Contractor is referred to the approved NPDES permit enclosed in Appendix No. 2.
1.03 INTENT
A. It is the intent of this Specification to provide details and specifications which are adequate for the prevention of sediment pollution caused by erosion of areas where earth moving activities and construction are being performed.
1.04 REFERENCES
A. The Contractor shall fully implement and maintain the erosion and sediment control measures approved and permitted in the following plans which are on file with the Engineer:
1. Erosion and Sediment Control Plan approved by the County Conservation District
B. Pennsylvania Department of Environmental Protection (PADEP), Bureau of Waterways
Engineering and Wetlands, Division of Wetlands, Encroachment and Training Erosion and Sediment Pollution Control Program Manual.
C. Pennsylvania Department of Transportation (PennDOT) Publication No. 408 - Construction
Specifications and any subsequent addenda thereto.
West Branch Regional Authority 02541-2 January 2026
1.05 GOVERNMENTAL REQUIREMENTS
A. The Contractor is cautioned that failure to implement the Erosion and Sediment Control Plan as specified in the approved plan may result in a stop work order issued to the Contractor by any government agency having jurisdiction in regard to the implementation and maintenance of the plan. No extension of time or additional compensation will be granted if a stop work order should occur as a result of any action performed by the Contractor or negligence of the Contractor to complete any action which may be necessary to meet the intent of this Specification.
PART 2 - MATERIALS
2.01 GENERAL
A. All products and materials shall meet the requirements as shown in the approved Erosion and Sediment Control Plan and drawings, manufacturer’s specifications or the Pennsylvania Department of Environmental Protection (PADEP), Bureau of Waterways Engineering and Wetlands, Division of Wetlands, Encroachment and Training Erosion and Sediment Pollution Control Program Manual, whichever is more stringent.
2.02 EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZATION MEASURES
A. All erosion and sediment control devices (compost filter socks, stabilized construction entrances, stockpiles, channel stabilization, etc.) and Best Management Practices (BMPs) shall be constructed in accordance with the approved Erosion and Sediment Control Plan and Drawings.
B. Temporary stabilization, seeding and mulching shall be performed in accordance with the materials and specifications shown in the approved Erosion and Sediment Control Plan
C. Permanent stabilization, seeding and mulching shall be performed in accordance with the materials and specifications shown in the approved Erosion and Sediment Control Plan
PART 3 - EXECUTION
3.01 CONSTRUCTION SEQUENCE
A. Refer to the approved Erosion and Sediment Control Plan and Drawings for the construction sequence(s).
3.02 MAINTENANCE SCHEDULE
West Branch Regional Authority 02541-3 January 2026
A. Refer to the approved Erosion and Sediment Control Plan and Drawings for the maintenance schedule for each sediment control device and BMP.