71-REV 1.19.26 16511 Led Exterior Lighting.pdf

PDF 121 KB Posted

Attached to
Route 54 Sanitary Sewer Extension Project
Solicitation number
Not on record
Issued by
Lycoming County, Pennsylvania

About this file

This is a specifications document for LED exterior lighting as part of the Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, issued by the West Branch Regional Authority in Pennsylvania. The project involves the installation of exterior solid-state LED luminaires designed exclusively for LED lamp technology, including luminaire supports and luminaire-mounted photoelectric relays. The specifications require square-shaped, wall-mounted luminaires with integral photocells for dusk-to-dawn operation, specified mounting heights as indicated on the fixture schedule, and distribution patterns as detailed in the fixture schedule. All luminaires must be obtained from a single manufacturer source to ensure consistency in quality and appearance. Sealed bids for the overall sanitary sewer extension project are due by 1:00 PM local prevailing time on Monday, February 16, 2026, submitted online through PennBid. The project includes approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, and one stream crossing, located in Clinton Township, Lycoming County, Pennsylvania.

All electrical components must be listed and labeled by a qualified testing agency in compliance with NFPA 70 and UL 1598 standards for wet location use. Luminaires must meet minimum specifications including a Color Rendering Index of 70, Correlated Color Temperature of 3500K, an L70 lamp life of 50,000 hours, dimmable operation from 100% to 0% output, 120V AC nominal operating voltage, and individual in-line fusing for each luminaire. Metal components must be corrosion-resistant aluminum, with diffusers made from virgin acrylic plastic or annealed crystal glass, and minimum lens thickness of 0.125 inch. The manufacturer warranty period is two years from the date of Substantial Completion. Prospective bidders are required to submit a bid bond or certified check equal to ten percent of the total bid amount. Contractors are subject to Pennsylvania prevailing wage requirements as established by the Department of Labor and Industry and must comply with the Pennsylvania Steel Products Procurement Act of 1978.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
49-03100 Concrete Formwork.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 16511

LED EXTERIOR LIGHTING DIVISION 16

West Branch Regional Authority 16511-1 January 2026 Route 54 Sanitary Sewer Extension Project LED Exterior Lighting Contract No. WB-1

PART 1 - GENERAL

1.01 SUMMARY

A. Section Includes:

1. Exterior solid-state luminaires that are designed for and exclusively use LED lamp technology.

2. Luminaire supports.

3. Luminaire-mounted photoelectric relays.

B. Related Requirements:

1. Section 16000: Electrical General Provisions for automatic control of lighting, in-cluding time switches, photoelectric relays, occupancy sensors, and multipole lighting relays and contactors.

1.02 DEFINITIONS

A. CCT: Correlated color temperature.

B. CRI: Color rendering index.

C. Fixture: See “Luminaire”.

D. IP: International Protection or Ingress Protection Rating

E. Lumen: Measured output of lamp and luminaire, or both.

F. Luminaire: Complete lighting unit, including lamp, reflector, and housing.

1.03 ACTION SUBMITTALS

A. Product Data: For each type of luminaire.

1.04 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Plans, drawn to scale and coordinated.

B. Sample warranty.

1.05 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

West Branch Regional Authority 16511-2 January 2026

1. Provide a list of all lamp types used on Project. Use ANSI and manufacturers' codes.

2. Provide a list of all photoelectric relay types used on Project. Use manufacturers' codes.

1.06 WARRANTY

A. Warranty: Manufacturer and Installer agree to repair or replace components of luminaires that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two (2) years from date of Substantial Completion.

PART 2 - PRODUCTS

2.01 LUMINAIRE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. NRTL Compliance: Luminaires shall be listed and labeled for indicated class and division of hazard by an NRTL.

C. UL Compliance: Comply with UL 1598 and listed for wet location.

D. CRI of minimum 70. CCT of 3500.

E. L70 lamp life of 50,000 hours.

F. Lamps dimmable from 100% percent to 0% percent of maximum light output.

G. Nominal Operating Voltage: 120 V ac.

H. In-line Fusing: Separate in-line fuse for each luminaire.

I. Lamp Rating: Lamp marked for outdoor use.

J. Source Limitations: Obtain luminaires from single source from a single manufacturer.

K. Source Limitations: For luminaires, obtain each color, grade, finish, type, and variety of lu-minaires from single source with resources to provide products of consistent quality in ap-pearance and physical properties.

2.02 LUMINAIRE TYPES

A. Area and Site:

West Branch Regional Authority 16511-3 January 2026

1. Luminaire Shape: Square.

2. Mounting: Building Wall.

3. Luminaire-Mounting Height: as indicated on fixture schedule.

4. Distribution: As indicated on fixture schedule.

5. Luminaire shall contain integral photocell for dusk-to-dawn operation.

2.03 MATERIALS

A. Metal Parts: Free of burrs and sharp corners and edges.

B. Sheet Metal Components: Corrosion-resistant aluminum. Form and support to prevent warping and sagging.

C. Doors, Frames, and Other Internal Access: Smooth operating, free of light leakage under operating conditions, and designed to permit relamping without use of tools. Designed to prevent doors, frames, lenses, diffusers, and other components from falling accidentally during relamping and when secured in operating position. Doors shall be removable for cleaning or replacing lenses.

D. Diffusers and Globes:

1. Acrylic Diffusers: 100% percent virgin acrylic plastic, with high resistance to yellowing and other changes due to aging, exposure to heat, and UV radiation.

2. Glass: Annealed crystal glass unless otherwise indicated.

3. Lens Thickness: At least 0.125 inch minimum unless otherwise indicated.

E. Lens and Refractor Gaskets: Use heat- and aging-resistant resilient gaskets to seal and cushion lenses and refractors in luminaire doors.

F. Reflecting surfaces shall have minimum reflectance as follows unless otherwise indicated:

1. White Surfaces: 85% percent.

2. Specular Surfaces: 83% percent.

3. Diffusing Specular Surfaces: 75% percent.

G. Housings:

1. Rigidly formed, weather- and light-tight enclosure that will not warp, sag, or deform in use.

2. Provide filter/breather for enclosed luminaires.

2.04 FINISHES

West Branch Regional Authority 16511-4 January 2026

A. Variations in Finishes: Noticeable variations in same piece are unacceptable. Variations in appearance of adjoining components are acceptable if they are within the range of ap-proved Samples and are assembled or installed to minimize contrast.

B. Luminaire Finish: Manufacturer's standard paint applied to factory-assembled and -tested luminaire before shipping.

PART 3 - EXECUTION

3.01 GENERAL INSTALLATION REQUIREMENTS

A. Comply with NECA 1.

B. Use fastening methods and materials selected to resist forces defined for the application and approved by manufacturer.

C. Fasten luminaire to structural support. NFPA 70 requires minimum support for luminaires.

Retain “Supports” Paragraph below for more specific support requirements and for re-quirements exceeding code minimums. For projects requiring seismic design, additional supports, and restraining devices beyond those specified here may be required. See the Evaluations.

D. Supports:

1. Sized and rated for luminaire weight.

2. Able to maintain luminaire position after cleaning and relamping.

3. Support luminaires without causing deflection of finished surface.

4. Luminaire-mounting devices shall be capable of supporting a horizontal force of

100% percent of luminaire weight and a vertical force of 400% percent of luminaire weight.

E. Wall-Mounted Luminaire Support:

1. Attached to structural members in walls.

F. Wiring Method: Install cables in raceways. Conceal raceways and cables.

G. Coordinate layout and installation of luminaires with other construction.

H. Adjust luminaires that require field adjustment or aiming.

3.02 IDENTIFICATION

A. Identify system components, wiring, cabling, and terminals.

West Branch Regional Authority 16511-5 January 2026

3.03 FIELD QUALITY CONTROL

A. Inspect each installed luminaire for damage. Replace damaged luminaires and compo-nents.

B. Luminaire will be considered defective if it does not pass tests and inspections.