This is a technical specification document for Section 16161 Grounding prepared by the West Branch Regional Authority for the Route 54 Sanitary Sewer Extension Project (Contract No. WB-1) in Clinton Township, Lycoming County, Pennsylvania. The specification establishes grounding requirements for the project's power system infrastructure, including the installation of a complete grounding system that complies with the National Electrical Code (NFPA 70) and applicable inspection authority standards. The grounding system must achieve a ground grid resistance of less than 5 ohms, as measured and documented by the contractor using an earth test megger. The minimal acceptable grounding grid configuration consists of two 8-foot copper clad steel rods, spaced at least 8 feet apart and interconnected with bare stranded copper cable to the main service disconnect ground busbar. Sealed bids for the overall project are due February 16, 2026, at 1:00 PM local time through PennBid, with the project comprising approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, and one stream crossing.

The specification requires all grounding conductors to be sized in accordance with NFPA 70 Section 250 and the applicable power company standards, with connections made using approved solderless connectors that are bolted or clamped to equipment. All metal contact surfaces must be thoroughly cleaned and bright before connection to ensure proper metal-to-metal contact. The specification prohibits flexible steel conduit as a ground for motor circuits or circuits where vibration is present, instead mandating properly sized copper grounding conductors. All wireways, conduits, ducts, and similar systems must have a continuous grounding conductor with green insulation installed therein. The contractor must provide a bid bond equal to ten percent of the total bid amount, and work is subject to Pennsylvania prevailing wage requirements and the Pennsylvania Steel Products Procurement Act of 1978.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
49-03100 Concrete Formwork.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 16161

GROUNDING DIVISION 16

West Branch Regional Authority 16161-1 January 2026 Route 54 Sanitary Sewer Extension Project Grounding Contract No. WB-1

PART 1 - GENERAL

1.01 WORK INCLUDED

A. Power system grounding.

1.02 RELATED WORK

A. Section 16111: Conduit

B. Section 16120: Wires and Cables

1.03 REFERENCE STANDARDS

A. National Fire Protection Association (NFPA)

1. NFPA 70: National Electrical Code (NEC)

1.04 REQUIREMENTS OF REGULATORY AGENCIES

A. Install complete grounding system in accordance with the National Electrical Code, the applicable inspection authority and the Power Company involved.

1.05 TESTS

A. Measure ground grid resistance with earth test megger and install additional ground rods and conductors as required until resistance is less than 5 OHMS. All ground reading will be documented in a report to the Engineer.

PART 2 - PRODUCTS

2.01 GROUNDING

A. Ground connections shall be sized in accordance with the requirements of NFPA 70 Section 250 and the Power Company involved and shall be connected throughout with clamp fittings. Ground conductors shall be run through conduit and shall be securely bonded to such conduit at both entrance and exit. All connections to equipment or conduit shall be made with an approved type solderless connector, and same shall be bolted or clamped to equipment or conduit. All contact surfaces shall be thoroughly cleaned and bright before connection is made so as to ensure a good metal to metal contact.

B. The minimal acceptable grounding grid (counter poise) shall be two (2) 8 ft. copper clad steel rods, driven into the earth with at least 8 feet of space between rods and interconnected by indicated bare stranded copper cable connected directly to the main service disconnect ground busbar.

SECTION 16161

GROUNDING DIVISION 16

West Branch Regional Authority 16161-2 January 2026 Route 54 Sanitary Sewer Extension Project Grounding Contract No. WB-1

PART 3 - EXECUTION

3.01 POWER SYSTEM GROUNDING

A. All equipment shall be solidly grounded by a bare copper conductor sized per NFPA-70, Table 250-122 and as noted on the Drawings.

B. All grounding fittings for service and equipment grounds shall be of the approved type.

C. Flexible steel conduit will not be accepted as a ground on motor circuits or any other circuit where vibration is present. A properly sized copper grounding conductor is required.

D. Conduit systems shall be grounded by means of appropriate grounding bushings, grounding studs, and grounding jumpers installed at main switchboards, panelboards, pullboxes, in-ground pullboxes, electrical manholes, motor control enclosures, and on flexible metallic conduit. The grounding bushings shall be interconnected by properly sized copper bonding wires to ensure continuous ground.

E. All metal raceways shall be grounded to the main distribution panel by a properly sized copper bonding wire.

F. Non-electrical piping systems shall be grounded as required by the National Electrical Code Section 250-81 or local requirements.

G. ALL WIREWAYS, CONDUITS, DUCTS, ETC. SHALL HAVE A CONTINUOUS

GROUNDING CONDUCTOR INSTALLED THEREIN. This conductor shall be identified with green insulation. Connections from this conductor to all device and junction boxes shall be by a method approved by the Engineer.

File details come from the government source that posted it. Updated .