14-00660 Form Change Order No 1.pdf

PDF 89 KB Posted

Attached to
Route 54 Sanitary Sewer Extension Project
Solicitation number
US.218912
Issued by
Lycoming County, Pennsylvania

About this file

This is a blank Change Order form for Contract No. WB-1 related to the Route 54 Sanitary Sewer Extension Project, issued by the West Branch Regional Authority in Pennsylvania. The project involves the construction of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, and one stream crossing located within easements over private property and Snaurytown Road right-of-way in Clinton Township, Lycoming County, Pennsylvania. Sealed bids for the project were to be received online through PennBid until 1:00 PM on Monday, February 16, 2026. The Engineer of Record is Levine Engineering, LLC, located in Altoona, Pennsylvania.

The Change Order form is unfilled, showing zero values for the original contract price, net increase or decrease of previous change orders, net increase or decrease of this change order, and contract price with all approved change orders. Prospective bidders were required to submit a bid bond or certified check in the amount of ten percent (10%) of the total bid amount. All work performed under this contract is subject to Pennsylvania prevailing wage rates as established by the Department of Labor and Industry, and contractors must comply with the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. Complete bid documents and project information were available exclusively through the PennBid website, with periodic updates regarding addenda and other relevant bidding information provided to registered plan holders.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
49-03100 Concrete Formwork.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHANGE ORDER NO. ___

CONTRACT NO.: WB-1 DATE OF ISSUANCE:

__________________________, 20____

PROJECT: Route 54 Sanitary Sewer Extension Project

ORIGINAL CONTRACT PRICE:

$0.00

OWNER: West Branch Regional Authority NET INCREASE OR (DECREASE)

127 Girton Drive OF PREVIOUS CHANGE ORDER:

Muncy, PA 17756 $0.00

SUCCESSFUL BIDDER: CONTRACT PRICE PRIOR TO

THIS CHANGE ORDER:

$0.00

ENGINEER: Levine Engineering, LLC NET INCREASE OR (DECREASE)

2703 Washington Avenue OF THIS CHANGE ORDER:

Altoona, PA 16601 $0.00

CONTRACT PRICE WITH ALL

APPROVED CHANGE ORDERS:

$0.00

Purpose of Change Order:

Conditions of Change Order: 1.

2.

Attachments: 1.

2.

RECOMMENDED: By:_________________________________

Project Engineer

APPROVED: By:_________________________________

West Branch Regional Authority

APPROVED: By:_________________________________

Contractor

Contract No. WB-1 Page 1 West Branch Regional Authority

File details come from the government source that posted it. Updated .