This is a Traffic Regulation specification document for the Route 54 Sanitary Sewer Extension Project issued by the West Branch Regional Authority in Pennsylvania. The specification outlines traffic control requirements for a sanitary sewer infrastructure project consisting of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, and one stream crossing located in Clinton Township, Lycoming County, Pennsylvania. Sealed bids for Contract No. WB-1 were to be received online at http://pennbid.net/ until 1:00 PM local time on Monday, February 16, 2026. The specification requires comprehensive traffic management including construction parking control, trained flagmen for traffic regulation, flares and lights for low-visibility conditions, designated haul routes, traffic signs and signals, and removal of all traffic control devices upon project completion. All traffic control work must comply with Pennsylvania Department of Transportation standards and PennDOT-approved equipment and apparel requirements.
The specification mandates that contractors control vehicular parking to prevent interference with public traffic and emergency vehicle access, provide advance notification to school bus operations at least 48 hours prior to extended traffic delays, and publicize detours through newspaper and radio announcements with approval from the respective jurisdiction. All traffic control schemes on state highways must follow PennDOT Publication standards, while local jurisdictions may establish requirements for other areas. Contractors are responsible for repairing any damage caused by traffic control equipment installation and removing all post settings upon completion. Work performed on this contract is subject to prevailing minimum project wage rates as established by the Pennsylvania Department of Labor and Industry, and contractors must submit a bid bond equal to 10 percent of the total bid amount.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01570
TRAFFIC REGULATION DIVISION 1
West Branch Regional Authority 01570-1 January 2026 Route 54 Sanitary Sewer Extension Project Traffic Regulation Contract No. WB-1
PART 1 - GENERAL
1.01 SECTION INCLUDES
A. Construction Parking Control B. Flagmen C. Flares and Lights D. Haul Routes E. Traffic Signs and Signals F. Removal
1.02 RELATED SECTIONS
A. Section 01000: Summary of Work and Special Requirements.
1.03 REFERENCE
A. Pennsylvania Department of Transportation Publication - Work Zone Traffic Control
1.04 SIGNS, SIGNALS, AND DEVICES
A. Post Mounted Traffic Control: Specified in PennDOT Publication.
B. Flagmen Equipment/Apparel, traffic cones, drums, flares, and lights, shall be PennDOT approved when working on State highways.
C. Traffic control schemes as shown in Publication shall be used on State highways for respective operations.
D. Local jurisdictions may apply in other areas of application.
1.05 CONSTRUCTION PARKING CONTROL
A. Control vehicular parking to prevent interference with public traffic, access and parking, access by emergency vehicles, and Owner's operations.
B. Monitor parking of construction personnel's vehicles. Maintain vehicular access to and through parking areas.
C. Prevent parking on or adjacent to access roads or in non-designated areas.
1.06 CONSTRUCTION SITE WORK/DELAYS
A. Provide trained and equipped flagmen to regulate traffic when construction operations or traffic encroach on public traffic lanes.
SECTION 01570
TRAFFIC REGULATION DIVISION 1
West Branch Regional Authority 01570-2 January 2026 Route 54 Sanitary Sewer Extension Project Traffic Regulation Contract No. WB-1
B. When extended delays to traffic movement are anticipated while working in highways and streets, the Contractor shall notify all School Bus operations at least 48 hours in advance.
C. Public shall also be notified in advance by newspaper and radio announcements.
D. Any detours shall be approved by respective jurisdiction.
1.07 FLARES AND LIGHTS
A. Use flares and lights during hours of low visibility to delineate traffic lanes and to guide traffic.
1.08 HAUL ROUTES
A. Consult with the Authority having jurisdiction in establishing public thoroughfares to be used for haul routes and site access.
B. Confine construction traffic to designated haul routes.
C. Provide traffic control at critical areas of haul routes to regulate traffic, to minimize interference with public traffic.
1.09 TRAFFIC SIGNS AND SIGNALS
A. At approaches to site and on site, install at crossroads, detours, parking areas, and elsewhere as needed to direct construction and affected public traffic.
B. Relocate as work progresses, to maintain effective traffic control.
1.10 REMOVAL
A. Remove equipment and devices when no longer required.
B. Repair damage caused by installation.
C. Remove post settings.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED