41 22 00 Cranes and Hoists.pdf

PDF 481 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

Summary

This is a technical specifications document for Section 41 22 00 - Cranes and Hoists, prepared by Herbert, Rowland & Grubic, Inc., for the Northwestern Chester County Municipal Authority's West Pump Station Replacement Project in Pennsylvania. The specification details the procurement of one stationary Davit Crane system designed to remove and lift a sewage grinder from a wet well into a pick-up truck. The crane equipment must meet specific performance requirements including a crane rating of 2,800 pounds with a winch configuration rated at 2,000 pounds at 20 feet below floor with 90-inch reach. The specified basis of design is a Thern, Inc. Model 5FT25X-E2X, featuring 360-degree rotation, adjustable boom angle and reach (54-122 inches horizontally and 66-150 inches vertically), welded structural steel pipe construction with gray epoxy coating, and stainless steel hardware. The manufacturer must demonstrate a minimum of five years of experience producing substantially similar equipment, and all submittals must include descriptive literature, complete equipment lists with manufacturer names and model numbers, operation and maintenance data, assembly instructions, and certified load test results.

The winch component of the crane system shall be electric-powered with a 1.5 HP, 115/1/60 VAC motor, automatic internal mechanical load brake, emergency hand crank feature, 6-foot NEMA 4 pendant control, and line speed capability ranging from 9-16 feet per minute. The cable specification requires 45 feet of 5/16-inch diameter stainless steel aircraft cable with a swivel hook. Installation requirements mandate that the contractor provide location data, structural moment/reaction calculations, and bolt specifications to the precast wet well manufacturer to ensure proper design for the intended load. The contractor must complete installation according to shop drawings and manufacturer instructions, followed by demonstration of the crane's operational capability by successfully removing and reinstalling all intended equipment from the wet well. The project bids are due May 20, 2026 at 10:00 AM and include three separate contracts: WPS-1 (General Construction), WPS-2 (Electrical Construction), and WPS-3 (Mechanical Construction), submitted on a lump sum basis.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

41 22 00 – CRANES AND HOISTS

Herbert, Rowland & Grubic, Inc. 41 22 00 - 1 000483.0450

SECTION 41 22 00 – CRANES AND HOISTS

PART 1 - GENERAL

1.1 SCOPE

A. Stationary Davit Cranes.

1.2 SYSTEM DESCRIPTION

A. Provide 1 stationary Davit Cranes. The Davit Crane shall include stationary hoist base, davit crane, winch, wire rope, and accessories.

1. Davit Crane: The stationary hoist base shall be located to allow removal of the

Sewage Grinder from the wet well and lift it high enough to unload into a pick-up truck.

1.3 SUBMITTALS

A. Submit under provisions of Section 01 33 00 – Submittal Procedures.

B. Submittals shall also consist of the following:

1. Descriptive literature, bulletins, or other data supportive of the crane equipment’s capability of fulfilling the requirements of this specification.

2. Complete list of equipment with the Manufacturer’s name and model numbers.

3. Operation and Maintenance Data: As defined in Section 01 78 23 – Operation and

Maintenance Data.

4. Submit assembly instructions when shipping equipment.

5. Submit certified test results of load tests for cranes.

1.4 QUALIFICATION

A. Manufacturer shall have a minimum five (5) years experience producing substantially similar equipment.

1.5 QUALITY ASSURANCE

A. Verify hook and lifting heights for each application to assure each system is completely operational over range intended.

1.6 WARRANTY

A. Provide in accordance with Section 01 73 00 – Execution Requirements.

Herbert, Rowland & Grubic, Inc. 41 22 00 - 2 000483.0450

PART 2 - PRODUCTS

2.1 STATIONARY DAVIT CRANE FOR SEWAGE GRINDER

A. Basis of Design Manufactuer/Model: Thern, Inc. Model 5FT25X-E2X.

B. Load Rating:

1. Crane Rating: 2,800 pounds.

2. Winch Configuration: 2,000 pounds (at 20 feet below the floor with 90” reach).

C. Crane:

1. 360 degree rotation.

2. Adjustable Boom Angle using ratchet style screw jack with black defender coating.

3. Adjustable boom reach/height with boom extension:

a. Adjustable hook reach from mast centerline: 54-122 inches.

b. Adjustable hook height from floor: 66 – 150 inches.

4. Welded construction of structural steel pipe and tubing.

5. Gray epoxy coated finish.

6. Stainless steel assembly hardware.

D. Cable: 45 feet, 5/16-inch diameter, stainless steel aircraft cable.

E. Hook: Swivel Hook

F. Electric Winch:

1. 1.5 HP, 115/1/60 VAC motor.

2. Automatic internal mechanical load brake.

3. EHC (Emergency Hand Crank) feature, includes 5/8” square input shaft on the reducer.

4. 20-foot power cord with grounded plug.

a. If 20-foot power cord from manufacturer is not available, provide a 12AWG outdoor extension cord with 3 prong grounded plug ends to provide a minimum 20-foot overall distance from the winch to the electrical outlet.

5. 6-foot NEMA 4 pendant control.

6. Line Speed range from 9 – 16 fpm.

7. Bearing plate to attach to the crane.

8. Gray epoxy coated finish.

9. Stainless steel fasteners to mount winch to crane.

PART 3 - EXECUTION

3.01 INSTALLATION

Herbert, Rowland & Grubic, Inc. 41 22 00 - 3 000483.0450

A. Locate davit crane base installation to ensure davit crane hook coverage is capable of lifting all equipment intended.

1. Provide location, structural moments/reactions, and bolt locations/size of the davit crane base to the precast wet well manufacturer so that the wet well is designed for the intended load.

B. Install davit crane complete with all necessary hardware, according to Shop Drawings, manufacturer’s written instructions, and as specified.

C. Demonstrate davit crane operation by successfully removing all intended equipment from the wet well and reinstalling.

END OF SECTION 41 22 00