This is a Construction Waste Management and Disposal specification document prepared by Herbert, Rowland & Grubic, Inc. for the West Pump Station Replacement Project under Northwestern Chester County Municipal Authority in Pennsylvania. The specification establishes requirements for construction waste management throughout the project, including the development and implementation of a comprehensive waste management plan, construction waste salvaging and recycling, adaptive reuse of materials, and proper disposal of nonhazardous demolition and construction waste and wastewater. The contractor must submit a detailed construction waste management plan for engineer approval prior to construction commencement, describing transportation providers, recycling facilities, anticipated recyclable materials, on-site sorting methods, and storage procedures. Documentation of waste management compliance must accompany each application for payment, including quantities of materials diverted from landfills, salvaged materials by weight with destinations, associated costs and fees, and net cost or savings achieved through plan implementation.

The specification mandates a minimum 50 percent landfill diversion rate by weight of all construction waste materials throughout the project duration through resale, recycling, or adaptive reuse. The contractor must implement the approved plan at the start of construction and review it at preconstruction and progress meetings. Suggested recyclable materials include packing materials, plastics, organic plant debris, earth materials, native stone, asphalt and concrete paving, wood, glass, metals, and equipment oil. The contractor is responsible for maintaining organized collection areas with separated materials to prevent co-mingling, covering materials subject to disintegration or runoff, obtaining receipts for all deliveries to processing and disposal facilities, and ensuring all wastewater is transported, treated, and disposed of in compliance with applicable regulations.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
46 24 23 - Channel Sewage Grinders.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Herbert, Rowland & Grubic, Inc. 01 74 19 - 1 000483.0450

SECTION 01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Construction waste management plan.

2. Construction waste salvaging and recycling.

3. Construction waste adaptive reuse.

4. Disposing of nonhazardous demolition and construction waste.

5. Disposing of untreated or partially treated wastewater.

1.2 PLAN REQUIREMENTS

A. Develop and implement construction waste management plan as approved by Engineer.

B. Intent:

1. Divert construction, demolition, and land-clearing debris from landfill disposal.

2. Redirect recyclable material back to manufacturing process.

3. Generate cost savings or increase minimal additional cost to Project for waste disposal.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures contains requirements for submittals.

B. Construction Waste Management Plan: Submit construction waste management plan describing methods and procedures for implementation and monitoring compliance including the following:

1. Transportation company hauling construction waste to waste processing facilities.

2. Recycling and adaptive reuse processing facilities and waste type each facility will accept.

3. Construction waste materials anticipated for recycling and adaptive reuse.

4. On-Site sorting and Site storage methods.

C. Wastewater Disposal: Submit plan describing methods and procedures for implementation and monitoring compliance including the following:

1. Transportation company hauling waste to processing and disposal facilities.

2. Treatment and disposal facilities.

3. On-Site removal methods.

D. Submit documentation with each application for payment substantiating construction waste management plan was maintained and goals are being achieved.

1. Trash: Quantity by weight deposited in landfills. Include associated fees, transportation costs, container rentals, and taxes for total cost of disposal.

Herbert, Rowland & Grubic, Inc. 01 74 19 - 2 000483.0450

2. Salvaged Material: Quantity by weight with destination for each type of material salvaged for resale, recycling, or adaptive reuse. Include associated fees, transportation costs, container rentals, taxes for total cost of disposal, and reimbursements due to salvage resale.

3. Total Cost: Indicate total cost or savings for implementation of construction waste management plan.

1.4 CONSTRUCTION WASTE MANAGEMENT PLAN

A. Construction Waste Landfill Diversion: Minimum 50 percent by weight of construction waste materials for duration of Project through resale, recycling, or adaptive reuse.

B. Implement construction waste management plan at start of construction.

C. Review construction waste management plan at preconstruction meeting and progress meetings specified in Section 01 31 19 – Project Meetings.

D. Distribute approved construction waste management plan to Subcontractors and others affected by plan requirements.

E. Oversee plan implementation, instruct construction personnel for plan compliance, and document plan results.

F. Purchase products to prevent waste by:

1. Ensuring correct quantity of each material is delivered to Site.

2. Choosing products with minimal or no packaging.

3. Requiring suppliers to use returnable pallets or containers.

4. Requiring suppliers to take or buy back rejected or unused items.

1.5 CONSTRUCTION WASTE RECYCLING

A. Use source separation method or comingling method suitable to sorting and processing method of selected recycling center. Dispose nonrecyclable trash separately into landfill.

B. Source Separation Method: Recyclable materials separated from trash and sorted into separate bins or containers, identified by waste type, prior to transportation to recycling center.

C. Comingling Method: Recyclable materials separated from trash and placed in unsorted bins or container for sorting at recycling center.

D. Materials suggested for recycling include:

1. Packing materials including paper, cardboard, foam plastic, and sheeting.

2. Recyclable plastics.

3. Organic plant debris.

4. Earth materials.

5. Native stone and granular fill.

6. Asphalt and concrete paving.

7. Wood with and without embedded nails and staples.

Herbert, Rowland & Grubic, Inc. 01 74 19 - 3 000483.0450

8. Glass.

9. Metals.

10. Equipment oil.

1.6 CONSTRUCTION WASTE ADAPTIVE REUSE

A. Arrange with processing facility for salvage of construction material and processing for reuse. Do not reuse construction materials on-Site except as allowed by Engineer.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 CONSTRUCTION WASTE COLLECTION

A. Collect construction waste materials in marked bins or containers and arrange for transportation to recycling centers or adaptive salvage and reuse processing facilities.

B. Maintain recycling and adaptive reuse storage and collection area in orderly arrangement with materials separated to eliminate co-mingling of materials required to be delivered separately to waste processing facility.

C. Store construction waste materials to prevent environmental pollution, fire hazards, hazards to persons and property, and contamination of stored materials.

D. Cover construction waste materials subject to disintegration, evaporation, settling, or runoff to prevent polluting air, water, and soil.

3.2 CONSTRUCTION WASTE DISPOSAL

A. Deliver construction waste to waste processing facilities. Obtain receipt for deliveries.

B. Dispose of construction waste not capable of being recycled or adaptively reused by delivery to landfill, incinerator, or other legal disposal facility. Obtain receipt for deliveries.

3.1 Wastewater Disposal

A. Request Owner to isolate existing process tanks where Work is required.

B. Remove all contents of existing process tank.

C. Transport, treat and dispose of the removed contents in compliance with all regulations.

END OF SECTION 01 74 19