This is a Certificate of Substantial Completion document, a modified EJCDC C-625 form, prepared by the Engineers Joint Contract Documents Committee in 2018 and used by Northwestern Chester County Municipal Authority for the West Pump Station Replacement Project in Pennsylvania. The certificate establishes the date of substantial completion for construction work, marking the commencement of the contractual correction period and applicable warranties. The document applies to all work or specified portions thereof as designated by the Engineer and confirms that authorized representatives of the Owner, Contractor, and Engineer have inspected the work and determined it to be substantially complete. A punch list of items to be completed or corrected is attached to the certificate, though this list is not necessarily all-inclusive and does not relieve the Contractor of responsibility to complete all work according to the Contract Documents. The Certificate does not constitute acceptance of non-conforming work nor release the Contractor from its obligation to complete all work in accordance with the Contract Documents.
The certificate delineates the responsibilities between Owner and Contractor regarding security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon the Owner's use or occupancy of the work, with provisions for amendments through mutual agreement as specified in Paragraph 15.03.D of the General Conditions. The date of substantial completion marks the beginning of the contractual correction period during which the Contractor remains responsible for warranty obligations and completion of any punch list items. The certificate requires execution by an authorized Engineer representative and may include attached documents such as the punch list and other supporting documentation. Any amendments to the Owner's or Contractor's responsibilities must be documented as part of the certificate record.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modified EJCDC® C-625, Certificate of Substantial Completion. Prepared and published 2018 by the Engineers Joint Contract Documents Committee.
Herbert, Rowland & Grubic, Inc. 00 65 16 - 1 000483.0450
CERTIFICATE OF SUBSTANTIAL COMPLETION
Owner: Owner's Contract No.:
Contractor: Contractor’s Project No.:
Engineer: Engineer's Project No.:
Project: Contract Name:
This ☐ Preliminary ☐ Final Certificate of Substantial Completion applies to:
All Work The following specified portions of the Work:
[Describe the portion of the work for which Certificate of Substantial Completion is issued]
Date of Substantial Completion: [Enter date, as determined by Engineer]
The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete. The Date of Substantial Completion of the Work or portion thereof designated above is hereby established, subject to the provisions of the Contract pertaining to Substantial Completion.
The date of Substantial Completion in the final Certificate of Substantial Completion marks the commencement of the contractual correction period and applicable warranties required by the Contract.
A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.
Amendments of contractual responsibilities recorded in this Certificate should be the product of mutual agreement of Owner and Contractor; see Paragraph 15.03.D of the General Conditions.
The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon Owner's use or occupancy of the Work must be as provided in the Contract, except as amended as follows:
Amendments to Owner's responsibilities: None As follows
[List amendments to Owner’s Responsibilities]
Amendments to Contractor's responsibilities: None As follows:
[List amendments to Contractor’s Responsibilities]
The following documents are attached to and made a part of this Certificate: [punch list; others documents]
This Certificate does not constitute an acceptance of Work not in accordance with the Contract Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the Contract.
EXECUTED BY ENGINEER:
By:
(Authorized signature)
Name:
Title: