40 05 78.29 - Combination Air Valves For Wastewater Service.pdf

PDF 486 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a technical specification document for combination air valves for wastewater service prepared by Herbert, Rowland & Grubic, Inc., associated with the West Pump Station Replacement Project in Chester County, Pennsylvania, under Northwestern Chester County Municipal Authority. The specification outlines requirements for automatic, float-operated combination air valves suitable for sewage service applications with pressure ratings of 2-250 psig and body construction of 316 stainless steel. Approved manufacturers include APCO Model ASU, ARI Model D-26, and H-TEC Model 990-00, with compliance required to AWWA C512 standards. The specification mandates pre-installation meetings convened minimum one week prior to work commencement, comprehensive submittal requirements including product data, shop drawings, manufacturer certificates, and quality control documentation, and field quality control testing to demonstrate operation without undue noise or vibration. The manufacturer's representative must provide on-site services for not less than one day for installation, inspection, startup, field testing, and personnel training, with equipment acceptance and final adjustments made under the representative's direction.

The specification requires manufacturers to maintain ISO 9001 certification and possess minimum three years of documented experience, with installers similarly requiring three years of experience and manufacturer approval. Materials must include 316 stainless steel for body and cover components, with float, seat, and trim of either 316 stainless steel or polypropylene, and Buna-N or manufacturer-recommended seals. A one-year manufacturer's warranty is required for all combination air valves. Shop inspection and testing of completed assemblies must be provided, with certificates of compliance submitted if the fabricator is approved by authorities having jurisdiction. All work must comply with related sections including hangers and supports for process piping and common requirements for process valves, with final installation certification from the equipment manufacturer's representative required prior to startup and testing.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
46 24 23 - Channel Sewage Grinders.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

40 05 78.29 – COMBINATION AIR VALVES FOR WASTEWATER SERVICE

Herbert, Rowland & Grubic, Inc. 40 05 78.29 - 1 000483.0450

SECTION 40 05 78.29 – COMBINATION AIR VALVES FOR WASTEWATER SERVICE

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Combination air valves for wastewater treatment facilities.

B. Related Requirements:

1. Section 40 05 07 – Hangers and Supports for Process Piping: Anchors and supports.

2. Section 40 05 51 – Common Requirements for Process Valves: Typical product and installation requirements for valves specified in this Section.

1.2 REFERENCE STANDARDS

A. American Water Works Association:

1. AWWA C512 - Air-Release, Air/Vacuum, and Combination Air Valves for

Waterworks Service.

B. ASME International:

1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and

250.

C. ASTM International:

1. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, Flanges, and

Pipe Fittings.

2. ASTM A536 - Standard Specification for Ductile Iron Castings.

D. International Organization for Standardization:

1. ISO 9001 - Quality Management Systems.

1.3 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate Work of this Section with installation of process piping.

1.4 PREINSTALLATION MEETINGS

A. Section 01 31 19 – Project Meetings: Requirements for pre-installation meeting.

B. Convene minimum one week prior to commencing Work of this Section.

1.5 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer catalog information.

Herbert, Rowland & Grubic, Inc. 40 05 78.29 - 2 000483.0450

C. Shop Drawings: Indicate materials, dimensions, weights, and end connections on assembly drawings.

D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

E. Manufacturer Instructions: Submit special procedures and setting dimensions.

F. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections.

G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

H. Manufacturer Reports: Certify that equipment has been installed according to manufacturer instructions.

I. Qualifications Statements:

1. Submit qualifications for manufacturer and installer.

2. Submit manufacturer's approval of installer.

1.6 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of combination air valves.

1.7 QUALITY ASSURANCE

A. Manufacturer Quality Management System: Certified to ISO 9001.

1.8 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience and approved by manufacturer.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

Herbert, Rowland & Grubic, Inc. 40 05 78.29 - 3 000483.0450

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Furnish temporary end caps and closures on piping and fittings and maintain in place until installation.

3. Provide additional protection according to manufacturer instructions.

1.10 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

1.11 WARRANTY

A. Section 01 78 36 – Execution and Closeout Requirements: Requirements for warranties.

B. Furnish one-year manufacturer's warranty for combination air valves.

PART 2 - PRODUCTS

2.1 COMBINATION AIR VALVES FOR WASTEWATER SERVICE

A. Manufacturers:

1. APCO, Model ASU.

2. ARI, Model D-26.

3. H-TEC, Model 990-00

4. Substitutions: As specified in Section 01 61 00 – Product Requirements.

B. Description:

1. Type:

a. Automatic, float operated.

b. Body: Single.

2. Comply with AWWA C512.

3. Size: As indicated on Drawings.

4. Suitable for sewage service.

5. Pressure Rating: 2-250 psig.

C. Materials:

1. Body and Cover: 316 Stainless Steel.

2. Float, Seat, and Trim: Type 316 Stainless Steel or polypropylene.

3. Seats: Buna-N or as recommended by manufacturer.

4. Seals: As recommended by manufacturer

D. Prepare piping appurtenances for field finishes as specified in Section 09 91 00 - Painting and Coating.

2.2 SOURCE QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for testing, inspection, and

Herbert, Rowland & Grubic, Inc. 40 05 78.29 - 4 000483.0450 analysis.

B. Provide shop inspection and testing of completed assembly.

C. Certificate of Compliance:

1. If fabricator is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at fabricator's facility conforms to Contract Documents.

2. Specified shop tests are not required for Work performed by approved fabricator.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

B. Verify that field dimensions are as indicated on Drawings.

C. Inspect existing flanges for nonstandard bolt hole configurations or design and verify that new pipe and flanges mate properly.

3.2 PREPARATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.

B. Thoroughly clean end connections before installation.

C. Close pipe and equipment openings with caps or plugs during installation.

D. Cleaning: Clean surfaces to remove foreign substances.

3.3 INSTALLATION

A. According to manufacturer instructions.

B. Provide access for operation, removal, and maintenance, and to avoid discharge to occupied areas or other equipment.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.

B. Inspect for interferences and proper supports.

C. Testing:

1. As specified in Section 40 05 51 – Common Requirements for Process Valves.

2. Demonstrate operation without undue noise or vibration.

D. Manufacturer Services: Furnish services of manufacturer's representative experienced in installation of products furnished under this Section for not less than 1 day on Site for

Herbert, Rowland & Grubic, Inc. 40 05 78.29 - 5 000483.0450 installation, inspection, startup, field testing, and instructing Owner's personnel in operation and maintenance of equipment.

E. Equipment Acceptance:

1. Adjust, repair, modify, or replace components failing to perform as specified and rerun tests.

2. Make final adjustments to equipment under direction of manufacturer's representative.

3. Repair damaged coatings with material equal to original coating.

F. Furnish installation certificate from equipment manufacturer's representative attesting that equipment has been properly installed and is ready for startup and testing.

3.5 CLEANING

A. Section 01 73 00 – Execution Requirements: Requirements for cleaning.

B. Keep interior of air release valves clean as installation progresses.

3.6 DEMONSTRATION

A. Section 01 73 00 – Execution Requirements: Requirements for demonstration and training.

B. Demonstrate equipment startup, shutdown, routine maintenance, and emergency repair procedures to Owner's personnel.

END OF SECTION 40 05 78.29