This is a technical specification document for ductile iron process pipe prepared by Herbert, Rowland & Grubic, Inc., applicable to the West Pump Station Replacement Project in Pennsylvania under the Northwestern Chester County Municipal Authority. The specification establishes requirements for ductile-iron pipe, malleable-iron, cast-iron fittings, and related accessories for the project's force main piping and sanitary sewer piping systems. The piping must comply with AWWA C115, C150, and C151 standards with a Thickness Class 53 rating and 250 psi pressure rating. Interior lining options include Protecto 401 or Tnemec Permashield 431, while buried service piping requires asphaltic coating at 0.04 inch thickness and exposed service piping follows painting specifications. Fittings must comply with AWWA C110 and C153 standards for ductile iron, with groove joints conforming to AWWA C606 and mechanical joints following AWWA C111. Gaskets must be suitable for sewage applications, specifically American Turoseal Flange Gaskets with no substitutions permitted, and bolts and nuts must be 316 stainless steel.
Installation requirements mandate compliance with ASME B31.3 for exposed service piping and Section 33 31 23 specifications for buried service piping, with all piping run straight along alignment with minimum joints. Field work includes surface preparation through commercial sand blasting to SSPC SP 6 standards, progressive bolt tightening using torque wrenches, proper slope installation for venting and draining, and support installation per Section 40 05 07. Manufacturers must have minimum three years of documented experience, submit certificates of compliance, and provide shop inspection and testing results. Quality control requires post-installation inspection for coating or lining damage, pressure testing as specified in Section 33 05 05.31, laying tolerances of 1/4 inch in 10 feet, and cleaning of pipe interior throughout installation and after completion.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40 05 19 – DUCTILE IRON PROCESS PIPE
Herbert, Rowland & Grubic, Inc. 40 05 19 - 1 000483.0450
SECTION 40 05 19 – DUCTILE IRON PROCESS PIPE
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Ductile-iron pipe.
2. Ductile-iron, malleable-iron, and cast-iron fittings.
3. Accessories.
B. Related Requirements:
1. Section 09 91 00 – Painting: Product and execution requirements for painting specified by this Section.
2. Section 33 05 05.31 – Hydrostatic Testing.
3. Section 33 31 23 – Sanitary Sewerage Force Main Piping.
4. Section 40 05 06 – Couplings, Adapters, and Specials for Process Piping: Piping appurtenances.
5. Section 40 05 07 – Hangers and Supports for Process Piping: Hangers, anchors, sleeves, and sealing of piping to adjacent structures.
6. Section 40 05 51 – Common Requirements for Process Valves: Common product requirements for valves for placement by this Section.
1.2 REFERENCE STANDARDS
A. American Water Works Association:
1. AWWA C110 - Ductile-Iron and Gray-Iron Fittings.
2. AWWA C111 - Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings.
3. AWWA C115 - Flanged Ductile-Iron Pipe with Ductile-Iron or Gray-Iron Threaded
Flanges.
4. AWWA C150 - Thickness Design of Ductile-Iron Pipe.
5. AWWA C151 - Ductile-Iron Pipe, Centrifugally Cast.
6. AWWA C153 - Ductile-Iron Compact Fittings.
7. AWWA C606 – Grooved and Shouldered Joints.
B. ASME International:
1. ASME B16.1 - Gray Iron Pipe Flanges and Flanged Fittings: Classes 25, 125, and
250.
2. ASME B31.3 - Process Piping.
C. ASTM International:
1. ASTM A48/A48M - Standard Specification for Gray Iron Castings.
D. Society for Protective Coatings:
1. SSPC SP 6 - Commercial Blast Cleaning.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 2 000483.0450
1.3 COORDINATION
A. Section 01 31 13 – Project Coordination: Requirements for coordination.
B. Coordinate Work of this Section with piping and equipment connections specified in other Sections and indicated on Drawings.
1.4 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information regarding pipe and fittings.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
D. Source Quality-Control Submittals: Indicate results of factory tests and inspections.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of piping, valves and other appurtenances, connections, and centerline elevations.
C. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.6 QUALITY ASSURANCE
A. Permanently mark each length of pipe with manufacturer's name or trademark and indicate conformance to standards.
1.7 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 3 000483.0450
2. Protect piping and appurtenances by storing off ground.
3. Provide additional protection according to manufacturer instructions.
1.9 EXISTING CONDITIONS
A. Field Measurements:
1. Verify field measurements prior to fabrication.
PART 2 - PRODUCTS
2.1 DUCTILE IRON PIPE AND FITTINGS
A. Piping:
1. Comply with AWWA C115, C150, C151.
2. Thickness Class: 53
3. Pressure Rating: 250 psi.
B. Fittings:
1. Material: AWWA C110, ductile iron and AWWA C153, ductile iron.
2. Pressure Rating: Same as that of connected piping.
3. Groove Joints: AWWA C606
4. Mechanical Joints:
a. Comply with AWWA C110 and AWWA C111.
b. Glands: Ductile iron with asphaltic coating.
c. Push-on Joints: Comply with AWWA C111.
5. Flanged Fittings: Comply with AWWA C110/ASME B16.1.
C. Interior Lining:
1. Protecto 401, Tnemec Permashield 431, or equal.
D. Outside Coating:
1. Buried Service:
a. Type: Asphaltic.
b. Thickness: 0.04 inch.
2. Exposed Service: As specified in Section 09 91 00 – Painting and Coating.
2.2 ACCESSORIES
A. Gaskets: Suitable for use with sewage.
1. Flange Gaskets: American Turoseal Flange Gasket. No Substitutes.
B. Bolts and Nuts: 316 Stainless steel.
2.3 SOURCE QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for testing, inspection, and analysis.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 4 000483.0450
B. Provide shop inspection and testing of completed assembly.
C. Certificate of Compliance:
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.
B. Verify that field dimensions are as indicated on Drawings.
C. Inspect existing flanges for nonstandard bolt hole configurations or design, and verify that new pipe and flange mate properly.
3.2 PREPARATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.
B. Thoroughly clean pipe and fittings before installation.
C. Surface Preparation:
1. Clean surfaces to remove loose rust, mill scale, and other foreign substances by power wire brushing or commercial sand blasting; SSPC SP 6 as determined by Engineer.
2. Touch up shop-primed surfaces with primer as specified in Section 09 91 00 - Painting and Coating.
3. Solvent-clean surfaces that are not shop primed.
3.3 INSTALLATION
A. Buried Service Piping: As specified in Section 33 31 23 – Sanitary Sewerage Force Main Piping.
B. Exposed Service Piping:
1. According to ASME B31.3.
2. Run piping straight along alignment as indicated on Drawings, with minimum number of joints.
C. Fittings:
1. According to manufacturer instructions.
2. Clean gasket seats thoroughly, and wipe gaskets clean prior to installation.
3. Tighten bolts progressively, drawing up bolts on opposite sides until bolts are uniformly tight; use torque wrench to tighten bolts to manufacturer instructions.
Herbert, Rowland & Grubic, Inc. 40 05 19 - 5 000483.0450
4. Provide required upstream and downstream clearances from devices as indicated on Drawings.
D. Make taps to ductile iron piping only with service saddle, tapping boss of a fitting or valve body, or equipment casting.
E. Install piping with sufficient slopes for venting or draining liquids and condensate to low points.
F. Support exposed piping as specified in Section 40 05 07 – Hangers and Supports for Process Piping.
G. Dielectric Fittings: Provide between dissimilar metals.
H. Field Cuts: According to pipe manufacturer instructions.
I. Finish primed surfaces according to Section 09 91 00 – Painting and Coating.
3.4 TOLERANCES
A. Section 01 40 00 – Quality Requirements: Requirements for tolerance.
B. Laying Tolerances: 1/4 inch in 10 feet.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.
B. Inspection:
1. Inspect for damage to pipe lining or coating and for other defects that may be detrimental as determined by Engineer.
2. Repair damaged piping or provide new, undamaged pipe.
3. After installation, inspect for proper supports and interferences.
C. Pressure Testing: As indicated in Section 33 05 05.31 – Hydrostatic Testing.
3.6 CLEANING
A. Section 01 73 00 – Execution Requirements specifies requirements for cleaning.
B. Keep pipe interior clean as installation progresses.
C. After installation, clean pipe interior of soil, grit, and other debris.
END OF SECTION 40 05 19