40 05 53 - Identification For Process Piping.pdf
PDF 474 KB Posted
- Attached to
- West Pump Station Replacement Project
- Solicitation number
- Not on record
- Issued by
- Chester County, Pennsylvania
About this file
This is a technical specification document for identification of process piping systems prepared by Herbert, Rowland & Grubic, Inc. for the Northwestern Chester County Municipal Authority's West Pump Station Replacement Project in Pennsylvania. The specification section 40 05 53 establishes requirements for pipe identification materials and installation methods, including stencils and plastic pipe markers that comply with ASME A13.1 standards. The scope covers factory-fabricated plastic pipe markers from manufacturers such as Seton Identification Products and Craftmark Pipe Markers, as well as stencil painting with semigloss enamel. Installation requirements mandate that piping identification be applied after completion of coverings and painting, with identification located no more than 20 feet apart on straight runs, adjacent to valves and tees, at structure penetrations, and at obstructions. Plastic markers must be installed with corrosion-resistant mechanical fasteners or adhesive, and underground markers must be placed 6 to 8 inches below finished grade directly above buried pipe. All materials must meet manufacturer specifications and be inspected upon delivery in original packaging, with storage in clean, dry locations protected from moisture and dust.
The specification requires manufacturer product data submissions, shop drawings indicating wording, symbols, letter sizes, and color-coding schemes, and manufacturer certificates verifying compliance with specified requirements. Contractors must convene a preinstallation meeting minimum one week prior to commencing work and submit maintenance materials including special crimpers and installation tools for owner use. Letter height requirements vary based on pipe outer diameter: 1/2-inch letters for pipes up to 2 inches OD, 1-inch letters for 2.5 to 6 inches OD, and 1.75-inch letters for pipes exceeding 6 inches OD. The specification mandates that manufacturers have a minimum of three years' documented experience in producing identification products, and all work must comply with Northwestern Chester County Municipal Authority standards and applicable reference standards outlined in related project sections.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40 05 53 – IDENTIFICATION FOR PROCESS PIPING
Herbert, Rowland & Grubic, Inc. 40 05 53 - 1 000483.0450
SECTION 40 05 53 – IDENTIFICATION FOR PROCESS PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Stencils.
2. Pipe markers.
B. Related Requirements:
1. Section 09 91 00 – Painting and Coating: Requirements for painting as specified by this Section.
1.2 REFERENCE STANDARDS
A. ASME International:
1. ASME A13.1 - Scheme for the Identification of Piping Systems.
1.3 PREINSTALLATION MEETINGS
A. Section 01 31 19 – Project Meetings: Requirements for preinstallation meeting.
B. Convene minimum one week prior to commencing Work of this Section.
1.4 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer's catalog literature for each specified product.
C. Shop Drawings:
1. Indicate list of wording, symbols, letter size, and color-coding for mechanical identification and valve chart and schedule.
2. Indicate valve tag number, location, function, and valve manufacturer's name and model number.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.
F. Qualifications Statement:
1. Submit qualifications for manufacturer.
1.5 CLOSEOUT SUBMITTALS
A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.
Herbert, Rowland & Grubic, Inc. 40 05 53 - 2 000483.0450
B. Project Record Documents: Record actual locations of tagged valves; include valve tag numbers.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Section 01 78 13 – Operations and Maintenance Manual Requirements: Requirements for maintenance materials.
B. Tools: Furnish special crimpers and other devices required for Owner to reinstall tags.
1.7 QUALITY ASSURANCE
A. Piping Color Scheme and Lettering Size: Comply with ASME A13.1.
B. Perform Work according to Northwestern Chester County Municipal Authority standards.
1.8 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
1.9 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
PART 2 - PRODUCTS
2.1 STENCILS
A. Description:
1. Quality: Clean-cut symbols.
2. Letters:
a. Up to 2-Inch OD of Insulation or Pipe: 1/2-inch-high letters.
b. 2-1/2- to 6-Inch OD of Insulation or Pipe: 1-inch-high letters.
c. More Than 6-Inch OD of Insulation or Pipe: 1-3/4-inch high letters.
B. Stencil Paint:
1. Description: Semigloss enamel.
2. As specified in Section 09 91 00 – Painting and Coating.
Herbert, Rowland & Grubic, Inc. 40 05 53 - 3 000483.0450
2.2 PIPE MARKERS
A. Plastic Pipe Markers:
1. Manufacturers:
a. Seton Identification Products
b. Craftmark Pipe Markers
c. Substitutions: Section 01 61 00 – Product Requirements.
2. Description:
a. Factory-fabricated, flexible, and semi-rigid plastic.
b. Preformed to fit around pipe or pipe covering.
c. Larger sizes may be of maximum sheet size, with spring fastener.
B. Plastic Tape Pipe Markers:
1. Description: Flexible, vinyl film tape with pressure-sensitive adhesive backing and printed markings.
PART 3 - EXECUTION
3.1 PREPARATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.
B. Degrease and clean surfaces to receive adhesive for identification materials.
C. Stencil Painting: Prepare surfaces as specified in Section 09 91 00 – Painting and Coating.
3.2 INSTALLATION
A. According to manufacturer instructions.
B. Apply stencil painting as specified in Section 09 91 00 – Painting and Coating.
C. Install identifying devices after completion of coverings and painting.
D. Install plastic nameplates with corrosion-resistant mechanical fasteners or adhesive.
E. Labels:
1. Install labels with sufficient adhesive for permanent adhesion and seal with clear lacquer.
2. For unfinished covering, apply paint primer before applying labels.
F. Install underground plastic pipe markers 6 to 8 inches below finished grade, directly above buried pipe.
G. Piping:
1. Identify piping, concealed or exposed, with plastic pipe markers, or stenciled painting.
2. Identify service, flow direction, and pressure.
3. Install in clear view and align with axis of piping.
Herbert, Rowland & Grubic, Inc. 40 05 53 - 4 000483.0450
4. Locate identification not to exceed 20 feet on straight runs, including risers and drops, adjacent to each valve and tee, at each side of penetration of structure or enclosure, and at each obstruction.
END OF SECTION 40 05 53