32 91 19 - Landscape Grading.pdf

PDF 464 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a technical specification document for landscape grading work prepared by Herbert, Rowland & Grubic, Inc., associated with the West Pump Station Replacement Project being administered by the Northwestern Chester County Municipal Authority in Pennsylvania. The specification covers final grade topsoil preparation for finish landscaping as part of the broader pump station construction project. The work includes placing topsoil to a minimum nominal depth of 4 inches in areas where seeding is required, fine grading to eliminate rough or low areas, removing debris and foreign materials, and lightly compacting placed topsoil. Substrate preparation requires scarification to a depth of 3 inches where topsoil is scheduled, elimination of uneven areas and low spots, and removal of debris, roots, branches, and stones exceeding 1/2 inch in size. The specification establishes a tolerance of plus or minus 1/2 inch for the top of topsoil and prohibits construction traffic over completed topsoil work.

The specification requires that topsoil materials be sourced from a single supplier throughout the work and that manufacturers provide certificates verifying products meet or exceed specified requirements. Materials must comply with standards outlined in Section 31 05 13 - Soils for Earthwork. All topsoil placement must occur during dry weather, with manual spreading required in areas near buildings, utilities, and pavement to prevent damage. The document cross-references related specifications for trenching backfilling, building area backfilling, and seeding, indicating this landscape grading work is one component of the larger pump station replacement project. Bidding for the overall project was scheduled to close on May 20, 2026, with three separate contracts available: WPS-1 for General Construction, WPS-2 for Electrical Construction, and WPS-3 for Mechanical Construction, all on a lump sum basis.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
46 24 23 - Channel Sewage Grinders.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 91 19 – LANDSCAPE GRADING

Herbert, Rowland & Grubic, Inc. 32 91 19 - 1 000483.0450

SECTION 32 91 19 – LANDSCAPE GRADING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Final grade topsoil for finish landscaping.

B. Related Sections:

1. Section 31 05 13 – Soils for Earthwork.

2. Section 31 22 13 – Rough Grading: Site contouring.

3. Section 31 23 16.13 – Trenching: Backfilling trenches.

4. Section 31 23 23 – Fill: Backfilling at building areas.

5. Section 32 92 19 – Seeding.

1.2 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Submittal procedures

B. Materials Source: Submit name of imported materials source.

C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.3 QUALITY ASSURANCE

A. Furnish each topsoil material from single source throughout the Work.

PART 2 - PRODUCTS

2.1 MATERIAL

A. Topsoil: As specified in Section 31 05 13.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 31 13 – Execution Requirements: Verification of existing conditions before starting work.

B. Verify building and trench backfilling have been inspected.

C. Verify substrate base has been contoured and compacted.

3.2 PREPARATION

A. Protect landscaping and other features remaining as final Work.

32 91 19 – LANDSCAPE GRADING

Herbert, Rowland & Grubic, Inc. 32 91 19 - 2 000483.0450

B. Protect existing structures, fences, utilities, and paving.

3.3 SUBSTRATE PREPARATION

A. Eliminate uneven areas and low spots.

B. Remove debris, roots, branches, stones, in excess of 1/2 inch in size. Remove contaminated subsoil.

C. Scarify surface to depth of 3 inches where topsoil is scheduled. Scarify in areas where equipment used for hauling and spreading topsoil has compacted subsoil.

3.4 PLACING TOPSOIL

A. Place topsoil in areas where seeding is required to a minimum nominal depth of 4 inches.

Place topsoil during dry weather.

B. Fine grade topsoil to eliminate rough or low areas. Maintain profiles and contour of subgrade.

C. Remove roots, weeds, rocks, and foreign material while spreading.

D. Manually spread topsoil close to building, utilities, and pavement to prevent damage.

E. Lightly compact placed topsoil.

F. Remove surplus subsoil from site.

3.5 TOLERANCES

A. Section 01 40 00 – Quality Requirements: Tolerances.

B. Top of Topsoil: Plus or minus 1/2 inch.

3.6 PROTECTION OF INSTALLED WORK

A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.

B. Prohibit construction traffic over topsoil.

END OF SECTION 32 91 19