This is a specification document for aggregates for earthwork prepared by Herbert, Rowland & Grubic, Inc., applicable to the West Pump Station Replacement Project being conducted by the Northwestern Chester County Municipal Authority in Pennsylvania. The specification document outlines requirements for coarse and fine aggregate materials to be used in the project's earthwork, fill, and grading operations. Coarse aggregate materials specified include PennDOT 2A, AASHTO No. 57, AASHTO No. 8, AASHTO No. 3, and Select Granular Material (2RC), all meeting PennDOT Publication 408 standards. Fine aggregate materials include bituminous concrete sand types, mortar sand, and filler materials with specific sieve size gradations detailed in a comprehensive table. The document references related sections for soils, grading, trenching, fill work, and sanitary sewerage piping that coordinate with this specification. Bidding for the West Pump Station Replacement Project was scheduled to close on Wednesday, May 20, 2026 at 10:00 AM local time, with separate contracts for General Construction (WPS-1), Electrical Construction (WPS-2), and Mechanical Construction (WPS-3) on a lump sum basis.
The specification requires that all aggregate materials originate from PennDOT-approved sources and conform to standards established by PennDOT Publication 408, AASHTO, and ASTM International. Materials must be furnished from a single source throughout the work, with samples submitted to the testing laboratory as required by the Engineer. Contractors must stockpile materials at designated on-site locations in sufficient quantities to meet project schedules, maintaining separation between different aggregate types to prevent mixing and managing surface water to prevent erosion or deterioration. Upon project completion, all stockpile areas must be cleaned and graded to eliminate standing water. The document specifies submittal requirements including material sources, manufacturer's certificates, and test results to verify that products meet or exceed specified requirements prior to incorporation into the work.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 05 16 – AGGREGATES FOR EARTHWORK
Herbert, Rowland & Grubic, Inc. 31 05 16 - 1 000483.0450
SECTION 31 05 16 – AGGREGATES FOR EARTHWORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Coarse aggregate materials.
2. Fine aggregate materials.
B. Related Sections:
1. Section 31 05 13 – Soils for Earthwork: Fill and grading materials.
2. Section 31 22 13 – Rough Grading.
3. Section 31 23 16.13 – Trenching.
4. Section 31 23 23 – Fill.
5. Section 32 91 19 – Landscape Grading.
6. Section 33 05 61 – Concrete Manholes.
7. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping.
8. Section 33 31 23 – Sanitary Sewerage Force Main Piping.
1.2 REFERENCES
A. Pennsylvania Department of Transportation (PennDOT)
1. American Association Publication 19 – Field and Laboratory Test Methods, latest edition.
2. Publication 408 - Specifications, latest edition, as amended.
B. of State Highway and Transportation Officials:
1. AASHTO M147 - Standard Specification for Materials for Aggregate and Soil-
Aggregate Subbase, Base and Surface Courses.
2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils
Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
C. ASTM International:
1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse
Aggregates.
2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of
Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).
3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).
4. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified
Soil Classification System).
5. ASTM D4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity
Index of Soils.
1.3 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
Herbert, Rowland & Grubic, Inc. 31 05 16 - 2 000483.0450
B. Samples: Submit, in air-tight containers, 10 lb. sample of each type of fill to testing laboratory, when required by Engineer.
C. Materials Source: Submit name of imported materials suppliers.
D. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.4 QUALITY ASSURANCE
A. Furnish each aggregate material from single source throughout the Work.
B. All aggregate must originate from a source approved by PennDOT meeting according to PennDOT standards.
PART 2 - PRODUCTS
2.1 COARSE AGGREGATE MATERIALS
A. PennDOT 2A: consisting of naturally or artificially graded mixture of natural or crushed gravel, crushed stone, or crushed slag meeting the requirements of PennDOT Publication 408, Section 703.2 for No. 2A, type C.
B. AASHTO No. 57: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 57.
C. AASHTO No. 8: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 8.
D. AASHTO No. 3: Open-graded, free-draining coarse aggregate meeting the requirements of PennDOT Publication 408, Section 703.2 for AASHTO No. 3.
E. Select Granular Material: Select Granular Material conforming to PennDOT Publication 408 Section 703.3 for 2RC.
2.2 FINE AGGREGATE MATERIALS
A. Fine Aggregates: Conforming to PennDOT’s standards as follows:
Bituminous Concrete Sand Type B
Mortar Sand
Sieve Size #1 #3 Filler Type C 3/8 inch 100 100 -- -- No. 4 95-100 80-100 -- 100 No. 8 70-100 65-100 -- 95-100 No. 16 40-80 40-80 -- -- No. 30 20-65 20-65 100 -- No. 50 7-40 7-40 95-100 -- No. 100 2-20 2-20 90-100 0-25 No. 200 0-10 0-10 70-100 0-10
Herbert, Rowland & Grubic, Inc. 31 05 16 - 3 000483.0450
PART 3 - EXECUTION
3.1 STOCKPILING
A. Stockpile materials on site at locations.
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
C. Separate different aggregate materials with dividers or stockpile individually to prevent mixing.
D. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.
3.2 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
END OF SECTION 31 05 16