About this file
This is a technical specification document for soils used in exterior improvements, prepared by Herbert, Rowland & Grubic, Inc., for a Pennsylvania-based construction project. The specification establishes requirements for subsoil and topsoil materials to be excavated, stockpiled, and utilized during site work. Subsoil materials include suitable backfill and embankment material, clean fill, granular material, shale, rock, and random material combinations, with specific requirements for gradation, density, and liquid limits as defined by PennDOT and AASHTO standards. Topsoil materials must be unclassified and free of roots, rocks larger than one-half inch, subsoil, debris, and foreign matter. Materials must be sourced from a single supplier throughout the work and furnished with manufacturer's certificates confirming compliance with specified requirements. Stockpiling operations require separation of differing materials, a maximum height of 35 feet for topsoil, prevention of contamination and intermixing, and proper surface water drainage to prevent erosion.
The specification references multiple testing standards from PennDOT, AASHTO International, and ASTM International to verify material properties and compaction characteristics. Excavation procedures require stripping topsoil to full depth in designated areas, removing excess or non-compliant materials from the site, and maintaining sufficient stockpile quantities to meet the project schedule. Quality assurance provisions mandate that work be performed in accordance with PennDOT standards and that source quality control testing and inspection services be provided as outlined in Section 01 40 00. Upon completion, all stockpiles must be removed and the site left in clean condition with proper grading to prevent standing water. This specification applies to the West Pump Station Replacement Project for Northwestern Chester County Municipal Authority in Pennsylvania.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 05 13 – SOILS FOR EXTERIOR IMPROVEMENTS
Herbert, Rowland & Grubic, Inc. 32 05 13 - 1 000483.0450
SECTION 32 05 13 – SOILS FOR EXTERIOR IMPROVEMENTS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Subsoil materials.
2. Topsoil materials.
B. Related Sections:
1. Section 31 05 13 – Soils for Earthwork.
2. Section 31 22 13 – Rough Grading.
3. Section 31 23 16.13 – Trenching.
4. Section 31 23 23 – Fill.
5. Section 32 05 16 – Aggregates for Exterior Improvements.
6. Section 32 91 19 – Landscape Grading.
7. Document Geotechnical Engineering Report: Geotechnical report; bore hole locations and findings of subsurface materials.
1.2 REFERENCES
A. Pennsylvania Department of Transportation (PennDOT)
1. Publication 19 – Field and Laboratory Test Methods, latest edition.
2. Publication 408 - Specifications, latest edition, as amended.
B. American Association of State Highway and Transportation Officials:
1. AASHTO T89 - Standard Method of Test for Determining the Liquid Limit of Soils.
2. AASHTO T88 - Standard Method of Test for Particle Size Analysis of Soils.
3. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a
4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.
4. AASHTO T194 - Standard Method of Test for Determination of Organic Matter in Soils by
Wet Combustion.
C. ASTM International:
1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil
Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).
2. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil
Using Modified Effort (56,000 ft-lbf/ft3. (2,700 kN-m/m3).
3. ASTM D2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil
Classification System).
1.3 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Materials Source: Submit name of imported materials source.
Herbert, Rowland & Grubic, Inc. 32 05 13 - 2 000483.0450
C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.
1.4 QUALITY ASSURANCE
A. Furnish each subsoil and topsoil material from single source throughout the Work.
B. Perform Work in accordance with PennDOT standards standard.
PART 2 - PRODUCTS
2.1 SUBSOIL MATERIALS
A. Suitable Backfill and Embankment Material: Material of maximum size that can be readily placed in loose, 8-inch layers; conforming to the requirements below. Frozen material shall not be utilized.
1. Soil. Includes earth material with the following physical characteristics:
a. Gradation—More than 35% passing No. 200 sieve.
b. Minimum dry mass density—95 pounds per cubic foot determined according to
PennDOT PTM No. 106, Method B.
c. Maximum liquid limit—65, determined according to AASHTO T 89.
d. Plasticity index—Not less than liquid limit minus 30, determined according to
AASHTO T 90 for soils with liquid limits of 41 to 65.
2. Granular Material. Includes natural or synthetic mineral aggregates having 35% or less passing the No. 200 sieve.
3. Shale. Includes rock-like material formed by natural consolidation of mud, clay, silt, and fine sand; usually thinly laminated, comparatively soft, and easily split.
4. Rock. Includes natural material that cannot be excavated without blasting or using rippers; also boulders and detached stones of a size that cannot be readily placed and compacted in loose, 8-inch layers and having insufficient soil to fill the voids in each layer.
5. Random Material. Includes any accepted combination of the above classifications and may include concrete, brick, stone, or masonry units from demolition.
6. Suitable Material. Reasonably free of organic matter, coal or coal blossom, or other objectionable matter. Wet, dry, or frozen material may be suitable when dried, wetted, or thawed, respectively.
B. Clean Fill: Fill material consisting of soil, rock, stone, dredged material, used asphalt, and brick, block or concrete from construction and demolition activities. The evaluation of fill materials shall be in accordance with PA DEP’s “Clean Fill” regulations and procedures for determining whether material is clean or regulated.
2.2 TOPSOIL MATERIALS
A. Topsoil Type
1. Unclassified.
2. Free of roots, rocks larger than 1/2 inch, subsoil, debris, large weeds and foreign matter.
Herbert, Rowland & Grubic, Inc. 32 05 13 - 3 000483.0450
2.3 SOURCE QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Testing and Inspection Services Testing and analysis of soil material.
B. Furnish materials of each type from same source throughout the Work.
PART 3 - EXECUTION
3.1 EXCAVATION
A. Excavate subsoil and topsoil from areas designated. Strip topsoil to full depth of topsoil in designated areas.
B. Stockpile excavated material meeting requirements for subsoil materials and topsoil materials.
C. Remove excess excavated materials not intended for reuse, from site.
D. Remove excavated materials not meeting requirements from site.
3.2 STOCKPILING
A. Stockpile materials on site at locations indicated
B. Stockpile in sufficient quantities to meet Project schedule and requirements.
C. Separate differing materials with dividers or stockpile apart to prevent mixing.
D. Stockpile topsoil 35 feet high maximum.
E. Prevent intermixing of soil types or contamination.
F. Direct surface water away from stockpile site to prevent erosion or deterioration of materials.
3.3 STOCKPILE CLEANUP
A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water.
END OF SECTION 32 05 13