This is a painting specification section for the West Pump Station Replacement Project, a construction initiative by the Northwestern Chester County Municipal Authority in Pennsylvania. The specification covers surface preparation and field application of paints and coatings for the new suction lift style pump station and associated site improvements. The project requires comprehensive painting of all new surfaces throughout the facility, including exposed piping, mechanical equipment, structural steel, concrete and masonry surfaces, and miscellaneous metalwork. Painting work must comply with referenced standards from ASTM, ICRI, NACE, NPCA, and SSPC. Contractors must submit product data, manufacturer's technical information, paint label analysis, application instructions, and color samples for approval prior to commencing work. All painting must be coordinated with the general construction schedule to ensure proper sequencing after surface preparation and prior to equipment placement into service. Environmental conditions are strictly regulated, with painting prohibited during snow, rain, fog, mist, or when relative humidity exceeds 85 percent, and surface temperatures must remain between 50 and 95 degrees Fahrenheit during application and curing.

The specification details multiple coating systems based on substrate type, including designated finishes for galvanized metal, aluminum, copper, interior and exterior ferrous metal, ductile iron, concrete, masonry, wood, and concrete floors. Primary paint manufacturers specified are Tnemec Co., Inc. and Sherwin-Williams, with equivalent products from other manufacturers permitted subject to engineer approval. Surface preparation requirements vary by substrate type and include power washing, abrasive blasting to specified SSPC standards, chemical treatment, moisture testing, and rust removal. Dry film thickness specifications range from 2.0 to 8.0 mils depending on the coating system and substrate. The contractor is responsible for material compatibility between shop primers and field finish coats, must maintain proper drying times between successive coats, and is required to provide one gallon of each color and type to the owner upon completion. Field quality control provisions allow the engineer to conduct independent testing of paint materials at any time during the project, with non-compliant materials subject to removal and repainting at the contractor's expense. Final colors are to be selected by the owner and are not necessarily standard manufacturer colors.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
46 24 23 - Channel Sewage Grinders.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

09 91 00 – PAINTING

Herbert, Rowland & Grubic, Inc. 09 91 00 - 1 000483.0450

SECTION 09 91 00 – PAINTING

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Surface preparation and field application of paints and coatings.

1.02 REFERENCES

A. ASTM D16 – Definitions of Terms Relating to Paint, Varnish, Lacquer, and Related Products.

B. ASTM D2016 – Test Method for Moisture Content of Wood.

C. ASTM F-1869 – Standard Test Method for Measuring Moisture Vapor Emission Rate of

Concrete Subfloor Using Anhydrous Calcium Chloride.

D. ASTM F-2170 – Standard Test Method for Determining Relative Humidity in Concrete

Floor Slabs Using in situ Probes.

E. ICRI Guideline No. 03732 – Selecting and Specifying Concrete Surface Preparation for

Sealers, Coatings, and Polymer Overlays.

F. NACE (National Association of Corrosion Engineers) – Industrial Maintenance Painting.

G. NPCA (National Paint and Coatings Association) – Guide to U.S. Government Paint

Specifications.

H. SSPC (Steel Structures Painting Council) – Steel Structures Painting Manual.

1.03 DEFINITIONS

A. Conform to ASTM D16 for interpretation of terms used in this Section.

1.04 SUBMITTALS

A. Submit under provisions of Section 01 33 00 – Submittal Procedures.

B. Product Data: Submit manufacturer's technical information including paint label analysis and application instructions for each material proposed for use.

C. Samples: Submit samples of manufacturer's available paint colors for selection.

Herbert, Rowland & Grubic, Inc. 09 91 00 - 2 000483.0450

D. Manufacturer's Instructions: Indicate special surface preparation procedures and substrate conditions requiring special attention.

1.05 COORDINATION

A. Completely paint and finish all new surfaces throughout the project, including but not limited to all new exposed piping and mechanical equipment.

B. All finish coat paint materials must be compatible with shop or manufacturer’s prime coat materials.

C. No painting work shall be initiated until the item of equipment, materials, tankage, piping, or duct has satisfactorily passed the required testing.

1.06 FIELD SAMPLES

A. Provide field sample of paint under provisions of Section 01 40 00 – Quality Requirements when requested by Engineer.

B. Provide field sample on smooth plywood, 12 inches square, illustrating coating color, texture, and finish.

1.07 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, protect and handle products to site under provisions of Section 01 61 00 – Product Requirement.

B. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.

C. Container label to include Manufacturer's name, type of paint, brand name, lot number, brand code, Federal Specification number, contents by volume, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.

D. Store paint materials at minimum ambient temperature of 45 degrees F and a maximum of

90 degrees F, in ventilated area, and as required by Manufacturer's instructions.

E. Storage space shall be kept clean at all times. Every precaution shall be taken to avoid fire hazards.

1.08 PROJECT CONDITIONS

Herbert, Rowland & Grubic, Inc. 09 91 00 - 3 000483.0450

A. Environmental Requirements:

1. Adhere to manufacturer's data on air and surface temperature limits and relative humidity during application and curing of coatings.

2. Do not spray apply paint when wind velocity is above 15 mph.

3. Schedule coating work to avoid dust and airborne contaminants.

4. Apply exterior finishes during daylight hours only.

5. When painting in confined spaces, or because of unfavorable ambient conditions, longer drying times will be necessary.

6. Provide supplementary ventilation such as fans and blowers in confined or enclosed areas to carry off solvents during evaporation stage.

B. Existing Conditions:

1. Broom clean area before painting is started. Remove dirt and dust.

a. After painting operations begin, broom cleaning will not be allowed.

Clean only with commercial vacuum cleaning equipment.

1.09 SCHEDULING

A. Coordinate the field painting work to coincide with the Contractor’s Construction

Schedule.

B. Coordinate surface preparation operations with other work.

C. Schedule final paint coating applications to occur only after no further work is to be performed on structure surfaces and equipment surfaces. However, primer coatings may be applied to repaint surfaces where the paint manufacturer's primer maximum recoat time period will not be exceeded by the scheduling.

1.10 OPERATION AND MAINTENANCE DATA

A. Comply with the requirements of Section 01 73 00 – Execution Requirements and as follows:

1. Product name, number and technical data sheet.

2. Name, address and telephone number of manufacturer and local distributor.

3. Detailed procedures for routine maintenance and cleaning.

4. Detailed procedures for light repairs such as dents, scratches and staining.

1.11 WARRANTY

A. Warranty: Include coverage for bond to substrate and degradation of chemical

Herbert, Rowland & Grubic, Inc. 09 91 00 - 4 000483.0450 resistance.

1.12 EXTRA MATERIALS

A. Furnish under provisions of Section 01 73 00 – Execution Requirements.

B. Provide one gallon of each color and type to Owner.

C. Label each container with color, type, texture, and locations in addition to the

Manufacturer's label.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Paint materials listed in the Paint Schedule are products of Tnemec Co., Inc. and Sherwin-Williams unless otherwise noted.

B. Or equal products of other manufacturers may be used subject to approval.

2.02 MATERIALS

A. Coatings: Ready mixed, except field-catalyzed coatings. Process pigments to a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating;

good flow and brushing properties; capable of drying or curing free of streaks or sags.

B. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically indicated but required to achieve the finishes specified, of commercial quality.

C. Patching Materials: Latex filler.

D. Fastener Head Cover Materials: Latex filler.

E. Provide undercoat paint produced by same Manufacturer as finish coats. Use only thinners approved by paint manufacturer, and use only within recommended limits.

F. Chemical Paint Remover: Manufacturer's standard formulation for removing paint coatings from masonry, concrete, or metal.

G. Liquid Strippable Masking Agent: Manufacturer's standard liquid, film forming, strippable masking material for protecting glass and metal surfaces from damaging effect of cleaners and removers.

Herbert, Rowland & Grubic, Inc. 09 91 00 - 5 000483.0450

2.03 FINISHES

A. Refer to paint schedule at end of Section for surface finish schedule.

B. Colors to be selected by Owner; not necessarily manufacturer's standard colors. Refer to color schedule at end of Section and Contract Drawings.

PART 3 - EXECUTION

3.01 EXAMINATION

A. Verify site conditions are acceptable and ready to receive work.

B. Verify that surfaces are ready to receive work as instructed by the product manufacturer.

Verification by manufacturer’s representative.

C. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially affect proper application.

D. Starting of painting work will be construed as Contractor’s acceptance of surfaces and conditions within any particular area or associated with any equipment or product.

E. Test shop applied primer for compatibility with subsequent cover materials.

F. Allow new concrete and masonry to cure for 28 days before coating system is installed, unless otherwise recommended by the coating systems manufacturer.

G. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums, unless otherwise approved by the paint manufacturer:

1. Masonry, Concrete, and Concrete Unit Masonry: 12 percent.

H. Coating Moisture Testing: Test new concrete for moisture content after completing surface preparation. Moisture vapor emission and moisture content testing must conform with the requirements of ASTM F-1869 (Calcium Chloride Test) or ASTM F-2170- 02 (Relative Humidity Probe Test). Proceed with installation only after substrates have a maximum calcium chloride reading of 3 lbs/in2 or a relative humidity measurement reading less than 80%. If recorded values are greater, consult the coating systems manufacturer for recommended remediation.

3.02 SURFACE PREPARATION

A. Perform all preparation and cleaning procedures as specified and in strict accordance with

Herbert, Rowland & Grubic, Inc. 09 91 00 - 6 000483.0450 paint manufacturer's instructions for each particular substrate and atmospheric condition.

B. Remove hardware, hardware accessories, machined surfaces, plates, and similar items not to be finish painted, or provide surface applied protection prior to surface preparation and painting operations. Following completion of painting of each space or area, reinstall removed items by workmen skilled in the trades involved or remove applied protection, if applicable.

C. Clean sand, dirt, dust and all other foreign matter from surfaces to be painted before applying paint or surface treatments. Remove oil and grease with clean cloths and cleaning solvents prior to mechanical cleaning. Program cleaning and painting so that dust and other contaminants from cleaning process will not fall in wet, newly painted surfaces.

D. Prepare surfaces which were not shop painted or were improperly shop painted or damaged, and all abraded or rusted surfaces, which are to be painted, as specified for the appropriate condition under this Section.

E. Apply prime coat to any prepared surface within 24 hours and before rust bloom develops.

F. Primed surfaces, exposed to sunlight for 60 days or more, must be scarified by lightly sanding or whip blasting to assure proper adhesion of final coat(s).

G. If there is a time period in excess of five (5) months from application of a shop or field primer coat to proposed date to apply the first field finished coat, first field finished coat will not be applied. Instead, blast clean primer completely off to obtain the SSPC-SP surface specified for particular application in Painting Systems. Then, reapply primer and finish paint as specified. Cost of removing primer by blast cleaning and reapplying primer will be at no expense to Owner.

H. Terminate shop prime coats on steel six inches from edges that are to be field welded.

I. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions otherwise detrimental to formation of a durable paint film.

J. Correct defects and clean surfaces that affect work of this section. Remove existing coatings that exhibit loose surface defects.

K. Seal with shellac and seal marks which may bleed through surface finishes.

L. Steel (Non-Galvanized) – Structural Steel Members, Pipe Supports

1. Power wash surface to remove dirt, dust, oil, grease and all other foreign matter.

Herbert, Rowland & Grubic, Inc. 09 91 00 - 7 000483.0450

All rusted areas are to be cleaned with SSPC-SP11 Power Tool Cleaning to Bare Metal and feather smooth the edges of the spot cleaned areas.

2. Brush off abrasive blast or mechanically abrade surface to create surface profile for the coating system to adhere to.

3. Surface must be clean and dry prior to painting.

M. Ferrous Metal

1. Power wash surface to remove dirt, dust, oil, grease and all other foreign matter.

All rusted areas are to be cleaned with SSPC-SP11 Power Tool Cleaning to Bare Metal and feather smooth the edges of the spot cleaned areas.

2. Brush off abrasive blast or mechanically abrade surface to create surface profile for the coating system to adhere to.

3. Surface must be clean and dry prior to painting.

N. Ductile Iron (DI)

1. Power wash surface to remove dirt, dust, oil, grease and all other foreign matter.

All rusted areas are to be cleaned with SSPC-SP11 Power Tool Cleaning to Bare Metal and feather smooth the edges of the spot cleaned areas.

2. Brush off abrasive blast or mechanically abrade surface to create surface profile for the coating system to adhere to. Comply with NAPF 500-03-04 – Abrasive Blast Cleaning of Ductile Iron Pipe.

3. Surface must be clean and dry prior to painting.

O. Copper, Galvanized or Aluminum

1. SSPC-SP1 to remove all soluable contaminants. Prepare in accordance with SSPC

SP 16 "Brush-off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-ferrous Metals" to remove insoluble contaminants such as zinc oxides and to create a surface profile in the existing surface for the new coating system to adhere to.

2. Surface must be clean and dry prior to painting.

P. Polyvinyl Chloride Pipe

1. Lightly sand off sheen and clean.

2. Remove dust and sand by wiping with a dry cloth.

Q. Exposed Tar Coated Pipes and Fittings: All exposed or nonsubmerged piping and fittings which are tar coated and which are to be painted shall receive two coats of a synthetic alcohol-soluble resin sealer prior to applying finish coats.

R. Galvanized Surfaces: Remove surface contamination and oils and wash with solvent.

Prepare in accordance with SSPC SP 16 "Brush-off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-ferrous Metals"

Herbert, Rowland & Grubic, Inc. 09 91 00 - 8 000483.0450

S. Concrete and Unit Masonry Surfaces Scheduled to Receive Paint Finish: Remove dirt, loose mortar, scale, salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of tri-sodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry.

T. Wood:

1. Surfaces must be dry and sanded to a smooth, even finish and wiped clean of dust.

2. Seal knots with two (2) coats of shellac.

3. Fill nail holes and other defects with wood filler similar to DAP No. 33 after prime coat has dried. Use color matched putty to fill holes and defects on clear finished wood.

3.03 MATERIALS PREPARATION

A. Mix and prepare painting materials in strict accordance with manufacturer's directions.

B. Do not mix coating materials produced by different manufacturers.

C. Store materials not in actual use in tightly covered containers. Maintain containers used in storage, mixing, and application of paint in a clean condition, free of foreign materials and residue.

D. Stir all materials before application to produce a mixture of uniform density, and as required during application of materials. Do not stir any film which may form on surface into material. Remove film and, if necessary, strain material before using.

E. If material has thickened or must be diluted for application, buildup coating to same film thickness achieved with undiluted material. Do not use thinner to extend coverage of paint.

F. Paint all exposed surfaces, except where natural finish of material is specifically noted as a surface not to be painted. See Part 3, Paint Schedule, for painting requirements.

G. Where items or surfaces are not specifically mentioned, paint these the same as adjacent similar materials or areas.

H. Do not paint the following:

1. Stainless steel, chromium plate, anodized aluminum and similar finished materials.

2. Aluminum, except where in contact with dissimilar materials.

3. Prefinished Items.

Herbert, Rowland & Grubic, Inc. 09 91 00 - 9 000483.0450

a. Unless otherwise shown or specified, factory finishing such as baked-on factory porcelain, polyvinylfluoride or other similar finish is specified for such items as, but not limited to, mechanical and electrical equipment such as instruments and distribution cabinets. Touch up factory finished items with paint supplied by the item manufacturer. As directed by Engineer, field paint damaged prefinished items or return them to the factory for repair and repainting.

b. Return to the factory, any prefinished item not having the specified type of paint or proper mil thickness for painting or have additional coats applied in the field.

4. Concealed Surfaces:

a. Unless otherwise shown or specified, nonmetallic wall or ceiling surfaces in concealed from view areas and generally inaccessible areas, such as pipe spaces, duct shafts, and above acoustical and plaster ceilings, do not require field painting as applicable to this Project.

b. Ducts, conduits and other materials with corrosion-resistant surfaces, not a paint, which are above finished ceilings, do not require field painting.

c. Structural and miscellaneous metals covered or concealed with an acoustical ceiling, plaster ceiling, fireproof insulation, concrete, masonry, or similar material will receive a primer, shop or field, compatible with the covering material before they are covered.

d. Field painting is not required for pipe and conduits in concealed from view areas, unless they are non-galvanized ferrous metal. Paint non-galvanized ferrous pipe and conduit in accordance with Painting Schedule. Label for identification all concealed from view pipe and conduits.

I. Operating Parts and Labels

1. Moving parts of operating units, mechanical and electrical parts, such as valve and damper operators, linkages, sensing devices, motor and fan shafts do not require finish painting unless otherwise specified.

2. Do not paint over any code-required labels, such as UL and Factory Mutual, or any equipment identification, performance rating, name, or nomenclature plates.

3. Remove all paint, coating or splatter inadvertently placed on these surfaces.

J. Review installation procedures under other Sections and coordinate the installation of items that must be field painted in this Section.

K. Provide finish coats which are compatible with the prime paints used. Review other

Sections of these Specifications in which prime paints are to be provided to ensure compatibility of the total coatings system for the various substrates. Contractor responsible for the compatibility of all shop primed and field painted items in this Contract. Furnish information on the characteristics of the finish materials proposed to

Herbert, Rowland & Grubic, Inc. 09 91 00 - 10 000483.0450 use, to ensure that compatible prime coats are used. As directed by the Engineer, provide barrier coats over incompatible primers or remove and reprime. Notify the Engineer in writing of anticipated problems using the coating systems as specified with substrates primed by others. This requirement does not apply to fully factory finished items. This is items having both primer and finish coatings except as specified in Painting Factory Finished Items paragraph.

L. Painting Factory-Finished Items: Equipment, such as motors, pumps and similar items, which when installed become an integral part of a system and which may be delivered fully factory-finished (that is, having finish coatings in addition to the prime coating) will not require repainting in the field unless the factory-finish is damaged. The Engineer will be the sole judge as to whether the items are to be touched-up or totally repainted.

1. When repainting factory-finished items perform the necessary surface preparation to profile the existing coating, apply a proper barrier coating if necessary, and then repaint the item in the finish system Scheduled for its installed location.

2. Factory finished building structure components, both exterior and interior and fully factory finished general construction products, appliances and panels will not require field painting. If the factory-finish is damaged, touch-up in accordance with each product manufacturer's recommendations.

3. Process equipment, including motors, pumps, controls, etc. as mounted thereon, furnished from the factory in a primer paint finish only will require field finishing in the proper finish versus location requirements as specified under the Paint Schedule. Where the process equipment manufacturer will furnish the equipment in a customer specific finish, comply with the proper finish versus location requirements as specified under the Paint Schedule.

M. Tinting:

1. Tint undercoats to match color of finish coat, but provide sufficient difference in shade of undercoats to distinguish each separate coat. Provide code number that identifies material tinted by manufacturer.

N. Protection:

1. Protect persons, motor vehicles, adjacent structures, and mechanical and electrical equipment surrounding surfaces from injury resulting from cleaning operations.

2. Prevent chemical cleaning solutions from coming into contact with persons, motor vehicles, landscaping, buildings, equipment, and other surfaces which could be injured by such contact.

3. Do not clean surfaces during winds of sufficient force to spread cleaning solutions to unprotected surfaces.

4. Dispose of runoff from cleaning operations by legal means and in a manner which prevents soil erosion, undermining of paving and foundations, damage to

Herbert, Rowland & Grubic, Inc. 09 91 00 - 11 000483.0450 landscaping, and water penetration into building interiors and process tanks, drains and vessels.

5. Erect temporary protection covers as required.

6. Provide adequate drainage and ventilation cleaning operations in buildings and treatment units.

7. Protect those surfaces not being painted both during and after the painting work, and protect adjacent work and materials from accidental drops, splashes over-spray, etc., using impervious material coverings.

8. Clean up and perform the remedial work necessary to restore surfaces damaged by misplaced paint and coatings.

9. Provide in-place protection for fully factory finished construction products, appliances, including lighting fixtures, fire detection systems, sprinkler heads, and prefinished building panels.

10. Provide DUST-TIGHT in-place protective coverings (masking where possible) to seal openings in items such as motors, controls, bearings and similar areas which may be damaged internally by the inclusion of debris and dust created by surface preparation operations.

11. Comply with recommendations of manufacturers of cleaners and removers for protecting surfaces against damage from exposure to their products.

12. Protect glass, unpainted metal trim and polished stone from contact with cleaners by covering them with liquid strippable masking agent or polyethylene film and waterproof masking tape. Apply masking agent to comply with manufacturer's recommendations. Do not apply liquid masking agent to painted or porous surfaces.

3.04 APPLICATION

A. Strictly follow paint manufacturer's label instructions for proper application, spreading rate and drying time.

B. Apply paint by brush, roller, or airless spray in accordance with manufacturer's directions, and recommendations of Paint Application Specifications No. 1 in SSPC Vol. 2, where applicable. Use brushes best suited for type of material being applied. Use rollers of carpet, velvet back, or high pile sheep's wool as recommended by paint manufacturer for material and texture required. Do not use rollers having nap exceeding 3/8-inch.

1. Apply by brush to newly welded seams.

2. Apply prime coats by roller, brush, or spray.

C. Apply paints only when temperature of surfaces to be painted and surrounding air temperatures are between 50 and 95 degrees F, and will remain in this range during curing, unless otherwise permitted by paint manufacturer's printed instructions.

D. Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85

Herbert, Rowland & Grubic, Inc. 09 91 00 - 12 000483.0450 percent; or to damp or wet surfaces.

E. Painting may be continued during inclement weather only if areas and surfaces to be painted are enclosed and heated within temperature limits specified by paint manufacturer during application and drying periods.

F. Provide adequate illumination and ventilation in areas where painting operations are in progress.

G. No substitutions will be considered that decrease film thickness, number of coats, surface preparation or generic type of coating specified. Furnish same color selection of substituted manufacturers as manufacturers specified, including accent colors in coating systems.

H. Maintain number of coats and minimum paint film thickness per coat required regardless of application method. Do not apply succeeding coats until previous coat has completely dried or the minimum time recommended by manufacturer elapsed, whichever is longer.

I. Apply additional coats when undercoats, stains, or other conditions show through the final coat of paint, and until paint film is of uniform finish, color and appearance. This requirement is of particular importance regarding intense primary accent colors. Ensure surfaces, including edges, corners, crevices, welds, and exposed fasteners receive a film thickness equivalent to that of flat surfaces.

J. Prime and paint insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports except where items are prefinished, with either: baked enamel, stainless steel, or aluminum.

K. Color code all pipelines and conduits. The exceptions are that flexible connectors, flexible tubing, stainless steel, uninsulated copper tubing, and valve operators and appurtenances are not painted.

1. Paint valves the same color as the pipeline. Exceptions are that brass, bronze, copper, stainless steel, PVC, valve operators, and any flexible portions of these pumps or valves are not be painted.

2. Surfaces not exposed to view do not require color coding and in some cases do not require painting. See Materials Preparation paragraph.

L. Paint interior surfaces of ducts, where visible through registers or grilles, with a flat, non-specular black paint as specified, before final installation of equipment.

1. Paint backs of access panels, and removable or hinged covers to match exposed surfaces.

2. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components and paint separately.

Herbert, Rowland & Grubic, Inc. 09 91 00 - 13 000483.0450

3. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces, unless otherwise specified.

4. Do not apply paint over sealants and caulking compounds until integral solvents have been released from compound. Conform to sealant and caulking manufacturer's recommendations.

5. Paint existing structural steel to match new structural steel.

6. Spray painting of sound-absorbing concrete masonry units containing sound insulation material is prohibited. This requirement prevents insulation material from being sprayed, resulting in a consequent loss of sound attenuation effectiveness. Apply paint on sound-absorbing masonry by rolling or brushing.

7. Sprayed Finishes: Spray paint finish doors, frames and windows, where required.

Brush or roller finishes will not be acceptable.

8. Install piping markers only after painting and finish work is completed.

M. Paint exposed conduit and electrical equipment same color as adjacent wall or ceiling.

N. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing equipment.

O. Minimum Coating Thickness: Apply each material at not less than the manufacturer's recommended spreading rate, and provide total dry film thickness as specified. In no case allow area coverage per gallon to exceed manufacturer's recommendations. Apply extra coat at no additional expense to obtain specified total dry film thickness.

P. Scheduling Painting:

1. Apply first-coat material to surfaces that have been cleaned, pretreated or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration.

a. Apply primers before rust bloom forms but in no case allow cleaned steel to be exposed for more than 24-hours.

2. Allow sufficient time between successive coatings to permit proper drying. Do not recoat until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and application of another coat of paint does not cause lifting or loss of adhesion of undercoat. In no case apply an additional coat until manufacturer's minimum recommended drying time between coats has elapsed.

Q. Prime Coats: Recoat primed and sealed walls and ceilings where there is evidence of suction spots or unsealed areas in first coat, to assure a finish coat with no burn-through or other defects caused by insufficient sealing.

R. Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no evidence of rolling such as laps, irregularities in texture, skid marks, or other surface

Herbert, Rowland & Grubic, Inc. 09 91 00 - 14 000483.0450 imperfections.

S. Pigmented (Opaque) Finishes: Completely cover to provide an opaque, smooth surface of uniform finish, color, appearance, and coverage.

T. Brush Application:

1. Brush-out and work all brush coats onto surfaces in an even film. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other surface imperfections are not acceptable. Neatly draw all glass and color break lines.

2. Brush apply all primer or first coats, unless otherwise permitted to use mechanical applicators.

U. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not in compliance with specified requirements as required by Engineer.

V. Placing Into Service: Where feasible, do not place painted items into service until paints and coatings are fully cured (dry-hard). Coordinate with painting manufacturer and Engineer items that must be placed into service prior to painting.

W. Pipe Line Identification: After finish painting, mark non-submerged piping in accordance with the following requirements:

1. Pipeline Finish Paint Color-Coding: Color-code the finish paint on pipelines to indicate the intended service and contents of each pipeline referenced below.

Contractor shall coordinate color selection with the Owner and Engineer.

2. After the pipe covering installation and painting are completed, install or apply pipe markers and flow identification arrows on each pipe.

3.05 PROTECTIVE PAINTING

A. Aluminum: Aluminum surfaces shall be prevented from direct contact with concrete, masonry, or dissimilar metals by one of the following methods:

1. Dissimilar metals, except white bronze, and solid zinc, shall be painted with a heavy brush or spray coat of zinc- chromate primer and one coat of aluminum paint; or shall be painted with one heavy brush coat of alkali-resistant bituminous paint; or shall be separated from the aluminum by a heavy coat of mastic caulking compound, or by a non-absorptive tape or gasket.

2. Dissimilar metals used in locations where drainage from those metals passes over

SERVICE LEGEND COLOR

Wastewater Wastewater Coordinate w/Owner

Herbert, Rowland & Grubic, Inc. 09 91 00 - 15 000483.0450 aluminum shall be painted to prevent staining of aluminum.

B. Copper:

1. Copper piping shall be prevented from direct contact with concrete surfaces with a complete coating of a coal tar epoxy.

2. For copper pipe penetrations through walls or floors or other concrete surfaces, the protective coating shall extend no less than 2 inches from the concrete surface.

3.06 FIELD QUALITY CONTROL

A. Engineer reserves right to invoke following material testing procedure at any time, and any number of times during the period of field painting:

1. Engage the service of an independent testing laboratory to sample any paint being used. Samples of materials delivered to Project site will be taken, identified and sealed, and certified in presence of Contractor.

2. Have independent testing laboratory perform appropriate tests for any or all of following characteristics: abrasion resistance, apparent reflectivity, flexibility, washability, absorption, accelerated weathering, dry opacity, accelerated yellowness, recoating, skinning, color retention, alkali resistance, quantitative materials analysis, and compatibility of coatings.

3. If test results show that material being used does not comply with specified requirements, a directive may be made, at no expense to Owner, to stop painting work and remove noncomplying paint; pay for testing; repaint surfaces coated with rejected paint; remove rejected paint from previously painted surfaces if, upon repainting with specified paint, the two (2) coatings are noncompatible.

3.07 CLEANING

A. During progress of Work, remove from site all discarded paint materials, rubbish, cans and rags at end of each work day.

B. Upon completion of painting work, clean paint-spattered surfaces. Remove spattered paint by proper methods of washing and scraping, using care not to scratch or otherwise damage finished surfaces.

C. Remove paint from existing structures, road surfaces, piping and other facilities which were not to be painted.

3.08 PROTECTION

A. Protect work of other trades against damage caused by painting and finishing work.

Correct damages by cleaning, removing paint splatter, repairing or replacing, and

Herbert, Rowland & Grubic, Inc. 09 91 00 - 16 000483.0450 repainting, as acceptable to Engineer.

B. Provide "Wet Paint" signs as required to protect newly painted finishes. Remove temporary protective wrappings provided after completion of painting operations.

C. Protect painted surfaces from damage. Touch up and restore damaged or defaced painted surfaces as determined by Engineer.

3.09 PAINT SCHEDULE

A. General Requirements: The Engineer will select the proper painting systems from the Paint Schedule (as well as color) for such surfaces, items, apparatus, materials and equipment, which are not specifically named in the Schedule, but requiring paint according to the Engineer's direction in the field. The anachronism 'dft' stands for dry film thickness.

B. Unless otherwise indicated on the Contract Drawings, the painting shall include all new surfaces installed as a part of this project, specifically including, but not necessarily limited to, the following items:

1. Pump Station

a. All interior exposed masonry surfaces and concrete surfaces.

b. All piping, valves, and appurtenances.

c. All structural steel (non-galvanized).

d. All miscellaneous metal work other than aluminum fabrications.

e. Dissimilar metals protection.

f. Protection of copper from concrete.

g. The omission of minor items not described herein shall not relieve the

Contractor of his obligation to include such items where they come within the general intent of these Specifications.

C. Galvanized Metal*.

D. Aluminum*.

E. Copper*.

*These surfaces shall be supplied with the following coating system:

Method A (Preferred)

1. Surface Preparation: SSPC-SP1 to remove all soluble contamination. SSPC- SP-16 “Brush-off Blast Cleaning of Coated and Uncoated Galvanized Steel, Stainless Steels, and Non-ferrous Metals”.

2. First Coat N69 Hi-Build Epoxoline 3.0 – 4.0

Herbert, Rowland & Grubic, Inc. 09 91 00 - 17 000483.0450

SW – Macropoxy 646 FC 3.0 – 4.0

3. Finish Coat Series 73 Endurashield 2.0 – 3.0 SW – Hi-Solids Polyurethane 2.0 – 3.0

Method B (Alternate method only when Method A is not feasible)

1. Surface Preparation: SSPC-SP1 to remove all soluble contamination. Hand or power tool clean to remove insoluble contaminants such as zinc oxides.

Chemically treat with one of the following products to etch the galvanized surface to be coated: Reference ASTM D6386-99 (2005) Section 5.4.2

a. Henkel Galvaprep 5

b. Clean & Etch by Great Lakes Laboratories

2. First Coat N69 Hi-Build Epoxoline 3.0 – 4.0 SW – Macropoxy 646 FC 3.0 – 4.0

3. Finish Coat Series 73 Endurashield 2.0 – 3.0 SW – Hi-Solids Polyurethane 2.0 – 3.0

F. Interior Exposed Masonry:

1. Filler Coat Series 130 at 60-80 square feet per gallon.

SW – Pro Industrial Heavy Duty Block Filler at 75-100 square feet per gallon.

2. First Coat: N69 Hi-Build Epoxoline 4.0 – 6.0 SW – Macropoxy646 4.0 – 6.0

3. Finish Coat: N69 Hi-Build Epoxoline 4.0 – 6.0 SW – Macropoxy646 4.0 – 6.0

G. Interior Exposed Concrete:

1. First Coat: N69 Hi-Build Epoxoline 4.0 – 6.0 SW – Macropoxy646 4.0 – 6.0

2. Finish Coat: N69 Hi-Build Epoxoline 4.0 – 6.0

H. Interior Non-Insulated, Non-Submerged Metal:

1. Surface Preparation SSPC-SP3 Power Tool Cleaning

2. Shop Prime Series 1 Omnithane 2.5 – 3.5

SW - Corothane I Mio-Aluminum 2.5 – 3.5

3. First Coat: N69 Hi-Build Epoxoline 4.0 – 6.0

SW – Macropoxy646 4.0 – 6.0

4. Finish Coat: N69 Hi-Build Epoxoline 4.0 – 6.0

I. Submerged Ferrous Metal

1. Surface Preparation SSPC-SP10 Near White Blast Cleaning

Herbert, Rowland & Grubic, Inc. 09 91 00 - 18 000483.0450

2. Shop Prime Series 1 Omnithane 2.5 – 3.5 SW - Corothane I Mio-Aluminum 2.5 – 3.5

3. Field First Coat N69 Hi-Build Epoxoline 4.0 – 6.0 SW – Macropoxy 646 4.0 – 6.0

4. Finish Coat N69 Hi-Build Epoxoline 4.0 – 6.0 SW – Macropoxy 646 4.0 – 6.0

J. Exterior Ferrous Metal

1. Surface Preparation SSPC-SP3 Power Tool Cleaning

2. Shop Prime Series 1 Omnithane 2.5 – 3.5

SW - Corothane I Mio-Aluminum 2.5 – 3.5

3. Field First Coat Series 73 Endurashield 3.0 – 4.0

SW – High Solid Polyurethane 3.0 – 4.0

4. Finish Coat Series 73 Endurashield 3.0 – 4.0

SW – High Solid Polyurethane 3.0 – 4.0

K. Exterior Ductile Iron

1. Surface Preparation NAPF 500-03-03 Power Tool Cleaning

2. Shop Prime Series 1 Omnithane 2.5 – 3.5

SW - Corothane I Mio-Aluminum 2.5 – 3.5

3. Field First Coat Series 73 Endurashield 3.0 – 4.0

SW – High Solid Polyurethane 3.0 – 4.0

4. Finish Coat Series 73 Endurashield 3.0 – 4.0

SW – High Solid Polyurethane 3.0 – 4.0

L. Ductile Iron

1. Surface Preparation NAPF 500-03-03 Power Tool Cleaning

2. First Coat 104 – H.S. Epoxy 4.0 – 6.0 SW – Dura-Plate 235 4.0 – 6.0

3. Finish Coat 104 – H.S. Epoxy 4.0 – 6.0 SW – Dura-Plate 235 4.0 – 6.0

M. Tar-Dipped Piping

1. Surface Preparation Surface shall be clean and dry

2. First Coat N69 Hi-Build Epoxoline 4.0 – 6.0 SW - Macropoxy 646 4.0 – 6.0

3. Finish Coat N69 Hi-Build Epoxoline 4.0 – 6.0 SW - Macropoxy 646 4.0 – 6.0

N. Interior Wood

1. Surface Preparation Abrasive Blast in accordance with SSPC – SP13

2. Primer: SW – ProCryl Acrylic Primer 2.0 - 3.0

3. First Coat: SW - Macropoxy 646 2.0 - 3.0

Herbert, Rowland & Grubic, Inc. 09 91 00 - 19 000483.0450

4. Finish Coat: SW Macropoxy 646 2.0 - 3.0

O. Interior Concrete Floor

1. Surface Preparation Prepare in accordance with SSPC – SP13, IRCI CSP 1-3

2. Resurfacer: Fill any cracks in floor with Tnemec Series 215 Surfacing Epoxy

3. Primer: Tnemec Series 288 Enviro-Pox (thinned 25%) 4.0 - 6.0

4. First Coat: Tnemec Series 288 Enviro-Pox 6.0 - 8.0

5. Finish Coat: Tnemec Series 248 Everthane 2.0 - 3.0 *Mix H&C Sharkgrip into Tnemec Series 248 finish coat to added slip resistant texture

P. Colors shall be selected by Owner.

END OF SECTION 09 91 00