This is a Work Change Directive Form template developed by Herbert, Rowland & Grubic, Inc. for use in the West Pump Station Replacement Project administered by the Northwestern Chester County Municipal Authority in Pennsylvania. The form serves as a mechanism for directing contractors to proceed with work modifications prior to final agreement on contract price and time adjustments. The directive accommodates changes necessitated by either non-agreement on pricing of proposed modifications or the need to proceed for schedule-related or other project reasons. The form allows for preliminary, non-binding estimates of changes to contract price (identified as increase, decrease, or not yet estimated) and contract time (measured in days with similar flexibility regarding direction of change). Supporting documentation for the change must be attached and the purpose for the modification clearly described.

The Work Change Directive Form requires authorization and approval signatures from the Engineer, Owner, and Funding Agency, with corresponding dates for each approval stage. The basis for determining changes in contract price may be established through lump sum arrangements, unit prices, cost of work, or other defined methods. This template is fundamental to contract administration and change management processes on the West Pump Station Replacement Project, which encompasses General Construction (Contract WPS-1), Electrical Construction (Contract WPS-2), and Mechanical Construction (Contract WPS-3) on a lump sum bid basis. Bids for the project were scheduled to close on May 20, 2026, at 10:00 AM local time through the PennBid platform.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
46 24 23 - Channel Sewage Grinders.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Herbert, Rowland & Grubic, Inc. 00 63 49 - 1 000483.0450

WORK CHANGE DIRECTIVE NO. [X]

Date of Issuance: Effective Date: [DATE EXECUTED BY OWNER]

Owner: Contract No.:

Contractor: Contract Name:

Engineer: HRG Project No.:

Project:

Contractor is directed to proceed promptly with the following change(s):

Description: [Description of the change to the Work]

Attachments: [List documents supporting change]

Purpose for Work Change Directive: [Describe the purpose for the change to the Work]

Directive to proceed promptly with the Work described herein, prior to agreeing to changes on Contract Price and Contract Time, is issued due to: NOTE - check one or both of the following

Non-agreement on pricing of proposed change Necessity to proceed for schedule or other Project reasons.

Estimated Change in Contract Price and Contract Times (non-binding, preliminary):

Contract Price: $ [increase] [decrease] [not yet estimated].

Contract Time: days [increase] [decrease] [not yet estimated].

Basis of determining change in Contract Price:

Lump Sum Unit Prices Cost of the Work Other

RECOMMENDED: AUTHORIZED BY: APPROVED (if applicable):

By: By: By:

Engineer (Authorized Signature) Owner (Authorized Signature) Funding Agency

Title: Title: Title:

Date: Date: Date:

File details come from the government source that posted it. Updated .