40-02212 Pipe Jack.pdf

PDF 126 KB Posted

Attached to
Route 54 Sanitary Sewer Extension Project
Solicitation number
Not on record
Issued by
Lycoming County, Pennsylvania

About this file

This specification document outlines pipe jacking and pipe boring requirements for the Route 54 Sanitary Sewer Extension Project, a state and local contract opportunity administered by the West Branch Regional Authority in Clinton Township, Lycoming County, Pennsylvania. The project encompasses approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing, and all required surface restoration and appurtenances. Sealed bids are due by 1:00 PM local prevailing time on Monday, February 16, 2026, and must be submitted online at http://pennbid.net/. Prospective bidders are urged to register as plan holders on PennBid to receive periodic updates, addenda, and project information. The contractor must obtain all necessary permits and provide proof of permit procurement to the Engineer prior to commencing work. A field supervisor with a minimum of twelve months' experience in boring equipment operation must be present at all times during work progression, and the boring machine operator must also possess at least twelve months' experience. Detailed submittals including boring pit locations, dimensions, sheeting and shoring details, equipment specifications, and pipe placement methods must be submitted at least forty-five days prior to boring initiation.

The contractor is responsible for all plant, labor, material, transportation, and equipment required for pipe boring operations and must comply with all applicable Pennsylvania Department of Transportation (PennDOT), Commonwealth, and Federal safety laws and regulations. Steel casing pipe shall be new, uncoated material manufactured in accordance with ASTM Specification A 252, Grade B with a minimum wall thickness of 0.344 inches and minimum yield strength of 35,000 psi, with all joints butt welded by certified welders. All bids must be accompanied by a certified or bank check or bid bond in the amount of ten percent (10%) of the total bid amount as security for proper execution of the Agreement. Work performed is subject to prevailing minimum project wage rates as established by the Pennsylvania Department of Labor and Industry. The contractor is also subject to the provisions of the Pennsylvania Steel Products Procurement Act of 1978, P.L. 6, as amended. The contractor assumes full responsibility and liability for all property damage and bodily injury resulting from damage to or disturbance of existing utilities, structures, powerlines, and other facilities, with verification of utility locations being solely the contractor's responsibility.

View the file

Other files

File Type Posted
63-REV 1.19.26 16000 Elect Gen Prov.pdf PDF
17-00700 Gen Cond.pdf PDF
31-01600 Mat and Equp.pdf PDF
4-00250 Experience Equipmt and Finan Stmt.pdf PDF
52-05900 Miscelanous Metals.pdf PDF
47-02820 Topsoil Seeding.pdf PDF
14-00660 Form Change Order No 1.pdf PDF
1-1 CD COVER.pdf PDF
36-02000 Site Wrk.pdf PDF
42-02310 Horizontal DD.pdf PDF
7-00630 Public Verification Form.pdf PDF
26-01340 Shop Draw.pdf PDF
70-REV 1.19.26 16402 Underground Construction.pdf PDF
27-01380 Construct Photos.pdf PDF
50-03200 Concrete Reinforcement.pdf PDF
11-00610 Release of Lien.pdf PDF
32-01700 Cont Close.pdf PDF
24-01090 Ref Stand.pdf PDF
8-00350 Non-Discrimination.pdf PDF
66-REV 1.19.26 16130 Boxes.pdf PDF
56-15015 NonPress PVC.pdf PDF
30-01570 Traffic Reg.pdf PDF
38-02110 Demolition.pdf PDF
69-REV 1.19.26 16161 Grounding.pdf PDF
60-15100 Basic Req Plumb Wrk.pdf PDF
10-00600 Bonding Forms.pdf PDF
34-01720 Proj Rec Doc.pdf PDF
67-REV 1.19.26 16140 Wiring Devices.pdf PDF
64-REV 1.19.26 16111 Conduit.pdf PDF
44-02600 Paving Surface.pdf PDF
53-09900 Painting.pdf PDF
48-02900 Landscaping.pdf PDF
46-02710 Chain Link Fence.pdf PDF
62-15136 Basic Pip Mat and Meth.pdf PDF
5-00300 Bid Form.pdf PDF
61-15115 Supp and Anchors.pdf PDF
35-01740 Warranty and Bonds.pdf PDF
3-00200 Instructions to Bidders.pdf PDF
51-03300 Cast in Place.pdf PDF
37-02102 Clear Grub.pdf PDF
58-2 TOC.pdf PDF
21-01000 Summ of Work.pdf PDF
18-00800 Supp Cond.pdf PDF
45-02607 Manholes.pdf PDF
55-11930 Pump Equp.pdf PDF
71-REV 1.19.26 16511 Led Exterior Lighting.pdf PDF
19-Wage Rates.pdf PDF
68-REV 1.19.26 16160 Panelboards.pdf PDF
41-02300 HDPE Pipe.pdf PDF
15-00670 Payment Application.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02212

PIPE JACKING/PIPE BORING DIVISION 2

West Branch Regional Authority 02212-1 January 2026 Route 54 Sanitary Sewer Extension Project Pipe Jacking/Pipe Boring Contract No. WB-1

PART 1 - GENERAL

1.01 DESCRIPTION OF WORK

A. Scope

1. The work covered under this section shall consist of providing all plant, labor, and material required to perform the Pipe Jacking/Pipe Boring, as set forth on the Drawings and in accordance with this section of the Specifications.

B. Related Work Specified Elsewhere in Contract Documents:

1. Section 02000: Sitework General Provisions

2. Section 02102: Clearing and Grubbing

3. Section 02205: Earthwork for Pipelines

4. Section 02541: Soil Erosion and Sedimentation Control

5. Appendix No. 1 - Standard Specifications for Extensions of and Connections to the West Branch Regional Authority Sanitary Sewer System, April 2014

6. Appendix No. 2 - NPDES General Permit for Discharge of Runoff During

Construction

7. Appendix No. 3 - Subsurface Soil Exploration Memorandum For Route 54 Sanitary Sewer Extension Project

1.02 SAFETY CONSIDERATIONS

A. The Contractor shall comply with all applicable, local, State, and Federal safety laws, codes, and regulations.

B. The Contractor will assume full responsibility and liability for all property damage and bodily injury that may result from him damaging or disturbing any equipment, utilities, structures, powerlines, water and drain lines, or other facilities.

C. The Contractor's attention is directed to the fact that there are existing sewer pipes, storm sewers, and other utilities within the Project area. An attempt has been made to indicate the location of these utilities on the Drawings, but the completeness or accuracy of the information provided is not guaranteed. Verification of utilities and their locations shall be the sole responsibility of the Contractor.

1.03 QUALITY ASSURANCE

A. Regulations, Standards, Codes, Permits, and Certifications

1. The Contractor will procure all necessary permits, paying all associated costs, and shall furnish the Engineer with evidence of permit procurement prior to the

West Branch Regional Authority 02212-2 January 2026 commencement of the work.

2. Nothing contained in these Specifications or shown on the Drawings will be so construed as to conflict with any national, state, municipal, or local laws or regulations governing the installation of the work specified herein, and all such acts, ordinances, and regulations are hereby incorporated and made part of these Specifications. All such requirements will be satisfied by the Contractor at no additional cost to the Owner.

1.04 SUBMITTALS

A. General

1. The Contractor shall submit to the Engineer, at least twenty-eight (28) days prior to any pipe jacking/pipe boring, the following information:

a. Details of proposed jacking or boring pits shall be submitted showing locations, dimensions, and details of sheeting and shoring required.

b. Numbers and types of equipment to be used.

c. Selected method of pipe placement including complete details and information of the process.

B. Shop Drawings

1. Refer to requirements in Submittals: Section 01340: Shop Drawings, Product Data and Samples.

C. Operation and Maintenance Information

1. Refer to requirements in Section 01700: Contract Closeout.

D. Project Record Documents

1. Refer to requirements in Section 01720: Project Record Documents.

1.05 WARRANTY AND GUARANTEE

A. Refer to requirements in Section 00700: Standard General Conditions.

PART 2 - PRODUCTS

2.01 STEEL CASING PIPE

West Branch Regional Authority 02212-3 January 2026

Casing pipe shall be new, uncoated, steel pipe manufactured in accordance with ASTM Specification A 252, Grade B with a minimum wall thickness of 0.344 inches, a minimum yield strength of 35,000 psi and a diameter as shown in Appendix No. 1. All casing pipe joints shall be butt welded completely around the joint by a certified welder and in accordance with all applicable provisions of the American Welding Society and the American Water Works Association Specification C-206. The casing pipe shall be so constructed as to prevent leakage of any water from the casing throughout its length. The ends of the casing shall be sealed with the end seals as detailed on the Drawings so as to prevent the entrance of foreign material. Casing spacers as detailed on the Drawings shall be used to install the carrier pipe through the casing pipe.

PART 3 - EXECUTION

3.01 INSTALLATION METHOD

The Successful Bidder shall provide all plant, labor, material, transportation and equipment required to perform the pipe borings, as set forth on the Drawings and specified herein. The Successful Bidder shall comply with all applicable Pennsylvania Department of Transportation (PennDOT), local, Commonwealth and Federal safety laws, codes and regulations. The Successful Bidder shall comply with all of the applicable requirements of the PennDOT Regulations while working within PennDOT right-of-way. Protection of highway traffic and protective warning devices to protect PennDOT employees and the general public are the Successful Bidder’s responsibility.

The Successful Bidder shall notify the Local Government and PennDOT of the anticipated work schedule a minimum of seventy-two (72) hours prior to commencing any boring operations. The Successful Bidder shall not commence any work within PennDOT right-of-way without prior written approval from PennDOT.

All cranes, lifts, or other equipment that will be operated in the vicinity of electrification and power transmission facilities shall be electrically grounded as directed by PennDOT and the Local Government. The Successful Bidder shall exercise extreme caution and employ careful construction techniques adjacent to all electrical power transmission facilities. At all times when the boring work is progressing, a field supervisor for the boring work, with not less than twelve (12) months’ experience in the operation of the boring equipment being used, shall be present. The boring machine operator shall also have not less than twelve (12) months’ experience in the operation of the equipment being used.

At least forty-five (45) days prior to the initiation of boredom, the following information shall be submitted to the Engineer for review and approval by the Owner:

A. Details of the proposed boring pits shall be submitted showing locations, dimensions and details of the sheeting and shoring required.

B. Numbers and types of equipment to be used.

West Branch Regional Authority 02212-4 January 2026

C. Selected method of pipe placement including complete details and information concerning the process.

Boring shall consist of pushing the pipe into the fill with a boring auger rotating with the pipe to remove the spoil. When augers or similar devices are used for pipe placement, the front of the pipe shall be provided with an arrangement of mechanical devices that will positively prevent the auger and cutting head from leading the pipe so that there will be no unsupported excavation ahead of the pipe. The auger and cutting head arrangement shall be removable from within the pipe in the event an obstruction is encountered. The over-cut by the cutting head shall not exceed the outside diameter of the pipe by more than one-half (1/2”) inch. The face of the cutting head shall be arranged to provide reasonable obstruction to the free flow of soft or poor material. The use of water or other liquids to facilitate pipe emplacement and spoil removal is prohibited.

The Successful Bidder shall excavate and construct a boring pit of width and length as required for the specific boring. The Successful Bidder will be required to provide adequate protection of all existing utilities encountered. The Successful Bidder shall provide adequate timber sheeting/shoring on all the boring pits. All shoring must be in compliance will all Federal, Commonwealth and local safety requirements. When water is known or expected to be encountered, pumps of sufficient capacity to handle the groundwater flow shall be maintained at the boring site. The pumps shall be constantly attended and shall be operated on a twenty-four

(24) hour basis until the operation of the pumps can be safely halted. When dewatering, the Successful Bidder shall maintain close observation to detect any settlement or displacement of the embankment, roadway, tracks or other surface facilities. Spoil from the boring pit excavation shall be removed from the site to permit passage of traffic.

If an obstruction is encountered during installation of the pipe that stops the forward action of the pipe, and it becomes evident that it is impossible to advance the pipe, operations will cease, and the pipe shall be abandoned in place and completely filled with grout.

The Successful Bidder shall carefully install the sewer pipe through the casing pipe being sure to properly plug the end of the sewer pipe. Where the sewer pipe is installed across the area of the boring pit, the Successful Bidder shall backfill the bottom of the pit with suitable non-corrosive material by placing the material in six (6”) inch lifts and compacting the material by mechanical compaction equipment. The backfill material must be placed to minimum depth one (1’) foot higher than the flow line of the sewer pipe. The Successful Bidder will be required to provide the proper bedding for the sewer pipe and install the sewer pipe. Bored installations shall have a borehole essentially of the same diameter as the outside diameter of the casing pipe. If voids should develop or if the bored hole diameter is greater than the outside diameter of the casing pipe by more than one (1’) inch, grouting shall be employed to fill the voids.

The Successful Bidder shall be required to test those portions of the sewer pipe within the casing pipe, in accordance with the applicable specifications contained herein and as directed in the field by the Engineer, prior to backfilling any excavation required for the boring work. The boring pit shall

West Branch Regional Authority 02212-5 January 2026 be backfilled with material specified for the applicable surface condition. All spring shall remain in place.