This document contains a construction cost estimate breakdown and related federal contract opportunity. The construction cost estimate breakdown provides line item details for repair and renovation work required at Davis-Monthan Air Force Base, including repair of Hangar 136 and construction/renovation of Parachute Shop Facility 4824. The federal contract opportunity is a solicitation from the Department of the Air Force seeking a firm-fixed price design/build contract valued between $1 million to $5 million. The work consists of modifications to the hangar door of Building 136 at Davis-Monthan Air Force Base. The NAICS code is 238220 and it is set aside for HUBZone small businesses. The period of performance is 210 calendar days and interested firms must show evidence of bonding capability up to the project maximum. The primary point of contact is Christopher Raney and responses are due to the 355th Contracting Squadron by the date specified in the solicitation.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Sheet
CONSTRUCTION COST ESTIMATE BREAKDOWN (6 Jan 2020)
CONTRACTOR GOVERNMENT ESTIMATE ADDRESS
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | $0 | |||||||||
| Repair Hangar 136 for EC-37B | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| FBNV071475 | Davis-Monthan AFB, AZ | ||||||||||
| LINE | UNIT | MATERIAL | LABOR (INSTALLED) | OTHER | |||||||
| NO. | ITEM | OF | QUANTITY | UNIT | TOTAL | QUANTITY | AVERAGE | TOTAL | DIRECT | LINE | ADDITIVE |
| MEASURE | RATE | COST | TOTAL | BID ITEMS | |||||||
| (Equipment) | |||||||||||
| Summary | |||||||||||
| 1.0 | Division 1 - GENERAL REQUIREMENTS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 2.0 | Division 2 - EXISTING CONDITIONS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 3.0 | Division 3 - CONCRETE REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 4.0 | Division 4 - MASONRY REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 5.0 | Division 5 - METALS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 6.0 | Division 6 - WOOD, PLASTICS, & COMPOSITES REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 7.0 | Division 7 - THERMAL & MOISTURE PROTECTION REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 8.0 | Division 8 - OPENINGS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 9.0 | Division 9 - FINISHES REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 10.0 | Division 10 - SPECIALTIES REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 11.0 | Division 11 - EQUIPMENT REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 12.0 | Division 12 - FURNISHINGS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 13.0 | Division 13 - SPECIAL CONSTRUCTION REPAIR (HANGAR DOOR) | LS | 1 | $0.00 | $0 | $0 | |||||
| 14.0 | Division 14 - CONVEYING SYSTEMS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 15.0 | Division 21 - FIRE SUPPRESSION REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 16.0 | Division 22 - PLUMBING REPAIR (In Support of HVAC Upgrade) | LS | 1 | $0.00 | $0 | $0 | |||||
| 17.0 | Division 23 - HVAC (8,000 SF Administrative Area) | LS | 1 | $0.00 | $0 | $0 | |||||
| 18.0 | Division 25 - INTEGRATED AUTOMATION REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 19.0 | Division 26 - ELECTRICAL REPAIR (In Support of HVAC Upgrade) | LS | 1 | $0.00 | $0 | $0 | |||||
| 20.0 | Division 27 - COMMUNICATIONS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 21.0 | Division 28 - ELECTRONIC SAFETY AND SECURITY REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 22.0 | Division 31 - EARTHWORK RERAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 23.0 | Division 32 - EXTERIOR IMPROVEMENTS REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 24.0 | Division 33 - UTILITIES REPAIR | LS | 1 | $0.00 | $0 | $0 | |||||
| 25.0 | |||||||||||
| 26.0 | Division Summary Totals Overall Project | $0 | |||||||||
| 27.0 | |||||||||||
| 28.0 | Total Profit and Overhead | 0.0% | $0 | ||||||||
| 29.0 | |||||||||||
| 30.0 | Subtotal Total Overall Project w/ Total Profit and Overhead | $0 | |||||||||
| 31.0 | |||||||||||
| 32.0 | Total Overall Tax (%) | 0.0% | $0 | ||||||||
| 33.0 | |||||||||||
| 34.0 | Total Bond (%) | 0.0% | $0 | ||||||||
| 35.0 | |||||||||||
| 36.0 | TOTAL OVERALL PROJECT PRICE | $0 | |||||||||
| 37.0 | |||||||||||
| 38.0 | TOTAL PROJECT PRICE | $0 |
Blank AF0352
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS Bldg 4824
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | $0 | |||||||||
| Construct/Repair (Renovate) Parachute Shop, Fac 4824 | |||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||||||
| FBNV 120068 | Davis-Monthan AFB, AZ | ||||||||||
| LINE | UNIT | MATERIAL | LABOR (INSTALLED) | OTHER | |||||||
| NO. | ITEM | OF | QUANTITY | UNIT | TOTAL | QUANTITY | AVERAGE | TOTAL | DIRECT | LINE | ADDITIVE |
| MEASURE | RATE | COST | TOTAL | BID ITEMS | |||||||
| (Equipment) | |||||||||||
| Summary | |||||||||||
| 1.0 | Division 1 - GENERAL REQUIREMENTS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 2.0 | Division 1 - GENERAL REQUIREMENTS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 3.0 | Division 2 - EXISTING CONDITIONS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 4.0 | Division 2 - EXISTING CONDITIONS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 5.0 | Division 3 - CONCRETE CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 6.0 | Division 3 - CONCRETE RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 7.0 | Division 4 - MASONRY CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 8.0 | Division 4 - MASONRY RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 9.0 | Division 5 - METALS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 10.0 | Division 5 - METALS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 11.0 | Division 6 - WOOD, PLASTICS, & COMPOSITES CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 12.0 | Division 6 - WOOD, PLASTICS, & COMPOSITES RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 13.0 | Division 7 - THERMAL & MOISTURE PROTECTION CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 14.0 | Division 7 - THERMAL & MOISTURE PROTECTION RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 15.0 | Division 8 - OPENINGS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 16.0 | Division 8 - OPENINGS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 17.0 | Division 9 - FINISHES CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 18.0 | Division 9 - FINISHES RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 19.0 | Division 10 - SPECIALTIES CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 20.0 | Division 10 - SPECIALTIES RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 21.0 | Division 11 - EQUIPMENT CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 22.0 | Division 11 - EQUIPMENT RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 23.0 | Division 12 - FURNISHINGS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 24.0 | Division 12 - FURNISHINGS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 25.0 | Division 13 - SPECIAL CONSTRUCTION CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 26.0 | Division 13 - SPECIAL CONSTRUCTION RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 27.0 | Division 14 - CONVEYING SYSTEMS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 28.0 | Division 14 - CONVEYING SYSTEMS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 29.0 | Division 21 - FIRE SUPPRESSION CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 30.0 | Division 21 - FIRE SUPPRESSION RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 31.0 | Division 22 - PLUMBING CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 32.0 | Division 22 - PLUMBING RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 33.0 | Division 23 - HVAC CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 34.0 | Division 23 - HVAC RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 35.0 | Division 25 - INTEGRATED AUTOMATION CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 36.0 | Division 25 - INTEGRATED AUTOMATION RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 37.0 | Division 26 - ELECTRICAL CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 38.0 | Division 26 - ELECTRICAL RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 39.0 | Division 27 - COMMUNICATIONS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 40.0 | Division 27 - COMMUNICATIONS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 41.0 | Division 28 - ELECTRONIC SAFETY AND SECURITY CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 42.0 | Division 28 - ELECTRONIC SAFETY AND SECURITY RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 43.0 | Division 31 - EARTHWORK CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 44.0 | Division 31 - EARTHWORK RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 45.0 | Division 32 - EXTERIOR IMPROVEMENTS CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 46.0 | Division 32 - EXTERIOR IMPROVEMENTS RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 47.0 | Division 33 - UTILITIES CONSTRUCT | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 48.0 | Division 33 - UTILITIES RENOVATE | LS | 1 | $0 | 1 | $0 | $0 | ||||
| 49.0 | |||||||||||
| 50.0 | Division Summary Totals Overall Project | $0 | |||||||||
| 51.0 | Division Summary Totals Construction Portion | $0 | |||||||||
| 52.0 | Division Summary Totals Renovation Protion | $0 | |||||||||
| 53.0 | |||||||||||
| 54.0 | Total Overall Overhead (%) | 10.0% | $0 | ||||||||
| 55.0 | Total Construction Overhead (%) | 10.0% | $0 | ||||||||
| 56.0 | Total Renovation Overhead (%) | 10.0% | $0 | ||||||||
| 57.0 | |||||||||||
| 58.0 | Total Overall Profit (%) | 10.0% | $0 | ||||||||
| 59.0 | Total Construction Profit (%) | 10.0% | $0 | ||||||||
| 60.0 | Total Renovation Profit (%) | 10.0% | $0 | ||||||||
| 61.0 | |||||||||||
| 62.0 | Subtotal Overall w/ Overhead and Profit | $0 | |||||||||
| 63.0 | Subtotal Construction w/ Overhead and Profit | $0 | |||||||||
| 64.0 | Subtotal Renovation w/ Overhead and Profit | $0 | |||||||||
| 65.0 | |||||||||||
| 66.0 | Total Overall Tax (%) | 3.970% | $0 | ||||||||
| 67.0 | Total Construction Tax (%) | 3.970% | $0 | ||||||||
| 68.0 | Total Renovation Tax (%) | 3.970% | $0 | ||||||||
| 69.0 | |||||||||||
| 70.0 | Total Bond (%) | 2.0% | $0 | ||||||||
| 71.0 | Total Construction Bond (%) | 2.0% | $0 | ||||||||
| 72.0 | Total Renovation Bond (%) | 2.0% | $0 | ||||||||
| 73.0 | |||||||||||
| 74.0 | TOTAL OVERALL PROJECT PRICE | $0 | |||||||||
| 75.0 | TOTAL CONSTRUCTION PROJECT PRICE | $0 | |||||||||
| 76.0 | TOTAL RENOVATION PROJECT PRICE | $0 | |||||||||
| 77.0 | |||||||||||
| 78.0 | TOTAL PROJECT PRICE | $0 | |||||||||
| 79.0 | |||||||||||
| 80.0 | |||||||||||
| AF Form 3052, Jan 88 |
File details come from the government source that posted it. Updated .