FBNV 071475 – Repair Building 136
Solicitation number
FA487720R0018
Issued by

About this file

This solicitation is for a firm fixed price construction contract to repair Hangar 136 at Davis-Monthan Air Force Base in Tucson, Arizona. The work includes design/build services to modify the hangar door. The North American Industry Classification System code for this opportunity is 238220 for plumbing, heating and air conditioning contractors. The small business size standard is $16.5 million. The performance period for this project is 210 calendar days. Interested Hubzone small businesses must show evidence of bonding capacity up to $5 million. This procurement is set aside specifically for competitive bids from hubzone small businesses. The Department of the Air Force and Air Combat Command are the contracting agencies. Questions can be directed to the points of contact listed, Christopher Raney and Dave Harrison. Bids are due based on the submission instructions in the solicitation. The successful bidder will be selected based on having the lowest price and being deemed a responsible contractor according to Federal Acquisition Regulation 9.1.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

355TH CIVIL ENGINEER SQUADRON (ACC)

DAVIS-MONTHAN AIR FORCE BASE, ARIZONA

TRAIN – DEPLOY – WIN

RESCUE & ATTACK!

13 July 2020

MEMORANDUM FOR 355 CONS/PKA

FROM: 355 CES/CENMP

SUBJECT: Revision to Section 01011- Repair Hangar, Facility 136; FBNV 071475

1. Revision to Section 01011 addresses government RFI responses. Revision does not address all government RFI responses. Changes indicted with right side boarder mark. Brief description of changes are as follows:

a. Header date changed to 13 July 2020

b. Par 1.1 “replacement” added to hangar door requirement

c. Par 1.4.1 – Life cycle cost analysis omitted from project requirements.

d. Par 1.6.1/2/3/4/5/6. - UFC 4-211-01, Aircraft Maintenance Hangars added to references.

e. Par 1.9 - Performance period changed to 395 calendar days.

f. Par 1.11.1.11. - Hangar door clarifications provided.

g. Par 1.11.1.9. – Facility occupancy requirement added.

h. Par 1.11.3.1. - Clarifications provided for HVAC systems.

i. Par 1.11.3.2. - Ductwork removal and replacement omitted from contract requirements

j. Par 1.11.3.3. - Replacement of water-cooled unit omitted from contract requirement.

k. Par 1.11.3.4. - Clarifications for Backshop HVAC replacement provided.

l. Par 1.11.3.5. - Hangar HVAC replacement omitted from project requirements.

m. Par 1.11.4.6. - Environmental control clarifications provided for fire riser room.

n. Par 1.11.4.7. - Replacement of Fire/MNS panel omitted from contract requirements

o. Par 1.11.4.8 - Blue strobe/beacons added to contract requirements.

p. Par 1.11.4.9. – Modifications to existing fire protection system added.

q. Par 1.11.5.2. - Clarifications to sustainable deign/construction criteria provided.

r. Par 1.11.5.2. - Tucson Electric Rebate Program omitted from contract requirements. Power criteria added to hangar doors

s. Par 2.2.1.3. - Load Calcs omitted from project requirements.

2. Any questions may be directed to Jason Mennella at 228-3481

JASON MENNELLA, GS-12

Architect

Attachment:

Section 01011 dated 13 July 2020

2020-07-14T07:43:25-0700
MENNELLA.JASON.D.1229367788

File details come from the government source that posted it. Updated .