This is a technical specification document for identification and signage for utilities prepared by Herbert, Rowland & Grubic, Inc. for the Northwestern Chester County Municipal Authority's West Pump Station Replacement Project in Pennsylvania. The specification details requirements for plastic ribbon tape to be installed above direct-buried utilities, specifically for sanitary sewer identification. The ribbon tape must be polyethylene material, brightly colored with continuous printing, measuring a minimum of 6 inches wide by 4 mils thick, manufactured for direct burial service, and imprinted with "CAUTION - SANITARY SEWER BELOW" in large letters. Installation requires continuous placement of the ribbon tape directly over the top of pipe, and when multiple pipes exist in a common trench, the tape shall be located above the centerline of the trench. The installation work must be coordinated with trenching and backfilling operations specified in related sections of the project specifications.

The specification references quality assurance requirements aligned with Northwestern Chester County Municipal Authority standards and requires manufacturers to have a minimum of three years' documented experience in producing the specified products. Product data submissions are required per standard submittal procedures, and project record documents must document the actual locations of tagged valves upon project closeout. Maintenance materials must also be submitted in accordance with execution requirements. This specification is one component of the broader West Pump Station Replacement Project, which includes general construction, electrical construction, and mechanical construction contracts with bids due online by May 20, 2026 at 10:00 AM local time.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES

Herbert, Rowland & Grubic, Inc. 33 05 97 - 1 000483.0450

SECTION 33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Plastic ribbon tape for placement above direct-buried utility.

B. Related Requirements:

1. Section 31 23 16.13 – Trenching: Backfilling considerations for installation of underground pipe markers.

2. Section 31 23 23 – Fill: Backfilling considerations for installation of underground pipe markers.

3. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping: Piping, valves, and appurtenances requiring identification marking.

4. Section 33 31 23 – Sanitary Sewerage Force Main Piping: Pipe, valves, and appurtenances requiring identification marking.

1.2 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer catalog information for each specified product.

1.3 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual locations of tagged valves.

1.4 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 73 00 – Execution Requirements: Requirements for maintenance materials.

1.5 QUALITY ASSURANCE

A. Perform Work according to Northwestern Chester County Municipal Authority standards.

1.6 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES

Herbert, Rowland & Grubic, Inc. 33 05 97 - 2 000483.0450

PART 2 - PRODUCTS

2.1 RIBBON TAPE

A. Description:

1. Material: PE.

2. Brightly colored, continuously printed.

3. Minimum Size: 6 inches wide by 4 mils thick.

4. Manufactured for direct burial service.

5. Imprint: “CATION – SANITARY SEWER BELOW” in large letters.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Ribbon Tape:

1. Continuous over top of pipe.

2. If multiple pipes occur in common trench, locate tape above centerline of trench.

3. Coordinate with trench Work as specified in Section 31 23 16.13 – Trenching and

31 23 23 – Fill.

END OF SECTION 33 05 97