This is a technical specification document for identification and signage for utilities prepared by Herbert, Rowland & Grubic, Inc. for the Northwestern Chester County Municipal Authority's West Pump Station Replacement Project in Pennsylvania. The specification details requirements for plastic ribbon tape to be installed above direct-buried utilities, specifically for sanitary sewer identification. The ribbon tape must be polyethylene material, brightly colored with continuous printing, measuring a minimum of 6 inches wide by 4 mils thick, manufactured for direct burial service, and imprinted with "CAUTION - SANITARY SEWER BELOW" in large letters. Installation requires continuous placement of the ribbon tape directly over the top of pipe, and when multiple pipes exist in a common trench, the tape shall be located above the centerline of the trench. The installation work must be coordinated with trenching and backfilling operations specified in related sections of the project specifications.
The specification references quality assurance requirements aligned with Northwestern Chester County Municipal Authority standards and requires manufacturers to have a minimum of three years' documented experience in producing the specified products. Product data submissions are required per standard submittal procedures, and project record documents must document the actual locations of tagged valves upon project closeout. Maintenance materials must also be submitted in accordance with execution requirements. This specification is one component of the broader West Pump Station Replacement Project, which includes general construction, electrical construction, and mechanical construction contracts with bids due online by May 20, 2026 at 10:00 AM local time.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES
Herbert, Rowland & Grubic, Inc. 33 05 97 - 1 000483.0450
SECTION 33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Plastic ribbon tape for placement above direct-buried utility.
B. Related Requirements:
1. Section 31 23 16.13 – Trenching: Backfilling considerations for installation of underground pipe markers.
2. Section 31 23 23 – Fill: Backfilling considerations for installation of underground pipe markers.
3. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping: Piping, valves, and appurtenances requiring identification marking.
4. Section 33 31 23 – Sanitary Sewerage Force Main Piping: Pipe, valves, and appurtenances requiring identification marking.
1.2 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer catalog information for each specified product.
1.3 CLOSEOUT SUBMITTALS
A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.
B. Project Record Documents: Record actual locations of tagged valves.
1.4 MAINTENANCE MATERIAL SUBMITTALS
A. Section 01 73 00 – Execution Requirements: Requirements for maintenance materials.
1.5 QUALITY ASSURANCE
A. Perform Work according to Northwestern Chester County Municipal Authority standards.
1.6 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
33 05 97 – IDENTIFICATION AND SIGNAGE FOR UTILITIES
Herbert, Rowland & Grubic, Inc. 33 05 97 - 2 000483.0450
PART 2 - PRODUCTS
2.1 RIBBON TAPE
A. Description:
1. Material: PE.
2. Brightly colored, continuously printed.
3. Minimum Size: 6 inches wide by 4 mils thick.
4. Manufactured for direct burial service.
5. Imprint: “CATION – SANITARY SEWER BELOW” in large letters.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Ribbon Tape:
1. Continuous over top of pipe.
2. If multiple pipes occur in common trench, locate tape above centerline of trench.
3. Coordinate with trench Work as specified in Section 31 23 16.13 – Trenching and
31 23 23 – Fill.
END OF SECTION 33 05 97