33 05 05.43 - Mandrel Testing.pdf

PDF 468 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a technical specification document for mandrel testing of plastic sewer piping, prepared by Herbert, Rowland & Grubic, Inc., in connection with the West Pump Station Replacement Project for the Northwestern Chester County Municipal Authority in Pennsylvania. The specification establishes requirements for deflection testing of polyvinyl chloride (PVC) and acrylonitrile butadiene styrene (ABS) sewer piping following installation and backfilling. Testing must occur after backfill has been in place for a minimum of 30 days but no longer than 12 months, utilizing a properly sized rigid ball or go/no-go mandrel with a diameter of no less than 95 percent of the pipe's internal diameter. Prior to testing initiation, contractors must submit testing procedures, equipment lists, testing sequence schedules, water disposal provisions, calibration certifications, and mandrel drawings and calculations. The specification also requires lamping operations to verify uniform line and grade installation, with rejection and reinstallation of non-compliant pipe sections.

The specification establishes a maximum allowable vertical ring deflection of five percent of the original vertical internal diameter for installed plastic sewer pipe. Testing must be performed without mechanical pulling devices, and any piping exceeding the allowable deflection threshold must be located, excavated, replaced, and retested at the contractor's expense. The document references ASTM D2122 for dimensional compliance and Section 01 33 00 submittal procedures, Section 01 73 00 execution requirements, and Section 01 40 00 quality requirements from the broader project specifications. Related work includes Section 33 31 11 for public sanitary sewerage gravity piping, which encompasses pipe materials, manholes, and accessories typical of gravity sewerage systems. No pricing information, funding sources, or contract award details are included in this technical specification section.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 05.43 – MANDREL TESTING

Herbert, Rowland & Grubic, Inc. 33 05 05.43 - 1 000483.0450

SECTION 33 05 05.43 – MANDREL TESTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Deflection testing of plastic sewer piping.

B. Related Requirements:

1. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping: Pipe materials, manholes, and accessories normally encountered with gravity sewerage piping.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM D2122 - Standard Test Method for Determining Dimensions of

Thermoplastic Pipe and Fittings.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Submit following items prior to start of testing:

1. Testing procedures.

2. List of test equipment.

3. Testing sequence schedule.

4. Provisions for disposal of flushing and test water.

5. Certification of test gage calibration.

6. Deflection mandrel drawings and calculations.

C. Test and Evaluation Reports: Indicate results of piping tests.

PART 2 - PRODUCTS

2.1 DEFLECTION TESTING

A. Equipment:

1. Properly sized rigid ball or “go, no go” mandrel.

2. Pull/retrieval ropes.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

B. Verify that piping is ready for testing.

C. Verify that trenches are backfilled.

33 05 05.43 – MANDREL TESTING

Herbert, Rowland & Grubic, Inc. 33 05 05.43 - 2 000483.0450

3.2 PREPARATION

A. Section 01 73 00 – Execution Requirements: Requirements for preparation.

B. Lamping:

1. Lamp gravity piping after flushing and cleaning.

2. Perform lamping operation by shining light at one end of each pipe section between manholes.

3. Observe light at other end.

4. Pipe not installed with uniform line and grade will be rejected.

5. Remove and reinstall rejected pipe sections.

6. Clean and lamp until pipe section is installed to uniform line and grade.

C. Plugs:

1. Plug outlets, wye branches, and laterals.

2. Brace plugs to resist test pressures.

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.

B. Deflection Testing of Plastic Sewer Piping:

1. Perform vertical ring deflection testing on PVC and ABS sewer piping after backfilling has been in place for at least 30 days, but not longer than 12 months.

2. Allowable maximum deflection for installed plastic sewer pipe is no greater than five percent of original vertical internal diameter.

3. Perform deflection testing using properly sized rigid ball or “go, no go” mandrel.

4. Rigid Ball or Mandrel Diameter:

a. Not less than 95 percent of base or average ID of pipe.

b. Pipe Diameter: Comply with ASTM D2122.

5. Perform testing without mechanical pulling devices.

6. Locate, excavate, replace, and retest piping that exceeds allowable deflection.

END OF SECTION 33 05 05.43