33 05 05.36 - Vacuum Testing.pdf

PDF 470 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a technical specification document for vacuum testing of sanitary and stormwater manholes, prepared by Herbert, Rowland & Grubic, Inc., in support of the West Pump Station Replacement Project being undertaken by Northwestern Chester County Municipal Authority in Pennsylvania. The specification outlines requirements for vacuum testing of newly constructed or repaired manholes prior to backfilling, including mandatory compliance with ASTM C1244 standard testing procedures. The work requires a testing contractor with a minimum of three years' experience in performing vacuum testing services. Submittals must include testing procedures, equipment lists, testing sequence schedules, provisions for water disposal, and calibration certifications prior to commencement of testing activities. The specification establishes test duration requirements based on manhole diameter (60 seconds for 4-foot diameter, 75 seconds for 5-foot diameter, and 90 seconds for 6-foot diameter structures) with an acceptance criterion of no more than 1 inch of mercury vacuum drop during the specified test period.

The specification requires use of calibrated vacuum testing equipment including a vacuum pump, compression band seal apparatus, vacuum gage, plugs, and shutoff valve. Testing procedures mandate that pipe openings be plugged and braced, a compression band be inflated to create a seal between the vacuum base and structure, and vacuum be drawn to 10 inches of mercury before the valve is closed for the timed test period. Any manhole exhibiting a vacuum drop exceeding 1 inch of mercury must be repaired and retested, and all visible leaks must be repaired regardless of leakage quantity. The contractor must document vacuum drop measurements and maintain records of all test results; testing continues until all manholes meet acceptance criteria or are deemed unacceptable following specified repair and retest procedures.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 05.36 – VACUUM TESTING

Herbert, Rowland & Grubic, Inc. 33 05 05.36 - 1 000483.0450

SECTION 33 05 05.36 – VACUUM TESTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Vacuum testing of manholes.

B. Related Requirements:

1. Section 33 01 30.86 – Manhole Rim Adjustment: Raising or replacing of designated manhole rims.

2. Section 33 05 61 – Concrete Manholes: Requirements for sewage and stormwater manholes.

3. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping: Pipe materials, manholes, and accessories normally encountered with gravity sewerage piping.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM C1244 - Standard Test Method for Concrete Sewer Manholes by the

Negative Air Pressure (Vacuum) Test Prior to Backfill.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Submit following items prior to start of testing:

1. Testing procedures.

2. List of test equipment.

3. Testing sequence schedule.

4. Provisions for disposal of flushing and test water.

5. Certification of test gage calibration.

C. Test and Evaluation Reports: Indicate results of manhole tests.

1.4 QUALIFICATIONS

A. Testing Contractor: Company specializing in performing Work of this Section with minimum three years' experience.

PART 2 - PRODUCTS

2.1 VACUUM TESTING

A. Equipment:

1. Vacuum pump.

2. Vacuum line.

3. Vacuum Tester Base:

33 05 05.36 – VACUUM TESTING

Herbert, Rowland & Grubic, Inc. 33 05 05.36 - 2 000483.0450

a. Compression band seal.

b. Outlet port.

4. Shutoff valve.

5. Stopwatch.

6. Plugs.

7. Vacuum Gage: Calibrated to 0.1 in. Hg.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

B. Verify that manholes are ready for testing.

C. Verify that manholes are backfilled.

3.2 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.

B. Manhole Testing:

1. Repair both outside and inside of joint to ensure permanent seal.

2. Test manholes with manhole frame set in place.

3. Vacuum Testing:

a. Comply with ASTM C1244.

b. Plug pipe openings; securely brace plugs and pipe.

c. Inflate compression band to create seal between vacuum base and structure.

d. Connect vacuum pump to outlet port with valve open, then draw vacuum to 10 in. Hg.

e. Close valve.

f. Manhole Test Duration in Seconds:

1) Manhole Diameter of 4 Feet: 60.

2) Manhole Diameter of 5 Feet: 75.

3) Manhole Diameter of 6 Feet: 90.

g. Record vacuum drop during test period.

h. If vacuum drop is greater than 1 in. Hg during testing period, repair and retest manhole.

i. If vacuum drop of 1 in. Hg does not occur during test period, manhole is acceptable; discontinue testing.

j. If vacuum test fails to meet 1-in. Hg drop in specified time after repair, repair and retest manhole.

4. If unsatisfactory testing results are achieved, repair manhole and retest until result meets criteria.

5. Repair visible leaks regardless of quantity of leakage.

END OF SECTION 33 05 05.36