This specification document outlines the technical requirements for manhole rim adjustment work as part of the West Pump Station Replacement Project administered by the Northwestern Chester County Municipal Authority in Pennsylvania. The work includes raising manhole frames and covers to grade using flat or tapered rubber manhole rings, with adjustments not to exceed 6 inches, along with associated excavation, cleaning, waterproofing repairs, and landscape restoration. Materials must comply with ASTM standards including precast concrete riser rings (ASTM C478), rubber seal wraps (ASTM C877, Type III), joint sealants (ASTM C990), and stainless steel bolts (ASTM F593). The specification requires a preinstallation meeting minimum one week prior to work commencement and submittal of manufacturer product data, installation instructions, qualifications statements, and shop inspection results. Manufacturers and installers must demonstrate minimum three years of documented experience in their respective areas.

The specification establishes Pennsylvania Department of Transportation standards as the governing quality assurance requirements and mandates that field measurements be verified prior to fabrication with results indicated on Shop Drawings. Upon completion, contractors must submit project record documents showing actual grade-adjusted elevations of all manholes and restore grassed areas according to landscape grading and seeding specifications. Materials must be delivered in original manufacturer packaging, inspected for damage, and stored in clean, dry locations protected from moisture and dust. Approved manufacturers may submit certificates of compliance in lieu of specified shop tests, and all joints must be sealed with approved sealants meeting specified overlap requirements of 2 to 3 inches depending on joint location.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 01 30.86 – MANHOLE RIM ADJUSTMENT

Herbert, Rowland & Grubic, Inc. 33 01 30.86 - 1 000483.0450

SECTION 33 01 30.86 - MANHOLE RIM ADJUSTMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Raising manhole frames and covers.

B. Related Requirements:

1. Section 03 41 00 – Precast Structural Concrete: Execution requirements for precast and prestressed concrete members as specified in this Section.

2. Section 32 91 19 – Landscape Grading: Restoration of grassed areas.

3. Section 33 31 11 – Public Sanitary Sewerage Gravity Piping: Execution requirements for sewerage piping as required by this Section.

1.2 REFERENCE STANDARDS

A. American Association of State Highway and Transportation Officials:

1. AASHTO M306 - Standard Specification for Drainage, Sewer, Utility, and Related

Castings.

B. ASTM International:

1. ASTM A48/A48M - Standard Specification for Gray Iron Castings.

2. ASTM C32 - Standard Specification for Sewer and Manhole Brick (Made from Clay or Shale).

3. ASTM C478 - Standard Specification for Circular Precast Reinforced Concrete

Manhole Sections.

4. ASTM C877 - Standard Specification for External Sealing Bands for Concrete Pipe, Manholes, and Precast Box Sections.

5. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and

Precast Box Sections Using Preformed Flexible Joint Sealants.

6. ASTM F593 - Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and

Studs.

7. ASTM F1554 - Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi

Yield Strength.

1.3 PREINSTALLATION MEETINGS

A. Section 01 31 19 – Project Meetings: Requirements for preinstallation meeting.

B. Convene minimum one week prior to commencing Work of this Section.

1.4 SCHEDULING

A. Section 01 32 16 – Construction Progress Schedule: Requirements for scheduling.

B. Submit schedule for manhole grade adjustments.

Herbert, Rowland & Grubic, Inc. 33 01 30.86 - 2 000483.0450

1.5 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer information for manhole covers and riser rings construction, features, configuration, and dimensions.

C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

D. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.

E. Source Quality-Control Submittals: Indicate results of shop or factory tests and inspections.

F. Qualifications Statements:

1. Submit qualifications for manufacturer and installer.

2. Submit manufacturer's approval of installer.

1.6 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Execution and Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Record actual grade-adjusted elevation of manholes.

1.7 QUALITY ASSURANCE

A. Perform Work according to Pennsylvania Department of Transportation standards.

1.8 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.

B. Installer: Company specializing in performing Work of this Section with minimum three years' experience.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

Herbert, Rowland & Grubic, Inc. 33 01 30.86 - 3 000483.0450

2. Provide additional protection according to manufacturer instructions.

1.10 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements prior to fabrication.

2. Indicate field measurements on Shop Drawings.

PART 2 - PRODUCTS

2.1 MANHOLE FRAMES AND COVERS

A. Refer to Section 33 05 61 – Concrete Manholes.

2.2 RISER RINGS

A. Riser Rings:

a. Material: Precast concrete.

b. Comply with ASTM C478.

2. Rubber Seal Wraps:

a. Wraps and Band Widths: Comply with ASTM C877, Type III.

b. Cone/Riser Ring Joint: Minimum 3-inch overlap.

c. Frame/Riser Ring Joint: 2-inch overlap.

d. Additional Bands: Overlap upper band by 2 inches.

B. Accessories:

1. Joint Sealant: Comply with ASTM C990.

2. Bolts: Stainless steel; ASTM F593.

2.3 SOURCE QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for testing, inspection, and analysis.

B. Provide shop inspection and testing of completed assembly.

C. Certificate of Compliance:

1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.

2. Specified shop tests are not required for Work performed by approved manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

Herbert, Rowland & Grubic, Inc. 33 01 30.86 - 4 000483.0450

B. Saw cut existing paving.

C. Excavate.

D. Clean manholes.

E. Remove existing manhole frames and covers.

F. Repair waterproofing.

3.2 INSTALLATION

A. Raising Manhole Frames and Covers:

1. Locate and raise manholes to grade as indicated on Drawings.

2. Use flat or tapered rubber manhole rings to achieve indicated elevation for frame and cover.

3. Do not adjust elevation greater than 6 inches with rubber manhole rings.

4. Use sealant to seal joints between manhole top, rubber rings, and frame.

5. Reinstall removed manhole frame and cover.

B. Landscaping Restoration:

1. Restore grassed areas as specified in Sections 32 91 19 – Landscape Grading and

32 92 19 – Seeding.

END OF SECTION 33 01 30.86

File details come from the government source that posted it. Updated .