This is a technical specification document for seeding work prepared by Herbert, Rowland & Grubic, Inc. for the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4. The specification section (32 92 19) establishes comprehensive requirements for seeding, mulching, and maintenance activities associated with the project. The work includes uniform sowing of specified seed mixes using approved hydraulic seeders, power-drawn drills, or hand-operated methods, with seed coverage to an average depth of one-quarter inch. Mulching must be completed within 48 hours of seeding using hay, straw, or wood cellulose materials applied at rates specified in the contract drawings, with hay and straw anchored by wood cellulose fiber hydraulically. Maintenance activities include watering, weeding, cleanup, edging, and repair of depressions or washouts, with areas failing to show grass establishment within 14 days of seeding or sodding to be reseeded or resodded until complete catch occurs. The specification references PennDOT Publication 408 Specifications and related Pennsylvania laws governing seed quality, agricultural liming materials, and soil conditioners.

The specification establishes strict quality assurance requirements for all materials, including seed provided in containers displaying germination percentage, inert matter percentage, weed percentage, production year, net weight, packaging date, and packaging location. Fertilizer must be delivered in waterproof bags showing weight, chemical analysis, and manufacturer information. Hay and straw must be cured to less than 20 percent moisture content and free of tobacco, soybean, or other coarse woody material, while wood cellulose must meet specific moisture content (12% ± 3%), organic matter (98.6% ± 0.2%), ash content (1.4% ± 0.2%), and water-holding capacity (minimum 1000%) standards. All seed materials must be fully tagged, delivered in separate packages by species or seed mix, and rejected if wet, moldy, or damaged in transit. Inoculated seed not sown within 24 hours of inoculation requires reinoculation prior to sowing.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

32 92 19 – SEEDING

Herbert, Rowland & Grubic, Inc. 32 92 19 - 1 009280.0426

SECTION 32 92 19 – SEEDING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Seeding.

2. Mulching.

3. Maintenance.

B. Related Sections:

1. Section 32 91 13 – Soil Preparation

2. Section 32 91 19 – Landscape Grading

3. Section 32 92 23 – Sodding.

1.2 REFERENCES

A. Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications.

B. Pennsylvania Seed Act of 1965, Act 187, as amended.

C. Agricultural Liming Materials Act of 1978, P.L. 15, No. 9 (3 P.S. 132-1), as amended.

D. Pennsylvania Soil Conditioner and Plant Growth Substance Law, Act of December 1, 1977, P.L. 258, No. 86 (3 P.S. 68.2), as amended.

E. Rules for Testing Seeds of the Association of Official Seed Analysts.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Samples:

1. When directed, furnish three strips of sod, 4½" feet long by 12" wide, laid on 3" of topsoil and tamped in place. The samples shall be representative of the sod and workmanship to be provided.

2. Advise the Engineer of the location of the field, and area within the field, from which the sod is to be taken for approval.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 2 009280.0426

C. Certificates:

1. Prior to use or placement of material, submit certifications of material composition of the following for approval:

b. Fertilizer.

c. Lime.

d. Seed mixture(s).

1.4 QUALITY ASSURANCE

A. Provide seed mixture in containers showing percentage of seed mix, germination percentage, inert matter percentage, weed percentage, year of production, net weight, date of packaging, and location of packaging.

B. Perform Work in accordance with PennDOT and Elizabethtown Area Water Authority standard.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Product Requirements: Product storage and handling requirements.

B. Deliver seed fully tagged and in separate packages according to species or seed mix. Seed which has become wet, moldy, or otherwise damaged in transit or storage, will not be accepted.

C. Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer.

1.6 MAINTENANCE SERVICE

A. Section 01 73 00 – Execution Requirements: Requirements for maintenance service.

B. Maintain seeded areas immediately after placement until grass is well established and exhibits vigorous growing condition.

PART 2 - PRODUCTS

2.1 SEED

A. Seed shall conform to Section 804.2(b), Publication 408 Specifications.

2.2 SEED FORMULAS

A. See Seeding Schedule on the Contract Drawings.

B. Seed formula and species shall conform to the PennDOT formula identified on the Contract Drawings, and in Section 31 25 00 – Erosion and Sedimentation Controls.

2.3 INOCULANT

A. Inoculant shall conform to Section 804.2(c), Publication 408 Specifications.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 3 009280.0426

B. Protect inoculated seed from prolonged exposure to sunlight prior to sowing.

C. Reinoculate seed not sown within 24 hours following initial inoculation.

2.4 MULCHING MATERIALS

A. Mulches for seeded areas shall be one, or a combination of, the following:

1. Hay:

a. Cured to less than 20% moisture content by weight.

b. Contain no stems of tobacco, soybeans, or other coarse or woody material.

c. Timothy hay or mixed clover and timothy hay.

2. Straw:

a. Cured to less than 20% moisture content by weight.

b. Contain no stems of tobacco, soybeans, or other coarse or woody material.

c. Wheat or oat straw.

3. Wood Cellulose:

a. No growth or germination inhibiting substances.

b. Green, air dried. Packages not exceeding 100 pounds.

c. Requirements:

1) Moisture content: 12% + 3%

2) Organic Matter: 98.6% + 0.2% on the oven dry basis.

3) Ash content: 1.4% + 0.2%

4) Minimum Water-Holding Capacity: 1000%

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Verification of existing conditions before starting work.

B. Verify prepared soil base is ready to receive the Work of this section.

3.2 SEEDING

A. See Seeding Schedule on the Contract Drawings.

B. Uniformly sow specified seed mix by use of approved hydraulic seeder, power-drawn drill, power-operated seeder, or hand-operated seeder or by hand. Do not seed when winds are over 15 mph.

C. Upon completion of sowing, cover seed to an average depth of 1/4" by hand reraking or approved mechanical methods.

Herbert, Rowland & Grubic, Inc. 32 92 19 - 4 009280.0426

3.3 MULCHING

A. Mulching within 48 hours of seeding.

B. Place hay and straw mulch in a continuous blanket at the minimum rate indicated in the Seeding Schedule on the Contract Drawings.

C. Anchor hay or straw mulch by use of wood cellulose fiber hydraulically at the rate indicated in the Seeding Schedule on the Contract Drawings.

1. A light covering of topsoil may be used for anchorage when the size of the area precludes the use of mechanical equipment.

2. Incorporate as an integral part of the slurry after seed and soil supplements have been thoroughly mixed.

D. When mulch is applied to grass areas by blowing equipment, the use of cutters in the equipment will be permitted to the extent that a minimum of 95% of the mulch is 6" or more in length. For cut mulches applied by the blowing method, achieve a loose depth in place of not less than 2".

3.4 MAINTENANCE

A. Maintenance includes watering, weeding, cleanup, edging and repair of depressions, washouts or gullies.

B. Those areas which do not show a prompt catch or grass within 14 days of seeding or sodding shall be reseeded or resodded until complete grass catch occurs.

3.5 SEEDING SCHEDULE

A. Refer to Contract Drawings for seeding schedule.

END OF SECTION 32 92 19