32 13 13 - Concrete Paving.pdf
PDF 474 KB Posted
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a technical specifications document for concrete paving work prepared by Herbert, Rowland & Grubic, Inc., applicable to the Water Main Replacement Project Phase 4 for the Elizabethtown Area Water Authority in Pennsylvania. The specification section (32 13 13) covers concrete paving materials and installation for concrete sidewalks, concrete curbs, and curb ramps as related components of the water main replacement project. The work must comply with current Commonwealth of Pennsylvania Department of Transportation (PennDOT) Specifications Publication 408, including sections covering reinforced or plain cement concrete pavements, plain cement concrete curbs, and cement concrete sidewalks. All concrete materials must meet ASTM C94/C94M standards for ready-mixed concrete, with mix designs requiring Engineer review and approval prior to use. Concrete placement is prohibited when base surface temperatures are below 40 degrees Fahrenheit or when surfaces are wet or frozen. The specification requires notification to the Architect/Engineer at least 24 hours before commencement of concrete operations and mandates protection of the finished paving from premature drying, temperature extremes, and mechanical injury for a minimum of 7 days after placement or until the concrete achieves 75 percent of its design strength.
The specification does not establish independent pricing terms, as it functions as a technical requirement document within the larger contract framework. Quality assurance requirements include obtaining cementitious materials from a single source throughout the project and performing work in accordance with PennDOT and West Donegal Township standards. Source quality control involves submission of proposed mix designs to an appointed testing firm for review, with testing performed on cement, aggregates, and concrete mixes to ensure specification conformance. Existing sidewalk and curb foundations must be protected during construction, with any disturbed materials replaced with compactible materials matching existing conditions. The document references related specification sections for concrete forming, aggregate base courses, asphalt paving, and landscape grading, indicating this concrete paving work is a component of a comprehensive infrastructure project rather than a standalone scope.
View the file
Other files
Show 40 more
Latest 50 of 91 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
32 13 13 – CONCRETE PAVING
Herbert, Rowland & Grubic, Inc. 32 13 13 - 1 009280.0426
SECTION 32 13 13 – CONCRETE PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Concrete paving for:
a. Concrete sidewalks.
b. Concrete curbs.
B. Related Requirements:
1. Section 03 10 00 – Concrete Forming and Accessories.
2. Section 32 11 23 – Aggregate Base Courses.
3. Section 32 12 16 – Asphalt Paving.
4. Section 32 91 19 – Landscape Grading
1.2 REFERENCE STANDARDS
A. The "PennDOT Sections" noted herein refer to sections contained in the current Commonwealth of Pennsylvania Department of Transportation Specifications Publication 408, as supplemented or revised. All work shall be completed in accordance with the applicable PennDOT standards, supplements, and interims unless otherwise noted.
B. Commonwealth of Pennsylvania Department of Transportation Specifications Publication 408, latest edition.
1. PennDOT Section 501 Reinforced or Plain Cement Concrete Pavements.
2. PennDOT Section 630 Plain Cement Concrete Curb.
3. PennDOT Section 676 Cement Concrete Sidewalks.
4. PennDOT Section 703 Aggregates.
5. PennDOT Section 704 Cement Concrete.
C. Commonwealth of Pennsylvania Department of Transportation Standards for Roadway Construction Publication 72M, latest edition.
D. Commonwealth of Pennsylvania Department of Transportation Bulletin 15.
E. Commonwealth of Pennsylvania, Pennsylvania Code, Title 67, Transportation, Department of Transportation, Chapter 459, Occupancy of Highways by Utilities, as supplemented or revised.
Herbert, Rowland & Grubic, Inc. 32 13 13 - 2 009280.0426
F. Commonwealth of Pennsylvania, Pennsylvania Code, Title 67, Transportation, Department of Transportation, Chapter 212, Official Traffic Control Devices (PennDOT Publication 212).
G. ASTM International:
1. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete.
1.3 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Product Data:
1. Mix Design: Submit mix design for each mix to be used. Design shall indicate admixtures proposed for use. Mix design shall be reviewed by Engineer prior to use.
C. Certificates: Furnish the Engineer and local authorities requiring same, certificates originated by the batch mixing plant certifying ready mixed concrete as manufactured and delivered to be in conformance with ASTM C 94.
1.4 QUALITY ASSURANCE
A. Obtain cementitious materials from same source throughout.
B. Perform Work in accordance with PennDOT and West Donegal Township standards.
1.5 AMBIENT CONDITIONS
A. Section 01 50 00 – Temporary Facilities and Controls: Ambient conditions control facilities for product storage and installation.
B. Do not place concrete when base surface temperature is less than 40 degrees F, or surface is wet or frozen.
C. Protection:
1. Protect and maintain existing sidewalk foundation material during construction of utilities and curb construction. Replace material disturbed during construction as incidental to concrete curb construction. Replacement material must consist of a material that can be adequately compacted in place.
2. Protect and maintain existing curb foundation and curb during construction of utilities and full depth reconstruction. Replace curb and material disturbed during construction as incidental to full depth paving. Replacement material must consist of a material that can be adequately compacted in place and matches existing conditions.
Herbert, Rowland & Grubic, Inc. 32 13 13 - 3 009280.0426
PART 2 - PRODUCTS
2.1 CONCRETE PAVING
A. Form Materials:
1. Refer to Section 03 10 00 – Concrete Forming and Accessories.
B. Concrete Materials:
1. Plain Cement Concrete Curb: In accordance with PennDOT Publication 408, Section 630.2.
2. Cement Concrete Sidewalks and Curb Ramps: In accordance with PennDOT Publication 408, Section 676.2.
2.2 SOURCE QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Testing and Inspection Services.
B. Submit proposed mix design of each class of concrete to appointed firm for review prior to commencement of Work.
C. Tests on cement, aggregates, and mixes will be performed to ensure conformance with specified requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.
B. Verify compacted subgrade subbase is dry.
C. Verify gradients and elevations of base are correct.
3.2 PREPARATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.
B. Verify proper subgrade installation per the Contract Drawings.
C. Moisten substrate to minimize absorption of water from fresh concrete.
D. Coat surfaces of water main valve frames with oil to prevent bond with concrete paving.
E. Notify Architect/Engineer minimum 24 hours prior to commencement of concreting operations.
Herbert, Rowland & Grubic, Inc. 32 13 13 - 4 009280.0426
3.3 INSTALLATION
A. Forms:
1. Section 03 10 00 – Concrete Forming and Accessories.
B. Construction:
1. Plain Cement Concrete Curb: In accordance with PennDOT Publication 408, Section 630.3.
2. Cement Concrete Sidewalks: In accordance with PennDOT Publication 408, Section 676.3.
C. Placing Concrete:
1. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury.
2. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete.
3.4 TOLERANCES
A. Section 01 40 00 – Quality Requirements: Tolerances.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.
3.6 PROTECTION
A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.
B. Immediately after placement, protect paving from premature drying, excessive hot or cold temperatures, and mechanical injury.
C. Do not permit pedestrian traffic over paving for 7 days minimum after finishing or until 75 percent design strength of concrete has been achieved.
3.7 SIDEWALK RESTORATION
A. Refer to Restoration Schedule seen in Section 32 12 16 – Asphalt Paving.
END OF SECTION 32 13 13