31 23 16.26 - Rock Removal.pdf

PDF 468 KB Posted

Attached to
Water Main Replacement Project Phase 4 Contract No. WR-4
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a specification document for rock removal work prepared by Herbert, Rowland & Grubic, Inc., applicable to the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4) in Pennsylvania. The specification establishes technical requirements for removing identified and discovered rock during excavation, defining site rock as solid mineral material exceeding 1/3 cubic yard in volume or material requiring specialized equipment to remove without drilling or blasting. The work encompasses mechanical rock removal using trenchers, hydraulic breakers, rippers, or specialized equipment to break rock to specified lines and grades, excavation of utility trenches to 6 inches below pipe invert elevation and 16 inches wider than pipe diameter, and removal of shaled layers to provide sound bearing surfaces. Contractors must submit shop drawings indicating proposed blasting methods, delay patterns, explosive types, and rock removal methodology, along with survey reports documenting pre-existing conditions of nearby buildings through photographs and condition assessments. The specification requires scheduling to avoid disruption to occupied buildings and mandates visual inspection of bearing surfaces by the Engineer before installing subsequent work.

The document contains no specific pricing terms, quantities, set-asides, or funding information. Rock removal costs are to be incorporated into the overall project bid for the water main replacement work, which includes relocation of approximately 13,860 feet of water main and associated appurtenances and replacement of approximately fifteen fire hydrants. Bids for Contract WR-4 were received online through PennBid until Thursday, August 6, 2026, at 10:00 AM local time. The specification references related sections including Section 31 23 33 for Trenching and Backfilling for Utilities and Section 01 33 00 for submittal procedures, indicating integration within a comprehensive project manual and contract document set.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 31 13 - Project Coordination.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 16.26 – ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 1 009280.0426

SECTION 31 23 16.26 – ROCK REMOVAL

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Removing identified and discovered rock during excavation.

B. Related Sections:

1. Section 31 23 33 – Trenching and Backfilling for Utilities

1.2 DEFINITIONS

A. Site Rock: Solid mineral material with volume in excess of 1/3 cu yd or solid material that cannot be removed with 3/4 cu yd capacity excavator without drilling or blasting.

B. Trench Rock: Solid mineral material with volume in excess of 1/6 cu yd or solid material that cannot be removed with 1/6 cu yd capacity excavator without drilling or blasting.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Submittal procedures.

B. Shop Drawings: Indicate proposed method of blasting, delay pattern, explosive types, type of blasting mat or cover, and intended rock removal method.

C. Survey Report: Submit survey report on conditions of buildings near locations of rock removal.

1.4 PROJECT CONDITIONS

A. Conduct survey and document conditions of buildings near locations of rock removal, prior to rock removal, and photograph existing conditions identifying existing irregularities.

1.5 SCHEDULING

A. Schedule Work to avoid disruption to occupied buildings nearby.

PART 2 - PRODUCTS - Not Used

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify site conditions and note subsurface irregularities affecting Work of this section.

3.2 PREPARATION

A. Identify required lines, levels, contours, and datum.

3.3 ROCK REMOVAL BY MECHANICAL METHOD

A. Excavate and remove rock by mechanical method.

31 23 16.26 – ROCK REMOVAL

Herbert, Rowland & Grubic, Inc. 31 23 16.26 - 2 009280.0426

1. Break rock using trenchers, hydraulic breakers, rippers or other specialized equipment. Break rock to lines and grades shown on the drawings, or as required to complete the work. Finished rock surface should be relatively uniform.

B. Cut away rock at bottom of excavation to form level bearing.

C. Remove shaled layers to provide sound and unshattered base for foundations.

D. In utility trenches, excavate to 6 inches below invert elevation of pipe and 16 inches wider than pipe diameter.

E. Remove excavated materials from site.

F. Correct unauthorized rock removal in accordance with backfilling and compacting requirements of 31 23 33 – Trenching and Backfilling for Utilities.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request visual inspection of bearing surfaces by Engineer and inspection agency before installing subsequent work.

END OF SECTION 31 23 16.26