03 39 00 - Concrete Curing.pdf

PDF 531 KB Posted

Attached to
Water Main Replacement Project Phase 4 Contract No. WR-4
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a technical specification document for concrete curing procedures prepared by Herbert, Rowland & Grubic, Inc., applicable to the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4). The specification establishes requirements for initial and final curing of horizontal and vertical concrete surfaces in compliance with American Concrete Institute (ACI) standards, including ACI 301, ACI 302.1, and ACI 308.1, as well as ASTM International standards ASTM C171 and ASTM C309. The document mandates the use of membrane-curing compounds compliant with ASTM C309 Type 1, Class B for horizontal surfaces, which must be cured using the Moist Cover Curing method in accordance with ACI 308.1, while vertical surfaces require curing using the Moist Curing method. Acceptable materials include absorptive mats conforming to AASHTO M182 Class 3 (burlap cloth or cotton), moisture-retaining covers per ASTM C171 (polyethylene film or white burlap-polyethylene sheet), and potable water. The specification requires submittal of manufacturer's information on all curing compounds, mats, paper, and film prior to application, with materials to be delivered in original manufacturer packaging and stored in clean, dry locations protected from moisture and dust.

The specification prohibits traffic over unprotected floor surfaces and requires verification that substrate surfaces are ready for curing prior to application. All work must be performed in accordance with ACI 301 specifications for structural concrete and must comply with examination and execution requirements outlined in Section 01 73 00. No pricing, set-asides, or incumbent contractor information is contained within this technical specification document, as it represents standard engineering requirements applicable to concrete work within the water main replacement project rather than procurement terms or financial arrangements.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
01 31 13 - Project Coordination.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03 39 00 – CONCRETE CURING

Herbert, Rowland & Grubic, Inc. 03 39 00 - 1 009280.0426

SECTION 03 39 00 – CONCRETE CURING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Initial and final curing of horizontal and vertical concrete surfaces.

B. Related Requirements:

1. Section 03 30 00 – Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frames, slabs on fill or grade, and other concrete components associated with construction.

1.2 REFERENCE STANDARDS

A. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

2. ACI 302.1 - Guide to Concrete Floor and Slab Construction.

3. ACI 308.1 - Specification for Curing Concrete.

B. ASTM International:

1. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete.

2. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit manufacturer's information on curing compounds, mats, paper, and film, including compatibilities and limitations.

1.4 QUALITY ASSURANCE

A. Perform Work according to ACI 301.

Herbert, Rowland & Grubic, Inc. 03 39 00 - 2 009280.0426

1.5 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for dam-age.

C. Store materials according to manufacturer instructions.

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Membrane-Curing Compound:

1. Comply with ASTM C309, Type 1, Class B.

B. Absorptive Mats: AASHTO M182, Class 3, burlap cloth or cotton mats.

C. Moisture-Retaining Cover: ASTM C171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable; not detrimental to concrete.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for application examination.

B. Verify that substrate surfaces are ready to be cured.

3.2 APPLICATION

A. Horizontal Surfaces:

1. Comply with ACI 308.1, using Moist Cover Curing method.

Herbert, Rowland & Grubic, Inc. 03 39 00 - 3 009280.0426

B. Vertical Surfaces:

1. Comply with ACI 308.1, using Moist Curing method.

3.3 PROTECTION

A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.

B. Do not permit traffic over unprotected floor surfaces.

END OF SECTION 03 39 00