00 63 36 - Field Order Form.pdf
PDF 482 KB Posted
- Solicitation number
- Not on record
- Issued by
- Lancaster County, Pennsylvania
About this file
This is a Field Order Form issued by Herbert, Rowland & Grubic, Inc., the engineer, to the general construction contractor for the Water Main Replacement Project Phase 4 (Contract No. WR-4) on behalf of the Elizabethtown Area Water Authority in Pennsylvania. The field order authorizes the contractor to execute minor changes to the work without modifications to the contract price or contract times, in accordance with General Conditions Paragraph 11.01. The form provides space for specification references, drawing details, and a description of the work to be performed, along with attachment documentation. The document includes fields for the engineer's authorized signature, date of issuance, effective date, and distribution to relevant project stakeholders.
The field order is a standard administrative document used during project execution to direct contractor work modifications. If the contractor determines that any proposed changes require adjustments to contract price or contract times, the contractor must submit a Change Proposal prior to proceeding with the work. The form does not specify pricing, set-asides, funding sources, or other financial terms, as these are typically established in the underlying contract documents rather than individual field orders.
View the file
Other files
Show 40 more
Latest 50 of 91 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Herbert, Rowland & Grubic, Inc. 00 63 36 - 1 009280.0426
Field Order No.
Date Issued: Effective Date:
Owner: Elizabethtown Area Water Authority Owner’s Contract No.: WR-4
Engineer: Herbert, Rowland, & Grubic, Inc. Contractor’s Project No.:
Contractor: Engineer's Project No.: 009280.0426
Project: Water Main Replacement Project Phase Contract Name: General Construction
Contractor is hereby directed to promptly execute this Field Order, issued in accordance with General Conditions Paragraph 11.01, for minor changes in the Work without changes in Contract Price or Contract Times. If Contractor considers that a change in Contract Price or Contract Times is required, submit a Change Proposal before proceeding with this Work.
Reference:
Specification(s) Drawing(s) / Detail(s)
Description:
Attachments:
ISSUED:
By:
Engineer (Authorized Signature)
Title:
Date:
Copy to: Owner
File details come from the government source that posted it. Updated .