This is a technical specifications document for Erosion and Sedimentation Controls prepared by Herbert, Rowland & Grubic, Inc. for the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4) in Lancaster County, Pennsylvania. The specification establishes guidelines and techniques for minimizing erosion, sedimentation, and stormwater pollution during and after construction. The project scope includes relocation of approximately 13,860 feet of 4-inch, 6-inch, and 8-inch DIP water main with new 12-inch DIP installation, replacement of approximately fifteen fire hydrants, and transfer of approximately 180 existing water services. Bids are due online by Thursday, August 6, 2026, at 10:00 AM local time, with public bid opening immediately following. Bidding documents are available at https://pennbid.bonfirehub.com/. The contractor is responsible for all materials, equipment, labor, and miscellaneous items as specified in the contract documents, with all work to be completed in compliance with Pennsylvania Department of Environmental Protection and Lancaster County Conservation District requirements.
The specification requires contractors to prepare and submit an Erosion and Sediment Pollution Control Plan for approval by the Lancaster County Conservation District prior to commencing earth-moving activities for any work not depicted in the contract drawings, including spoil or borrow areas. The contractor bears full financial responsibility for any fines and associated costs resulting from inadequate erosion and sedimentation protection. Additional erosion and sedimentation controls may be required at problem areas that develop during construction beyond those shown in the contract drawings. The specification provides general guidelines while deferring specific product materials, preparation procedures, installation methods, and maintenance requirements to the contract drawings, indicating detailed technical specifications are contained elsewhere in the project documentation.
View the file
Other files
Show 40 more
Latest 50 of 91 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 31 25 00 – EROSION AND SEDIMENTATION CONTROLS
Herbert, Rowland & Grubic, Inc. 31 25 00 - 1 009280.0426
SECTION 31 25 00 – EROSION AND SEDIMENTATION CONTROLS
PART 1 - GENERAL
1.01 EROSION AND SEDIMENTATION CONTROLS
A. Purpose: The purpose of this Erosion and Sedimentation Controls is to provide the Contractor with general guidelines as well as specific techniques for minimizing erosion and sedimentation and stormwater pollution during and after construction of the project.
B. Project location is in Elizabethtown, Lancaster County, Pennsylvania as shown on the
Contract Drawings.
C. Additional controls may be required at problem areas that develop during construction above and beyond those included in the Contract Drawings.
1.02 QUALITY ASSURANCE
A. Regulatory agency requirements.
1. The Contractor is advised that all work will be completed in compliance with the requirements of the details and the rules and regulations of the Pennsylvania Department of Environmental Protection and the Lancaster County Conservation District. Any fines and associated costs resulting from the Contractor's failure to provide adequate protection against soil erosion and sedimentation shall be borne by the Contractor.
1.03 SUBMITTALS
A. If the Contractor anticipates any work which is not as shown on the Contract Drawings and specifications (such as associated with spoil or borrow areas) the Contractor shall prepare and submit for approval an appropriate Erosion and Sediment Pollution Control Plan for that work. Such plan shall receive the approval of the Lancaster County Conservation District prior to the start of earth moving activities in those areas.
PART 2 - PRODUCTS
2.01 MATERIALS: (See Contract Drawings).
PART 3 - EXECUTION
3.01 PREPARATION: (See Contract Drawings).
3.02 INSTALLATION: (See Contract Drawings).
3.03 MAINTENANCE: (See Contract Drawings).
END OF SECTION 31 25 00