31 25 00 - Erosion And Sedimentation Controls.pdf

PDF 489 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a specification document for Section 31 25 00 - Erosion and Sedimentation Controls prepared by Herbert, Rowland & Grubic, Inc., applicable to the West Pump Station Replacement Project in Pennsylvania under the Northwestern Chester County Municipal Authority. The specification establishes requirements for erosion and sediment control measures including rock construction entrances, sediment barriers, and site stabilization. Products specified include non-biodegradable UV-resistant polypropylene geotextile fabric with minimum 12 oz./sq. yd. weight and 120 mil thickness, erosion control mulch blankets with organic biodegradable materials, compost filter socks in 12" to 32" diameters, and high-volume filter bags manufactured from woven geotextiles. The specification references the Pennsylvania Department of Environmental Protection's Erosion and Sediment Control Program Manual and multiple AASHTO, ACI, and ASTM standards for material testing and quality assurance. Construction execution requires weekly inspections of erosion control devices and repairs after each runoff event, with sediment removal when accumulation reaches one-third depth of structures or approximately one-half channel depth.

The specification establishes quality assurance requirements through adherence to Pennsylvania's Erosion and Sediment Control Program Manual standards and mandates pre-installation meetings scheduled minimum one week before work commences. Environmental conditions restrict concrete placement when base surface temperature is below 40 degrees Fahrenheit or surfaces are wet or frozen. Site stabilization measures require disturbed areas remaining exposed longer than 20 days to be stabilized with mulch at recommended rates, and stockpile heights shall not exceed 35 feet with slopes maintained at 2:1 or flatter. The specification incorporates references to related construction sections including concrete forming, excavation, fill, and landscape grading, establishing this erosion control work as foundational to the broader pump station replacement project.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 25 00 – EROSION AND SEDIMENTATION CONTROLS

Herbert, Rowland & Grubic, Inc. 31 25 00 - 1 000483.0450

SECTION 31 25 00 – EROSION AND SEDIMENTATION CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Rock Construction Entrance(s)

2. Sediment Barriers.

3. Site Stabilization.

B. Related Sections:

1. Section 03 10 00 – Concrete Forming and Accessories.

2. Section 03 20 00 – Concrete Reinforcing.

3. Section 03 30 00 – Cast-In-Place Concrete.

4. Section 03 41 00 – Precast Structural Concrete.

5. Section 31 23 16 – Excavation.

6. Section 31 23 23 – Fill.

7. Section 32 05 13 – Soils for Exterior Improvements.

8. Section 32 05 16 – Aggregates for Exterior Improvements.

9. Section 32 13 13 – Concrete Paving.

10. Section 32 91 19 – Landscape Grading.

C. Description: This section of the specification shall serve as a supplement to the Erosion and Sediment Pollution Control Plan for the Project.

1.2 REFERENCES

A. Pennsylvania Department of Environmental Protection, Bureau of Soil and Water Conservation

1. Erosion and Sediment Control Program Manual

B. American Association of State Highway and Transportation Officials:

1. AASHTO T88 - Standard Specification for Particle Size Analysis of Soils.

2. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

C. American Concrete Institute:

1. ACI 301 - Specifications for Structural Concrete.

D. ASTM International:

1. ASTM C127 - Standard Test Method for Density, Relative Density (Specific

Gravity), and Absorption of Coarse Aggregate.

2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of

Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

3. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

4. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in

Place by Nuclear Methods (Shallow Depth).

Herbert, Rowland & Grubic, Inc. 31 25 00 - 2 000483.0450

5. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).

E. Precast/Prestressed Concrete Institute:

1. PCI MNL-116S - Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data on products to be used.

C. Manufacturer's Certificate: Certify Products meet or exceed specified requirements.

1.4 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Closeout Procedures: Requirements for submittals.

1.5 QUALITY ASSURANCE

A. Perform Work according to State of Pennsylvania’s Erosion and Sediment Control Program Manual standards.

1.6 SEQUENCING

A. See Drawings for specific construction sequence.

1.7 PRE-INSTALLATION MEETINGS

A. Section 01 31 19 – Project Meetings: Pre-installation meeting.

B. Convene minimum one week prior to commencing work of this section.

1.8 ENVIRONMENTAL REQUIREMENTS

A. Section 01 61 00 – Product Requirements: Environmental conditions affecting products on site.

B. Do not place grout when air temperature is below freezing.

C. Do not place concrete when base surface temperature is less than 40 degrees F, or surface is wet or frozen.

PART 2 - PRODUCTS

2.1 ROCK AND GEOTEXTILE MATERIALS

A. Geotextile Separation Fabric:

1. Description:

a. Non-biodegradable, UV-resistant, nonwoven geotextile fabric.

Herbert, Rowland & Grubic, Inc. 31 25 00 - 3 000483.0450

b. Material: Polypropylene.

c. Edges: Selvaged or finished to prevent separation of outer material.

d. Calendar such that yarns will retain relative positions.

2. Performance and Design Criteria:

a. Minimum Unseamed Sheet Width: 15 feet.

b. Nominal Weight: 12 oz./sq. yd..

c. Minimum Sheet Thickness: 120 mils.

d. Apparent Opening Size:

1) No. 100 U.S. standard sieve size.

2) Comply with ASTM D4751.

e. Vertical Water Flow Rate:

1) 70 gpm/sq. ft., minimum average roll value.

2) Comply with ASTM D4491/D4491M.

f. Grab Tensile Strength:

1) 270 lbf, minimum average roll value.

2) Comply with ASTM D4632/D4632M.

g. Grab Tensile Elongation:

1) 50 percent, minimum average roll value.

2) Comply with ASTM D4632/D4632M.

h. Trapezoidal Tear Strength:

1) 125 lbf, minimum average roll value.

2) Comply with ASTM D4533/D4533M.

i. Puncture Strength:

1) 100 lbf, minimum average roll value.

2) Comply with ASTM D4833/D4833M.

j. UV Resistance at 500 Hours:

1) Strength Retention: 70 percent.

2) Comply with ASTM D4355/D4355M.

2.2 BLOCK, AGGREGATE, AND SOIL MATERIALS

A. Coarse Aggregate: as specified in Section 32 05 16.

B. Soil Backfill: Suitable backfill, as specified in Section 32 05 13.

2.3 PLANTING MATERIALS

A. Erosion Control Mulch Blanket.

1. Organic Mulch Material. Machine produced mat of organic, biodegradable mulch material evenly distributed and attached on one side of a photodegradable polypropylene mesh with high-strength threads conforming to the following physical properties:

a. Weight 8 ounces per square yard, minimum

b. Mat thickness Approximately 0.125 inch to 0.6 inch

2. Reprocessed Wood Fiber. Flexible, non-woven, biodegradable water absorbing mat of mechanically defibrated wood fibers and synthetic fibers with a photodegradable polypropylene netting laminated to one side of the mat and conforming to the following physical properties:

a. Weight 6.4 to 7.9 ounces per square yard

b. Mat thickness 0.105 inch, minimum

Herbert, Rowland & Grubic, Inc. 31 25 00 - 4 000483.0450

2.4 PIPE MATERIALS

A. Pipe: Plastic, as specified in Section 33 31 11.

2.5 SEDIMENT BARRIERS

A. Silt Sock

1. Provide filter sock meeting the compost filter sock requirements as shown below.

Material Type 3 mil HDPE 5 mil HDPE 5 mil HDPE Characteristics Photo-degradable Photo-degradable Bio-degradable

Diameters 12”, 18” 12”, 18”, 24”, 32” 12”, 18”, 24”, 32” Mesh Opening 3/8” 3/8” 3/8”

Tensile Strength 26 psi 26 psi UV Stability % Original Strength (ASTM G-155)

23% at 1000 hr. 23% at 1000 hr. 23% at 1000 hr.

Min. Functional Longevity 6 months 9 months 6 months

2. Compost: well-decomposed, stable, weed-free, organic compost derived from agriculture, food, stump grindings, and yard or wood/bark organic matter sources

– aerobically composted with no objectionable odors. Provide compost meeting the compost standards for compost filter socks:

a. Organic Matter Content: 80% - 100% (dry weight basis)

b. Organic Portion: Fibrous and elongated

c. pH: 5.5 - 8.0

d. Moisture Content: 35% - 55%

e. Particle Size : 98% pass through 1” screen

f. Soluble Salt Concentration: Max 5 dS/m (mmhos/cm)

B. High Volume Filter Bags: Made from woven geotextiles that meet the following standards:

1. Avg. Wide Width Strength: min 60 lb/in per ASTM D-4884.

2. Grab Tensile: min 205 lb per ASTM D-4632.

3. Puncture: min 110 lb per ASTM D-4833.

4. Burst: min 350 per ASTM D-3786.

5. UV Resistance: min 70% per ASTM D-4355.

6. AOS % Retained : 80 sieve per ASTM D-4751.

2.6 SOURCE QUALITY CONTROL (AND TESTS)

A. Section 01 40 00 – Quality Requirements: Testing, inspection and analysis requirements.

B. Perform tests on cement, aggregates, and mixes to ensure conformance with specified requirements.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Verification of existing conditions before starting work.

Herbert, Rowland & Grubic, Inc. 31 25 00 - 5 000483.0450

B. Verify compacted subgrade or stabilized soil is acceptable and ready to support devices and imposed loads.

C. Verify gradients and elevations of base or foundation for other work are correct.

3.2 CONSTRUCTION ENTRANCE

A. Clear and grub the footprint of the rock construction entrance.

B. Excavating to depth required, forming embankment.

C. Place geotextile over subsoils and place aggregate.

3.3 SEDIMENT BARRIERS

A. Compost Filter Socks and Weighted Sediment Filter Tubes

1. Prepare placement area by removing all debris.

2. Place parallel to contour with both ends of the sock extended upslope at a 45 degree angle to the rest of the sock to prevent end-arounds.

3. Socks placed on earthen slopes should be anchored with stakes driven through the center of the sock or immediately downslope of the sock at intervals recommended by the manufacturer.

4. Where socks are placed on paved surfaces, concrete blocks should be used immediately downslope of the socks (at the same intervals recommended for the stakes) to help hold the sock in place.

3.4 SITE STABILIZATION

A. Incorporate erosion control devices indicated on the Drawings into the Project at the earliest practicable time.

B. Construct, stabilize and activate erosion controls before site disturbance within tributary areas of those controls.

C. Stockpile and waste pile heights shall not exceed 35 feet. Slope stockpile sides at 2: 1 or flatter.

D. Stabilize any disturbed area of affected erosion control devices on which activity has ceased and which will remain exposed for more than 20 days.

1. During non-germinating periods, apply mulch at recommended rates.

2. Stabilize disturbed areas which are not at finished grade and which will be disturbed within one year.

3. Stabilize disturbed areas which are either at finished grade or will not be disturbed within one year.

E. Stabilize stockpiles immediately.

3.5 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Field inspecting, testing, adjusting, and balancing.

Herbert, Rowland & Grubic, Inc. 31 25 00 - 6 000483.0450

B. Inspect erosion control devices on a weekly basis and after each runoff event. Make necessary repairs to ensure erosion and sediment controls are in good working order.

3.6 CLEANING

A. Section 01 73 00 – Execution Requirements: Requirements for cleaning.

B. When sediment accumulation in sedimentation structures has reached a point one-third depth of sediment structure or device, remove and dispose of sediment.

C. Do not damage structure or device during cleaning operations.

D. Do not permit sediment to erode into construction or site areas or natural waterways.

E. Clean channels when depth of sediment reaches approximately one half channel depth.

3.7 PROTECTION

A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.

END OF SECTION 31 25 00

File details come from the government source that posted it. Updated .