31 23 16 - Excavation.pdf

PDF 468 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a specifications document for excavation work prepared by Herbert, Rowland & Grubic, Inc. for the West Pump Station Replacement Project being administered by Northwestern Chester County Municipal Authority in Pennsylvania. The document outlines the scope of excavation services required, including soil densification, excavation for building and structure foundations, paving, roads, parking areas, slabs-on-grade, site structures such as tanks and manholes, and landscaping. The work encompasses unclassified excavation with no additional payment consideration for material difficulties, and contractors must call Pennsylvania One Call System, Inc. at least three working days prior to work commencement to locate and mark underground utilities. The excavation protection plan must be prepared under the direct supervision of a Professional Engineer licensed in Pennsylvania and include structural calculations. The contractor is responsible for verifying the location and depth of all utilities, maintaining existing services that must remain operational, and recording locations of encountered underground utilities. Excess and unsuitable materials must be removed from the site, and the contractor must underpin adjacent structures that may be damaged and repair items indicated to remain that are damaged during excavation operations.

The specifications establish that field quality control must include visual inspection of bearing surfaces by an inspection agency before subsequent work installation, and inspections of excavation and controlled fill operations must be requested in accordance with applicable codes. The contractor is required to prevent soil displacement, maintain soil stability, protect excavation bottoms and adjacent soil from freezing, and protect all structures, utilities, and facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth operations. Loose matter and trimming requirements must be completed, with rock and boulders up to one-third cubic yard measured by volume to be removed as part of standard excavation, while larger material removal is addressed under Section 31 23 16.26 - Rock Removal. The contractor must notify the Engineer of any unexpected subsurface conditions encountered and correct any over-excavated areas as indicated on project drawings.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 23 16 – EXCAVATION

Herbert, Rowland & Grubic, Inc. 31 23 16 - 1 000483.0450

SECTION 31 23 16 – EXCAVATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Soil densification.

2. Excavating for building/structure foundations.

3. Excavating for paving, roads, and parking areas.

4. Excavating for slabs-on-grade.

5. Excavating for site structures, including tanks and manholes.

6. Excavating for landscaping.

B. Related Sections:

1. Section 31 05 13 – Soils for Earthwork: Stockpiling excavated materials.

2. Section 31 05 16 – Aggregates for Earthwork: Stockpiling excavated materials.

3. Section 31 22 13 – Rough Grading: Topsoil and subsoil removal from site surface.

4. Section 31 23 16.13 – Trenching: Excavating for utility trenches.

5. Section 31 23 16.26 – Rock Removal: Removal of rock during excavating.

6. Section 31 23 23 – Fill.

7. Section 31 23 23.23 – Flowable fill.

1.2 REFERENCES

A. Local utility standards when working within 24 inches of utility lines.

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation required to protect excavations and adjacent structures and property; include structural calculations to support plan.

1.4 QUALIFICATIONS

A. Prepare excavation protection plan under direct supervision of Professional Engineer experienced in design of this Work and licensed at Project location.

1.5 JOB CONDITIONS

A. Existing Utilities and Services

1. Known underground services and utilities are indicated on the Contract Drawings. No guarantee is given to completeness or accuracy. Contractor shall be responsible for verifying the location and/or depth of all utilities and services indicated within the areas of work.

2. Maintain existing utilities which must remain in service in the area of the excavation.

Herbert, Rowland & Grubic, Inc. 31 23 16 - 2 000483.0450

3. Record locations of underground utilities encountered.

B. Unclassified Excavation: No consideration will be given to the nature of materials encountered in excavating operations for structures. Therefore, as unclassified excavation, no additional payment will be made for difficulties occurring in excavating and handling of materials, including rock.

PART 2 - PRODUCTS

2.1 Not Used.

PART 3 - EXECUTION

3.1 PREPARATION

A. Call Pennsylvania One Call System, Inc. at 1-800-242-1776 not less than three working days before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction areas.

B. Identify required lines, levels, contours, and datum.

3.2 EXCAVATION

A. Underpin adjacent structures which may be damaged by excavation work.

B. Excavate subsoil to accommodate building and structure foundations, slabs-on-grade, paving, and site structures, and construction operations.

C. Slope banks with machine to angle of repose or less until shored.

D. Do not interfere with 45 degree bearing splay of foundations.

E. Grade top perimeter of excavation to prevent surface water from draining into excavation.

F. Trim excavation. Remove loose matter.

G. Remove lumped subsoil, boulders, and rock up to 1/3 cu yd measured by volume. Remove larger material as specified in Section 31 23 16.26 – Rock Removal.

H. Notify Engineer of unexpected subsurface conditions.

I. Correct areas over excavated as indicated on the Drawings.

J. Remove excess and unsuitable material from site.

K. Repair or replace items indicated to remain damaged by excavation.

Herbert, Rowland & Grubic, Inc. 31 23 16 - 3 000483.0450

3.3 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Field inspecting, testing, adjusting, and balancing.

B. Request inspection of excavation and controlled fill operations in accordance with applicable code.

C. Request visual inspection of bearing surfaces by inspection agency before installing subsequent work.

3.4 PROTECTION

A. Prevent displacement or loose soil from falling into excavation; maintain soil stability.

B. Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.

C. Protect structures, utilities and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earth operations.

END OF SECTION 31 23 16