31 22 13 - Rough Grading.pdf

PDF 472 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a specification section for rough grading work prepared by Herbert, Rowland & Grubic, Inc. for a construction project in Pennsylvania. The specification outlines the requirements for excavating subsoil, cutting, grading, filling, rough contouring, and compacting site areas for structures as part of the West Pump Station Replacement Project being bid by Northwestern Chester County Municipal Authority. The work includes excavation of subsoil from areas to be regraded, placement of materials in continuous compacted layers with maximum 8-inch depths for subsoil fill, structural fill, and granular fill, maintenance of optimum moisture content, and establishment of minimum 2 percent slope grade away from buildings for a minimum distance of 10 feet. Quality control requirements mandate laboratory material testing in accordance with ASTM D1557 and in-place compaction testing at a frequency of one test per 1,000 square feet for each layer, with work that fails to meet specifications to be removed, replaced, and retested. Surface tolerances are specified at plus or minus 1/10 foot from required elevation.

The specification references Pennsylvania Department of Transportation standards and incorporates materials requirements detailed in related specification sections for topsoil, subsoil fill, structural fill consisting of PennDOT 2A aggregate, and granular fill consisting of AASHTO No. 57 aggregate. Pre-work requirements include calling Pennsylvania One Call System, Inc. at least three working days before beginning work to locate and mark underground utilities, and protection of existing utilities, plant life, landscaping features, bench marks, survey control points, structures, fences, sidewalks, paving, and curbs from damage during excavation and grading operations. The specification requires submittal of materials source information and project record documents accurately recording actual locations and elevations of utilities remaining upon project completion.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 22 13 – ROUGH GRADING

Herbert, Rowland & Grubic, Inc. 31 22 13 - 1 000483.0450

SECTION 31 22 13 – ROUGH GRADING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Excavating subsoil.

2. Cutting, grading, filling, rough contouring, and compacting site for site structures.

B. Related Sections:

1. Section 02 41 16 – Structure Demolition.

2. Section 31 05 13 – Soils for Earthwork: Soils for fill.

3. Section 31 05 16 – Aggregates for Earthwork: Aggregates for fill.

4. Section 31 23 16 – Excavation: Building excavation.

5. Section 31 23 16.13 – Trenching: Trenching and backfilling for utilities.

6. Section 31 23 16.26 – Rock Removal.

7. Section 31 23 23 – Fill: General building area backfilling.

8. Section 32 91 19 – Landscape Grading: Finish grading with topsoil to contours.

1.2 REFERENCES

A. American Association of State Highway and Transportation Officials:

1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils

Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop.

B. ASTM International:

1. ASTM C136 - Standard Test Method for Sieve Analysis of Fine and Coarse

Aggregates.

2. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of

Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3).

3. ASTM D1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method.

4. ASTM D1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3).

5. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method.

6. ASTM D2419 - Standard Test Method for Sand Equivalent Value of Soils and Fine

Aggregate.

7. ASTM D2434 - Standard Test Method for Permeability of Granular Soils (Constant

Head).

8. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in

Place by Nuclear Methods (Shallow Depth).

9. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth).

Herbert, Rowland & Grubic, Inc. 31 22 13 - 2 000483.0450

1.3 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Materials Source: Submit name of imported materials suppliers.

1.4 CLOSEOUT SUBMITTALS

A. Section 01 77 00 – Closeout Requirements: Requirements for submittals.

B. Project Record Documents: Accurately record actual locations of utilities remaining by horizontal dimensions, elevations or inverts, and slope gradients.

1.5 QUALITY ASSURANCE

A. Perform Work in accordance with State of Pennsylvania Department of Transportation standard.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Topsoil: as specified in Section 31 05 13.

B. Subsoil Fill: Suitable Backfill and Embankment Material> as specified in Section 31 05 13.

C. Structural Fill: PennDOT 2A aggregate as specified in Section 31 05 16.

D. Granular Fill: AASHTO No. 57 aggregate as specified in Section 31 05 16.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Verification of existing conditions before starting work.

B. Verify survey bench mark and intended elevations for the Work are as indicated on Drawings.

3.2 PREPARATION

A. Call Pennsylvania One Call System, Inc. at 1-800-242 not less than three working days before performing Work.

1. Request underground utilities to be located and marked within and surrounding construction areas.

B. Identify required lines, levels, contours, and datum.

C. Protect utilities indicated to remain from damage.

Herbert, Rowland & Grubic, Inc. 31 22 13 - 3 000483.0450

D. Protect plant life, lawns, and other features remaining as portion of final landscaping.

E. Protect bench marks, survey control point, existing structures, fences, sidewalks, paving, and curbs from excavating equipment and vehicular traffic.

3.3 SUBSOIL EXCAVATION

A. Excavate subsoil from areas to be further excavated, relandscaped, or regraded.

B. Do not excavate wet subsoil or excavate and process wet material to obtain optimum moisture content.

C. When excavating through roots, perform Work by hand and cut roots with sharp axe.

D. Remove excess subsoil not intended for reuse, from site.

E. Benching Slopes: Horizontally bench existing slopes greater than 1: 4 to key placed fill material to slope to provide firm bearing.

F. Stability: Replace damaged or displaced subsoil as specified for fill.

3.4 FILLING

A. Fill areas to contours and elevations with unfrozen materials.

B. Place material in continuous layers as follows:

1. Subsoil Fill: Maximum 8 inches compacted depth.

2. Structural Fill: Maximum 8 inches compacted depth.

3. Granular Fill: Maximum 8 inches compacted depth.

C. Maintain optimum moisture content of fill materials to attain required compaction density.

D. Slope grade away from building minimum 2 percent slope for minimum distance of 10 ft, unless noted otherwise.

E. Make grade changes gradual. Blend slope into level areas.

F. Repair or replace items indicated to remain damaged by excavation or filling.

3.5 TOLERANCES

A. Section 01 40 00 – Quality Requirements: Tolerances.

B. Top Surface of Subgrade: Plus or minus 1/10 foot from required elevation.

3.6 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Field inspecting, testing, adjusting, and balancing.

Herbert, Rowland & Grubic, Inc. 31 22 13 - 4 000483.0450

B. Perform laboratory material tests in accordance with ASTM D1557.

C. Perform in place compaction tests in accordance with the following:

1. Density Tests: ASTM D2922.

2. Moisture Tests: ASTM D3017.

D. When tests indicate Work does not meet specified requirements, remove Work, replace and retest.

E. Frequency of Tests: One per 1,000 sf for each layer.

END OF SECTION 31 22 13