This is a technical specification document for geotextiles and erosion control materials prepared by Herbert, Rowland & Grubic, Inc. for the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4). Section 31 05 19.13 establishes standards for the procurement and installation of geotextile materials, including turf reinforcement mats (TRMs) and nonwoven geotextile fabric. The specification references industry standards from AASHTO and ASTM International and mandates products from TenCate Geosynthetics, including the Mirafi FW402 (subsurface drainage geotextile), Mirafi HP570 (sediment control geotextile), and Mirafi S1200 (nonwoven geotextile material). All materials must be non-biodegradable, UV-resistant polypropylene-based fabrics with specified performance criteria. The specification details comprehensive requirements for material properties, testing protocols, handling, storage, installation procedures, seam configurations, overlap dimensions, securement methods using pins and staples, and field quality control measures. Installation requirements include minimum unseamed joint overlaps of 18 inches and seamed joint overlaps of 12 inches, with specified spacing for securement pins varying from 24 inches to 5 feet on center depending on slope gradient. Materials must be protected from UV exposure for no more than 14 days after installation and cannot be left uncovered beyond that timeframe.
The specification requires manufacturers to demonstrate a minimum of three years' documented experience, with installers requiring manufacturer approval and equivalent experience credentials. Submittals must include product data certifying compliance with AASHTO M288 specifications, shop drawings indicating fabric layout and seam locations, manufacturer's installation instructions, factory test results, and qualifications statements from both manufacturer and installer. All materials must be delivered in original manufacturer packaging and stored in clean, dry locations protected from moisture and dust. The document establishes detailed testing requirements referenced in ASTM standards covering bursting strength, tensile properties, tear strength, water permeability, UV resistance, seam strength, and durability characteristics. Damaged geotextiles requiring repairs must be patched using identical material extending a minimum of 12 inches beyond the damaged area, with removal and replacement required for unrepairable materials. The specification prohibits operations directly on the geotextile and requires adequate ballast to prevent wind uplift, establishing comprehensive quality assurance and field inspection protocols aligned with the broader water infrastructure replacement project scope.
View the file
Other files
Show 40 more
Latest 50 of 91 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 05 19.13 – GEOTEXTILES FOR EARTHWORK
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 1 009280.0426
SECTION 31 05 19.13 – GEOTEXTILES FOR EARTHWORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Turf reinforcement mats (TRMs).
2. Nonwoven geotextile material.
B. Related Requirements:
1. Section 31 23 33 – Trenching and Backfilling for Utilities
2. Section 31 25 00 – Erosion and Sedimentation Controls: Erosion and sedimentation control devices.
3. Section 32 11 23 – Aggregate Base Courses: Subbase and base course for placement under paving.
1.2 REFERENCE STANDARDS
A. American Association of State Highway and Transportation Officials:
1. AASHTO M288 - Standard Specification for Geotextile Specification for Highway Applications.
B. ASTM International:
1. ASTM D3786 - Standard Test Method for Bursting Strength of Textile Fabrics— Diaphragm Bursting Strength Tester Method
2. ASTM D4355 - Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture and Heat in a Xenon Arc Type Apparatus.
3. ASTM D4491 - Standard Test Methods for Water Permeability of Geotextiles by Permittivity.
4. ASTM D4533 - Standard Test Method for Trapezoid Tearing Strength of Geotextiles.
5. ASTM D4632 - Standard Test Method for Grab Breaking Load and Elongation of
6. ASTM D4751 - Standard Test Method for Determining Apparent Opening Size of a Geotextile.
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 2 009280.0426
7. ASTM D4833 - Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products.
8. ASTM D4873 - Standard Guide for Identification, Storage, and Handling of Geosynthetic Rolls and Samples.
9. ASTM D4884 - Standard Test Method for Strength of Sewn or Bonded Seams of
10. ASTM D4886 - Standard Test Method for Abrasion Resistance of Geotextiles (Sandpaper/Sliding Block Method).
11. ASTM D6524 - Standard Test Method for Measuring the Resiliency of Turf Reinforcement Mats (TRMs).
12. ASTM D6525 - Standard Test Method for Measuring Nominal Thickness of Rolled Erosion Control Products.
13. ASTM D6566 - Standard Test Method for Measuring Mass per Unit Area of Turf Reinforcement Mats.
14. ASTM D6567 - Standard Test Method for Measuring the Light Penetration of a Turf Reinforcement Mat (TRM).
15. ASTM D6575 - Standard Test Method for Determining Stiffness of Geosynthetics Used as Turf Reinforcement Mats (TRMs).
16. ASTM D6818 - Standard Test Method for Ultimate Tensile Properties of Rolled Erosion Control Products.
1.3 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Product Data: Submit manufacturer information including tensile strength, elongation, thickness, UV resistance, and other material specifications.
C. Shop Drawings: Indicate fabric layout, seam locations, and overlap details in installation drawings.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Manufacturer Instructions: Submit detailed instructions on installation requirements, including storage and handling procedures.
F. Source Quality-Control Submittals: Indicate results of factory tests and inspections.
G. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 3 009280.0426
H. Qualifications Statements:
1. Submit qualifications for manufacturer and installer.
2. Submit manufacturer's approval of installer.
1.4 CLOSEOUT SUBMITTALS
A. Section 01 77 00 – Closeout Procedures: Requirements for submittals.
B. Project Record Documents: Record actual locations of geotextile material, including placement depth.
1.5 MAINTENANCE MATERIAL SUBMITTALS
A. Section 01 73 00 – Execution Requirements: Requirements for maintenance materials.
1.6 QUALITY ASSURANCE
A. Perform Work according to Elizabethtown Area Water Authority standards.
B. Maintain one copy of each standard affecting Work of this Section on Site.
1.7 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing products specified in this Section with minimum three years' documented experience.
B. Installer: Company specializing in performing Work of this Section with minimum three years' documented experience and approved by manufacturer.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Comply with ASTM D4873.
D. Store materials according to manufacturer instructions.
E. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 4 009280.0426
PART 2 - PRODUCTS
2.1 SUBSURFACE DRAINAGE GEOTEXTILE
A. Manufacturers:
1. TenCate Geosynthetics – Mirafi FW402
2. Substitutions: As specified in Section 01 61 00 – Product Requirements.
B. Description:
1. Non-biodegradable, UV-resistant, woven geotextile fabric.
2. Material: Polypropylene.
3. Calendar such that yarns will retain relative positions.
C. Performance and Design Criteria:
1. Comply with AASHTO M288.
2.2 SEDIMENT CONTROL GEOTEXTILE MATERIALS
1. TenCate Geosynthetics – Mirafi HP570
2. Substitutions: As specified in Section 01 61 00 – Product Requirements.
1. Non-biodegradable, UV-resistant, woven geotextile fabric.
3. Calendar such that yarns will retain relative positions.
C. Performance and Design Criteria:
1. Comply with AASHTO M288.
2.3 NONWOVEN GEOTEXTILE MATERIALS
1. TenCate Geosynthetics – Mirafi S1200
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 5 009280.0426
2. Substitutions: As specified in Section 01 61 00 – Product Requirements
1. Non-biodegradable, UV-resistant, nonwoven geotextile fabric.
3. Edges: Selvaged or finished to prevent separation of outer material.
4. Calendar such that yarns will retain relative positions.
2.4 ACCESSORIES
A. Sewing Thread:
1. Material: Polypropylene Polyester or Kevlar.
2. Durability: Equal to or greater than durability of geotextile.
B. Securing Pins:
1. Material: Steel rods or bars.
2. Diameter: 3/16 inch.
3. Minimum Length: 12 inches.
4. Washers:
a. Material: Steel.
b. Outside Diameter: Minimum 1-1/2 inches.
c. Inside Diameter: 1/4 inch.
d. Thickness: 1/8 inch.
C. Wire Staples:
1. Material: Steel.
2. Minimum Size: 10 gage.
3. Minimum Length: 6 inches.
2.5 SOURCE QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for testing, inspection, and analysis.
B. Provide shop inspection and testing of completed assembly.
C. Certificate of Compliance:
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 6 009280.0426
1. If manufacturer is approved by authorities having jurisdiction, submit certificate of compliance indicating Work performed at manufacturer's facility conforms to Contract Documents.
2. Specified shop tests are not required for Work performed by approved manufacturer.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.
B. Verify that underlying surface is smooth and free of ruts or protrusions that could damage geotextile material.
3.2 PREPARATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.
B. Subgrade Material and Compaction Requirements: As specified in Section 31 23 33 – Trenching and Backfilling for Utilities
3.3 INSTALLATION
A. Geotextile Material:
1. Lay and maintain smooth and free of tensile stresses, folds, wrinkles, or creases.
2. Ensure that material is in direct contact with subgrade.
3. Orientate with long dimension of each sheet transverse to direction of slope.
4. Minimum Unseamed Joints Overlap: 18 inches.
B. Securement Pins:
1. Insert through geotextile midway between edges of overlaps and minimum 6 inches from free edges.
2. Minimum Spacing:
a. Slopes Steeper than 3 Horizontal on 1 Vertical: 24 inches o.c.
b. Slopes 3 Horizontal on 1 Vertical to 4 Horizontal on 1 Vertical: 3 feet o.c.
c. Slopes Flatter than 4 Horizontal on 1 Vertical: 5 feet o.c.
3. Ensure that washer bears against geotextile.
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 7 009280.0426
3.4
A. Seams:
1. Minimum Seamed Joints Overlap: 12 inches at longitudinal and transverse joints.
2. Seams across Slope: Lap upper panel over lower panel.
3. Sewn Seams:
a. Stitch Type: As recommended by geotextile manufacturer.
b. Tie off thread at the end of each seam to prevent unraveling.
4. Thermal Seams:
a. As recommended by geotextile manufacturer.
b. Comply with ASTM D4886.
B. Penetrations: As recommended by geotextile manufacturer.
C. Repairing Damaged Geotextiles:
1. Repair torn or damaged geotextile by placing patch of same type of geotextile over damaged area minimum of 12 inches beyond edge of damaged area, and fasten as recommended by geotextile manufacturer.
2. Remove and replace geotextile rolls which cannot be repaired.
D. Fill and Cover:
1. Place fill to prevent tensile stress or wrinkles in geotextile.
2. Place fill from bottom of side-slopes upward.
3. Do not drop fill from height greater than 3 feet.
3.5 FIELD QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.
3.6 PROTECTION
A. Section 01 73 00 – Execution Requirements: Requirements for protecting finished Work.
B. Ballast: Adequate to prevent uplift of material by wind.
C. UV Exposure: Do not leave material uncovered for more than 14 days after installation.
D. Do not use staples or pins to hold geotextiles in place where located adjacent to other geosynthetic layers that could be damaged.
Herbert, Rowland & Grubic, Inc. 31 05 19.13 - 8 009280.0426
E. Do not operate equipment directly on top of geotextile.
END OF SECTION 31 05 19.13