This is a Field Engineering specification document for the West Branch Regional Authority's Route 54 Sanitary Sewer Extension Project, Contract No. WB-1, located in Clinton Township, Lycoming County, Pennsylvania. The project requires field engineering services including survey work and professional engineering support for the construction of approximately 1,520 linear feet of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing, and associated surface restoration and appurtenances. Sealed bids are due online at http://pennbid.net/ by 1:00 PM local prevailing time on Monday, February 16, 2026. The field engineer or surveyor must be a registered professional engineer or land surveyor licensed in Pennsylvania or otherwise acceptable to the Owner. Key responsibilities include establishing and maintaining survey control points, establishing temporary benchmarks, laying out site improvements and utility locations, verifying layouts throughout construction, and preparing certified surveys upon completion documenting all dimensions, locations, angles, and elevations of construction work.
The contractor must submit the name, address, and qualifications of the registered surveyor and professional engineer prior to commencing work and provide certification that elevations and locations conform to contract documents upon completion. A bid bond equal to ten percent of the total bid amount is required as security for proper execution of the agreement. The work is subject to prevailing minimum project wage rates as established by the Pennsylvania Department of Labor and Industry and is subject to the Pennsylvania Steel Products Procurement Act of 1978. Prospective bidders are urged to register as plan holders on PennBid, which will be updated periodically with addenda and other project information. The Owner and Engineer will not be responsible for bid documents obtained from sources other than PennBid.
View the file
Other files
Show 40 more
Latest 50 of 75 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01050
FIELD ENGINEERING DIVISION 1
West Branch Regional Authority 01050-1 January 2026 Route 54 Sanitary Sewer Extension Project Field Engineering Contract No. WB-1
PART 1 - GENERAL
1.01 DESCRIPTION OF WORK
A. Provide and pay for field engineering services required for the Project.
1. Survey work required in execution of the Project.
2. Civil, structural, or other professional engineering services specified, or required to execute Contractor's construction methods.
B. Owner's Representative will identify existing control points and property line corner stakes indicated on the Drawings, as required.
C. Related requirements in other Parts of the Contract Documents.
1. Section 00700: Standard General Conditions.
D. Related requirements specified in other Sections of these General Specifications:
1. Section 01720: Project Record Documents.
1.02 QUALIFICATIONS OF SURVEYOR OR ENGINEER
A. Registered professional engineer or land surveyor licensed in the Commonwealth of Pennsylvania and/or an individual acceptable to Owner. Registered professional engineer shall be of the discipline required for specific service on the Project.
1.03 SURVEY REFERENCE POINTS
A. Existing basic horizontal and vertical control points for the Project are those designated on the Drawings.
B. Locate and protect control points prior to starting site work and preserve all permanent reference points during Construction.
1. Make no changes or relocations without prior written notice to Engineer.
2. Report to Engineer when any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations.
3. Require surveyor to replace Project control points which may be lost or destroyed.
a. Establish replacements based on original survey control.
SECTION 01050
FIELD ENGINEERING DIVISION 1
West Branch Regional Authority 01050-2 January 2026 Route 54 Sanitary Sewer Extension Project Field Engineering Contract No. WB-1
1.04 PROJECT SURVEY REQUIREMENTS
A. Establish temporary benchmarks on the site, as required, referenced to data established by survey control points.
1. Record locations, with horizontal and vertical data, on Project Record Documents.
B. Establish lines and levels, locate and lay out, by instrumentation and similar appropriate means:
1. Site improvements.
a. Stakes for grading, fill and topsoil placement.
b. Utility slopes and invert elevations.
2. Batter boards for structures.
3. Building foundation, column locations, and floor levels.
4. Controlling lines and levels required for the mechanical and electrical trades.
C. From time to time, verify layouts by the same methods.
1.05 RECORDS
A. Maintain a complete, accurate log of all control and survey work as it progresses.
B. On completion of foundation walls and major site improvements, prepare a certified survey showing all dimensions, locations, angles, and elevations of construction.
1.06 SUBMITTALS
A. Submit name, address, and qualifications of registered surveyor and professional engineer to Engineer.
B. On request of Engineer, submit documentation to verify accuracy of field engineering work.
C. Submit certificate signed by registered engineer or surveyor certifying that elevations and locations of improvements are in conformance, or nonconformance, with Contract Documents.
PART 2 - PRODUCTS
NOT APPLICABLE
PART 3 - EXECUTION
NOT APPLICABLE