10 21 13 - Toilet Compartments.pdf

PDF 475 KB Posted

Attached to
West Pump Station Replacement Project
Solicitation number
Not on record
Issued by
Chester County, Pennsylvania

About this file

This is a specification document for toilet compartments related to the West Pump Station Replacement Project being managed by Northwestern Chester County Municipal Authority in Pennsylvania. The specification details the requirements for metal toilet compartments to be installed as part of the project's general construction work (Contract WPS-1). The compartments must be baked enameled, floor-mounted, head rail braced units with sheet steel faces pressure-bonded to sound-deadening cores. Doors and panels must measure 32 inches wide by 58 inches high with a 1-inch thickness, while pilasters must be 1.25 inches thick. Acceptable manufacturers include All American Metal Corp., Bradley Corp., General Partitions Mfg., or equal alternatives. The specification requires submission of product data, shop drawings indicating partition plans and elevation views, manufacturer's instructions, and field quality-control results. A five-year manufacturer's warranty is required for powder-coat finishes, and contractors must provide one set of manufacturer-recommended spare parts and special maintenance tools upon completion.

Material requirements specify ASTM A653 steel sheet with G90 zinc coating for the compartment faces, with pilaster shoes formed from ASTM A666 Type 304 stainless steel. The finish must be powder-coated enamel applied in two coats following phosphatizing treatment, with color selection by the Owner. Hardware components including hinges, latches, brackets, and attachments must be chrome-plated or stainless steel, tamper-proof construction with self-closing pivot hinges and adjustable door positioning. Installation requirements mandate maximum spacing of 0.5 inches between panels and pilasters and 1 inch between panels and walls, with brackets securely attached to walls using appropriate anchoring devices. Field quality control procedures require review of any finish touch-ups with the Engineer prior to repair initiation, and all hardware must be adjusted to maintain uniform clearance not exceeding 1/8 inch at door edges.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10 21 13 – TOILET COMPARTMENTS

Herbert, Rowland & Grubic, Inc. 10 21 13 - 1 000483.0450

SECTION 10 21 13 – TOILET COMPARTMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Metal toilet compartments.

B. Related Requirements:

1. Section 10 28 00 – Toilet, Bath, and Laundry Accessories.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM A653 - Standard Specification for Steel Sheet, Zinc Coated (Galvanized) or

Zinc Iron Alloy Coated (Galvannealed) by the Hot Dip Process.

2. ASTM A666 - Standard Specification for Annealed or Cold-Worked Austenitic

Stainless Steel Sheet, Strip, Plate, and Flat Bar.

1.3 COORDINATION

A. Section 01 31 13 – Project Coordination: Requirements for coordination.

B. Coordinate Work with placement of support framing and anchors in wall.

1.4 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Product Data: Submit data on panel construction, hardware, accessories, and available colors.

C. Shop Drawings: Indicate partition plan, elevation views, dimensions, door swings, details of wall and floor supports, and anchorage types.

D. Manufacturer's Instructions: Submit special procedures, and perimeter conditions requiring special attention.

E. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.

1.5 MAINTENANCE MATERIAL SUBMITTALS

A. Section 01 73 00 – Execution Requirements: Requirements for maintenance materials.

B. Spare Parts:

1. Furnish one set of manufacturer's recommended spare parts.

C. Tools: Furnish special wrenches and other devices required for Owner to maintain panels

Herbert, Rowland & Grubic, Inc. 10 21 13 - 2 000483.0450 and hardware.

1.6 EXISTING CONDITIONS

A. Field Measurements: Verify field measurements prior to fabrication. Indicate field measurements on Shop Drawings.

1.7 WARRANTY

A. Section 01 78 36 – Warranty Requirements specifies requirements for warranties.

B. Furnish five-year manufacturer's warranty for powder-coat finishes.

PART 2 - PRODUCTS

2.1 METAL TOILET COMPARTMENTS

A. Manufacturers:

1. All American Metal Corp., Bradley Corp., General Partitions Mfg., or equal.

B. Toilet Compartments: baked enameled, floor mounted, head rail braced.

C. Doors, Panels, and Pilasters: Sheet steel faces, pressure bonded to sound-deadening core, formed and closed edges, mitered and welded corners ground smooth.

1. Panel and Door Faces: 22 gage.

2. Pilaster Faces: 18 gage.

3. Reinforcement: 12 gage.

4. Internal Reinforcement: Furnish in areas of attached hardware and fittings. Mark locations of reinforcement for partition-mounted washroom accessories.

D. Door and Panel Dimensions:

1. Thickness: 1 in.

2. Door Width: 32 in., out swinging.

3. Height: 58 in.

E. Pilasters: 1-1/4 in thick, of sizes required to suit compartment width and spacing.

2.2 MATERIALS

A. Steel Sheet: ASTM A653, with G90 zinc coating.

2.3 FINISHES

A. Powder-Coated Enamel Steel Compartments: Cleaned, degreased, and neutralized, followed immediately with phosphatizing treatment, prime coat, and two finish coats of electrostatically applied baked enamel.

B. Color: Single color as selected by Owner

Herbert, Rowland & Grubic, Inc. 10 21 13 - 3 000483.0450

2.4 ACCESSORIES

A. Pilaster Shoes:

1. Formed ASTM A666, Type 304 stainless steel with No. 4 finish, concealing floor fastenings.

2. Provide adjustment for floor variations with screw jack through steel saddles integral with pilaster.

B. Head Rails: Hollow anodized aluminum tube, 1 x 1-5/8 in size, with cast socket wall brackets.

C. Brackets:

1. Polished chrome-plated, non-ferrous cast metal

D. Attachments, Screws, and Bolts: Stainless steel, tamper-proof type.

1. For Attaching Panels and Pilasters to Brackets: Through-bolts and nuts, tamper-proof.

E. Hardware: Chrome-plated, non-ferrous cast metal.

1. Self closing, pivot hinges, gravity type, adjustable for door close positioning; two for each door.

2. Nylon bearings.

3. Thumb-turn door latch with exterior emergency access feature.

4. Paddle-style door latch for accessible compartments.

5. Door strike and keeper with rubber bumper; mounted on pilaster in alignment with door latch.

6. Coat hook with rubber bumper; one for each compartment, mounted on door.

7. Furnish door pull for out-swinging doors.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

B. Verify field measurements are as indicated on Shop Drawings.

C. Verify correct spacing of and between plumbing fixtures.

D. Verify correct location of built-in framing, anchorage, and bracing.

3.2 INSTALLATION

A. Maintain maximum of 1/2 in space between panels and pilasters, and 1 in between panels and walls.

B. Attach panel brackets securely to walls using anchor and expansion devices appropriate to wall materials.

C. Attach panels and pilasters to brackets using two brackets per panel. Align bracket

Herbert, Rowland & Grubic, Inc. 10 21 13 - 4 000483.0450 locations to greatest extent possible. Locate head rail joints at pilaster center lines.

3.3 ERECTION TOLERANCES

A. Section 01 40 00 – Quality Requirements: Requirements for tolerances.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.

B. Review proposed field touch-up of scratches or damaged finish with Engineer prior to initiating repair. Where conditionally approved, use manufacturer-provided repair materials and procedures. Replace all unacceptable field-repaired finishes with new materials.

3.5 ADJUSTING

A. Section 01 73 00 – Execution Requirements: Requirements for testing and adjusting.

B. Adjust and align hardware to uniform clearance at vertical edge of doors, not exceeding 1/8 in.

C. Adjust hinges to position doors in partially opened position when unlatched. Return out swinging doors to closed position.

D. Adjust adjacent components for consistency of line or plane.

3.6 CLEANING

A. Section 01 73 00 – Execution Requirements: Requirements for cleaning.

B. Clean partition and screen surfaces with materials and cleansers according to manufacturer's recommendations.

END OF SECTION 10 21 13