About this file

This is a technical specification document for Section 06 11 20 - Framing and Sheathing, prepared by Herbert, Rowland & Grubic, Inc., for the West Pump Station Replacement Project in Northwestern Chester County, Pennsylvania. The specification establishes standards for miscellaneous framing and sheathing work, including purlins, girts, headers, skirt boards, and posts, and references related requirements for rough carpentry and shop-fabricated wood trusses. The document mandates plywood roof sheathing with APA Rated Sheathing and Span Rating 24" (5/8" thick in 48 x 96 inch sheets) and wall sheathing with Span Rating 16" (½" thick in 48 x 96 inch sheets). Framing materials must comply with DOC PS 20 standards and include Hem-Fir or SPF #2 and better lumber for nominal sizes up to 2 x 4, with Southern Yellow Pine #2 and better required for treated lumber. All materials must be certified, delivered level and protected from damage, stored off ground and under cover to maintain dryness, and handled in accordance with Section 01 40 00 Quality Requirements.

Execution requirements specify that structural members must be set level and plumb with proper temporary bracing, horizontal members placed with crown side up, and sill gaskets installed directly on cementitious foundations with punctures fitted tight to anchor bolts. Roof sheathing must be fastened perpendicular to framing members with staggered ends and ends over firm bearing, using sheathing clips between sheets and #10 screws at 6" on center for cold-formed steel rafter/joists. Wall sheathing must be secured with long dimension parallel to wall studs and ends over firm bearing, fastened to APA standards unless a nailing schedule is provided on project drawings. Framing members are subject to a tolerance of ½" from true position, maximum. Submittals require manufacturer's/fabricator's certificates and compliance with submittal procedures outlined in Section 01 33 00.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 06 11 20 – FRAMING AND SHEATHING

Herbert, Rowland & Grubic, Inc. 06 11 20 - 1 000483.0450

SECTION 06 11 20 – FRAMING AND SHEATHING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Miscellaneous framing and sheathing.

a. Purlins, girts, headers, skirt boards, posts.

B. Related Requirements:

1. Section 06 10 00 – Rough Carpentry: Wood blocking, plating, support members, framing for openings, and framing of openings between trusses.

2. Section 06 17 53 – Shop-Fabricated Wood Trusses.

1.2 REFERENCES

A. APA: American Plywood Association.

B. NFPA: National Forest Products Association.

C. SPIB: Southern Pine Inspection Bureau.

1.3 COORDINATION

C. Coordinate placement of blocking, framing for openings, trusses with Work of this Section.

1.4 SUBMITTALS

A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.

B. Manufacturer's/Fabricator's Certificate: Certify that products meet or exceed specified requirements.

1.5 QUALITY ASSURANCE

A. Perform Work as follows:

1. Lumber Grading: Certified by DOC PS 20.

2. Plywood Grading Agency: Certified by APA/EWA.

3. Lumber: Comply with DOC PS 20.

4. Wood Structural Panels: DOC PS 1 or DOC PS 2.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, protect, and handle products to site under provisions of Section 01 40 00 – Quality Requirements.

B. Handle to avoid damage to materials including corners, edges, and faces. Store level using

Herbert, Rowland & Grubic, Inc. 06 11 20 - 2 000483.0450 blocking on uneven ground and to keep materials off ground and damp surfaces. Store materials under cover to keep dry.

1.7 EXISTING CONDITIONS

A. Field Measurements:

1. Verify field measurements.

PART 2 - PRODUCTS

2.1 SHEATHING MATERIALS

A. Plywood Roof Sheathing: APA Rated Sheathing, Span Rating 24"; Exposure 1, unsanded.

B. Wall Sheathing: APA Rated Sheathing Span Rating 16”; Exposure 1.

2.2 SHEATHING AND UNDERLAYMENT LOCATIONS

A. Roof Sheathing: 5/8" thick (or as noted on drawings), 48 x 96 inch sized sheets, square edges.

B. Walls: ½” thick, 48 x 96 inch, square edges.

2.3 FRAMING MATERIALS

A. Lumber for framing, blocking, nailers, and similar members:

1. NIST PS 20.

2. Treated material species: As indicated in the appropriate AWPA Standard and as required to achieve UL Rating Listed herein.

3. Grade:

a. For nominal sizes up to and including 2 X 4: Hem-Fir or SPF #2 and better.

b. For nominal sizes up to 2” thick and wider than 4”: Hem-Fir or SPF #2 and better.

c. For treated lumber: Southern Yellow Pine #2 and better.

2.4 ACCESSORIES

A. Fasteners and Anchors:

B. Fasteners: Hot-dipped galvanized steel for high humidity and treated wood locations, unfinished steel elsewhere.

PART 3 - EXECUTION

3.1 FRAMING

Herbert, Rowland & Grubic, Inc. 06 11 20 - 3 000483.0450

A. Set structural members level and plumb, in correct position.

B. Make provisions for erection loads, and for sufficient temporary bracing to maintain structure safe, plumb, and in true alignment until completion of erection and installation of permanent bracing.

C. Place horizontal members flat, crown side up.

D. Place sill gasket directly on cementitious foundation. Puncture gasket clean and fit tight to protruding foundation anchor bolts.

3.2 SHEATHING

A. Secure roof sheathing perpendicular to framing members with ends staggered and sheet ends over firm bearing. Use sheathing clips between sheets between roof framing members. Fasten to APA standards unless nailing schedule is provided on drawings.

B. Fasten to cold formed steel rafter/joists with #10 screws 6” on center.

C. Secure wall sheathing with long dimension parallel to wall studs, with ends and edges over firm bearing. Fasten to APA standards unless nailing schedule is provided on drawings.

3.3 TOLERANCES

A. Framing Members: ¼” from true position, maximum.

END OF SECTION 06 11 20