About this file

This is a technical specification document for rough carpentry work prepared by Herbert, Rowland & Grubic, Inc. for the West Pump Station Replacement Project, a construction initiative by Northwestern Chester County Municipal Authority in Pennsylvania. The specification outlines requirements for rough lumber, carpentry, and engineered wood products, including lumber framing, blocking, nailers, furring, and grounds for the pump station building and site improvements. The document references industry standards from the American Wood Preservers Association, APA - The Engineered Wood Association, ASTM International, and the National Institute of Standards and Technology. Submittals of product data and shop drawings are required per Section 01 33 00, and work must be coordinated according to Section 01 31 13 project coordination requirements. Bids for the general construction contract (WPS-1) were due online by Wednesday, May 20, 2026 at 10:00 AM local time, with public bid opening following immediately.

The specification requires lumber materials compliant with NIST PS 20 standards, with grading specifications that include Standard and better for nominal sizes up to 2x4, and #2 and better for sizes up to 2 inches thick and wider than 4 inches. Preservative-treated material must be provided for all wood used outside the building or below grade, with field treatment of cuts and holes performed per AWPA M4 standards. Installation requirements mandate hot-dipped galvanized steel fasteners for high humidity and treated wood locations, secure anchoring to support applied loading, and proper shimming and leveling. The document specifies that wood exposed to moisture must dry completely before covering, and any wood showing bowing, warping, or twisting must be corrected or replaced to provide a suitable substrate for subsequent materials.

View the file

Other files

File Type Posted
40 05 53 - Identification For Process Piping.pdf PDF
44 42 56 - Base Mounted Pumping System.pdf PDF
32 31 13 - chain link fences and gates.pdf PDF
32 05 13 - Soils For Exterior Improvements.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
40 05 19 - Ductile Iron Process Pipe.pdf PDF
04 05 13 - Masonry Mortaring.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
07 31 13 - asphalt shingles.pdf PDF
00 65 16 - Certificate of Substantial Completion.pdf PDF
01 57 28 - Temporary Flow Control.pdf PDF
26 27 16 - Electrical Panels & Enclosures.pdf PDF
01 31 19 - Project Meetings.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 32 16 - Construction Progress Schedule - SMALL.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
40 66 16 - Firewall Hardware.pdf PDF
33 31 11 - Public Sanitary Sewerage Gravity Piping.pdf PDF
04 20 00 - Unit Masonry.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
07 71 23 - Manufactured Gutters and Downspouts.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
41 22 23.19 - Monorail Electric Chain Hoists with Manual Geared Trolley.pdf PDF
00 41 16.b - Bid Frm for Const Contract 2018 - EC.pdf PDF
26 05 26 - Grounding.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
40 05 78.29 - Combination Air Valves For Wastewater Service.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
00 45 46 Public Works Employment Verification Form.pdf PDF
40 05 61 - Gate Valves.pdf PDF
31 05 16 - aggregates for earthwork.pdf PDF
09 91 00 Painting.pdf PDF
08 13 13 - Standard Hollow Metal Doors.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
40 05 51 - Common Requirements For Process Valves..pdf PDF
00 73 43-1 - Certification Form llc-25 PA Dep L&I.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
34 71 13 - Vehicle Barriers.pdf PDF
04 01 20 - Masonry Cleaning.pdf PDF
00 73 36 - Equal Employment Opportunity Requirements.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 61 13.16 - Payment Bond.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
08 90 00 - LOUVERS AND VENTS.pdf PDF
40 05 63 - Ball Valves.pdf PDF
26 05 00 - Electrical General.pdf PDF
Show 40 more

Latest 50 of 171 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 06 10 00 – ROUGH CARPENTRY

Herbert, Rowland & Grubic, Inc. 06 10 00 - 1 000483.0450

SECTION 06 10 00 – ROUGH CARPENTRY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Rough Lumber and Carpentry

2. Engineered Wood Products – LVL’s

B. Related Requirements:

1. Section 06 17 53 – Shop-Fabricated Wood Trusses.

2. Section 06 11 20 – Framing and Sheathing.

1.2 REFERENCES

A. American Wood Preservers Association (AWPA) Book of Standards

B. American Wood Preservers Association (AWPA) Use of Category System

C. APA – The Engineered Wood Association (APA) PRP-108, Performance Standards and

Qualification Policy for Structural Use Panel

D. APA U450D, Storage and Handling of APA Trademarked Panels

E. APA Y510T, Plywood Design Specification.

F. ASTM D2559, Standard Specification for Adhesives for Bonded Structural Wood Products for Use Under Exterior Exposure Conditions.

G. ASTM D2898, Standard Testing Methods for Accelerated Weathering of Fire-Retardant-

Treated Wood for Fire Testing.

H. ASTM D4442, Standard Test Methods for Direct Moisture Content Measurement of

Wood and Wood-Base Materials

I. ASTM D4444, Standard Test Methods for Use and Calibration of Hand-Held Moisture

Meters

J. ASTM D5456, Standard Specification for Evaluation of Structural Composite Lumber

Products.

K. ASTM E84, Test Method for Surface Burning Characteristics of Building Materials.

L. Underwriters Laboratories, Inc. (UL) 723, UL Standard for Safety Test for Surface Burning

Characteristics of Building Materials.

Herbert, Rowland & Grubic, Inc. 06 10 00 - 2 000483.0450

M. U.S. Department of Commerce, National Institute of Standards and Technology (NIST):

PS 1, Construction and Industrial Plywood

N. NIST PS 2, Performance Standard for Wood-Based Structural Use Panels

O. NIST PS 20, American Softwood Lumber Standard.

1.3 SUBMITTALS

A. Product Data and Shop Drawings: Submit under provisions of Section 01 33 00 – Submittal Procedures.

1.4 QUALITY ASSURANCE

A. Manufacturer's Qualifications:

1. Wood Treatment Plant: AWPA M3.

2. Treated Wood Inspection: AWPA M2.

B. Factory Lumber Marking:

1. ldentify type, grade, moisture content, inspection service, producing mill, and other qualities specified.

2. Marking may be omitted, as allowed by Building Code, if certificate of inspection is provided for each shipment.

1.5 SEQUENCING

A. Coordinate work under provisions of Section 01 31 13 – Project Coordination.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Lumber (for framing, blocking, nailers, furring, grounds and similar members):

1. NIST PS 20

2. As indicated in the appropriate AWPA Standard and as required to achieve UL rating listed herein.

3. Grade:

a. For nominal sizes up to and including 2 X 4: Standard and better.

b. For nominal sizes up to 2” thick and wider than 4”: #2 and better.

PART 3 - EXECUTION

3.1 PREPARATION

Herbert, Rowland & Grubic, Inc. 06 10 00 - 3 000483.0450

A. Verify measurements, dimensions, and shop drawing details before proceeding.

B. Coordinate location of furring, nailers, blocking, grounds and similar supports for attached work.

C. Eliminate sharp projections which would puncture roofing, flashing or underlayment material.

3.2 ERECTION AND INSTALLATION

A. General:

1. Provide treated material in accordance with appropriate AWPA standard for intended end use.

2. Provide preservative treated material for all wood used:

a. Outside building.

b. Below grade.

3. Field treat cuts and holes in preservative and fire-retardant treated material in accordance with AWPA M4.

B. Attach work securely by anchoring and fastening as indicated or required to support applied loading.

1. Provide washers under bolt heads and nuts.

2. Fasten plywood in accordance with APA recommendations.

3. Use hot-dipped galvanized steel for high humidity and treated wood locations, unfinished steel elsewhere.

4. Use common wire nails or screws for general work.

5. Use fasteners of size that will not penetrate members where opposite side will be exposed to view or receive finish materials.

6. Install fasteners without splitting of wood; predrill as required.

7. Do not drive threaded friction type fasteners.

8. Tighten bolts and lag screws at installation and retighten as required.

C. Set work to required levels and Iines, plumb, true.

1. Shim as required.

2. Cut and fit accurately.

D. Provide wood grounds, nailers, or blocking where required for attachment of other work and surface applied items. Form to shapes indicated or required

1. Grounds:

a. Dressed, key beveled lumber minimum 1-1/2” wide of thickness required to bring face of ground even with finish material.

b. Remove temporary grounds when no longer required.

2. Install roofing nailers as indicated:

a. Install per roofing manufacturer's recommendations.

b. Match height of nailers to insulation.

c. Anchor nailers to resist force of 75 PLF.

d. Use minimum of three anchors for each nailer with ½” vent spaces

Herbert, Rowland & Grubic, Inc. 06 10 00 - 4 000483.0450 between Iengths of nailers.

e. Install nailers over vapor retarder where indicated.

E. Install wood furring plumb and level with closure strips at all edges and openings.

F. When wood has been exposed to moisture allow to completely dry out prior to covering with additional wood or another material.

G. Correct or replace wood which shows bowing, warping or twisting to provide a straight, plumb and level substrate for applications of other materials.