This is a technical specification document for masonry grouting work prepared by Herbert, Rowland & Grubic, Inc., applicable to the West Pump Station Replacement Project in Pennsylvania managed by Northwestern Chester County Municipal Authority. The specification establishes requirements for grout materials and installation procedures for both structural and non-structural masonry applications. The document references industry standards including ASTM International specifications for ready-mixed concrete, Portland cement, grout aggregates, fly ash, and testing methodologies, as well as The Masonry Society's building code requirements. Key products specified include masonry grout from approved manufacturers (Glen-Gery Corporation, Lafarge North America Inc., or Lehigh Hanson), with provisions for manufacturer substitutions. The grout specifications require a compressive strength of 2,500 psi at 28 days and a slump of 8 to 11 inches for both structural and non-structural masonry applications, with coarse grout designated for spaces with minimum 4-inch dimensions and fine grout for other spaces. Materials must comply with specified ASTM standards, including Type I Portland cement and clean, potable water.
Installation requirements mandate compliance with The Masonry Society standards, with mixing performed either through transit-mixed grout per ASTM C94 or site-mixed grout per ASTM C476. Field quality control testing includes compressive strength and slump tests conducted in accordance with ASTM standards, with a minimum testing frequency of one test per 5,000 square feet of grouted wall area and at minimum one test per building. The specification requires that all block cores containing reinforcing bars be grouted solid, and all walls containing reinforcing bars are classified as structural masonry. Cold weather work must comply with standards if ambient temperature or masonry unit temperature falls below 40 degrees Fahrenheit, while hot weather provisions apply when ambient temperature exceeds 100 degrees Fahrenheit or exceeds 90 degrees Fahrenheit with wind velocity greater than 8 mph. Materials must be delivered in original manufacturer packaging, stored in clean dry locations protected from moisture and dust, and handled according to manufacturer instructions.
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
04 05 16 – MASONRY GROUTING
Herbert, Rowland & Grubic, Inc. 04 05 16 - 1 000483.0450
SECTION 04 05 16 – MASONRY GROUTING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes: Grout for masonry.
B. Related Requirements:
1. Section 04 20 00 – Unit Masonry: Installation of grout.
1.2 REFERENCE STANDARDS
A. ASTM International:
1. ASTM C94 - Standard Specification for Ready-Mixed Concrete.
2. ASTM C143 - Standard Test Method for Slump of Hydraulic-Cement Concrete.
3. ASTM C150 - Standard Specification for Portland Cement.
4. ASTM C404 - Standard Specification for Aggregates for Masonry Grout.
5. ASTM C476 - Standard Specification for Grout for Masonry.
6. ASTM C595 - Standard Specification for Blended Hydraulic Cements.
7. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural
Pozzolan for Use in Concrete.
8. ASTM C1019 - Standard Test Method for Sampling and Testing Grout.
9. ASTM C1157 - Standard Performance Specification for Hydraulic Cement.
10. ASTM C1314 - Standard Test Method for Compressive Strength of Masonry
Prisms.
B. The Masonry Society:
1. TMS 402/602 - Building Code Requirements and Specification for Masonry
Structures.
1.3 SUBMITTALS
A. Section 01 33 00 – Submittal Procedures: Requirements for submittals.
B. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
C. Test and Evaluation Reports: Submit compliance with grout property requirements according to ASTM C476, component grout materials according to ASTM C476, and test and evaluation reports according to ASTM C1019.
D. Field Quality-Control Submittals: Indicate results of Contractor-furnished tests and inspections.
1.4 QUALITY ASSURANCE
A. Perform Work according to TMS 402/602.
Herbert, Rowland & Grubic, Inc. 04 05 16 - 2 000483.0450
1.5 DELIVERY, STORAGE, AND HANDLING
A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.
B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for damage.
C. Store materials according to manufacturer instructions.
D. Protection:
1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.
2. Provide additional protection according to manufacturer instructions.
1.6 AMBIENT CONDITIONS
A. Section 01 50 00 – Temporary Facilities and Controls: Requirements for ambient condition control facilities for product storage and installation.
B. Cold Weather Requirements: According to TMS 402/602 if ambient temperature or temperature of masonry units is less than 40 degrees F.
C. Hot Weather Requirements: According to TMS 402/602 if ambient temperature is greater than 100 degrees F or if ambient temperature is greater than 90 degrees F with wind velocity greater than 8 mph.
PART 2 - PRODUCTS
2.1 MASONRY GROUT
A. Manufacturers:
1. Glen-Gery Corporation
2. Lafarge North America, Inc.
3. Lehigh Hanson
4. Substitutions: As specified in Section 01 61 00 – Product Requirements.
2.2 MATERIALS
A. Portland Cement: Comply with ASTM C150, Type I.
B. Grout Aggregate: Comply with ASTM C404, fine and coarse.
C. Fly Ash: Comply with ASTM C618.
D. Water: Clean and potable.
Herbert, Rowland & Grubic, Inc. 04 05 16 - 3 000483.0450
2.3 MIXES
A. Grout:
1. Grout for Non-Structural Masonry:
a. Compressive Strength: 2,500 psi at 28 days.
b. Slump: 8 to 11 inches.
c. Mixing: According to ASTM C476, fine, coarse.
2. Grout for Structural Masonry:
a. Compressive Strength: 2,500 psi at 28 days.
b. Slump: 8 to 11 inches.
c. Mixing: According to ASTM C476, fine, coarse.
3. Application:
a. Coarse Grout: Grouting spaces with minimum 4-inch dimension in each direction.
b. Fine Grout: Grouting other spaces.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.
B. Request inspection of spaces to be grouted.
3.2 INSTALLATION
A. Mixing:
1. Transit-mixed grout - Mix grout according to ASTM C94, as modified to use ingredients complying with ASTM C476.
2. Site-mixed grout - Thoroughly mix grout ingredients in quantities needed for immediate use according to ASTM C476.
3. Add admixtures and mix uniformly.
B. Comply with TMS 402/602.
3.3 FIELD QUALITY CONTROL
A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.
B. Testing:
1. Mix: Comply with ASTM C1019 for compressive strength, and comply with ASTM
C143 for slump.
2. Compressive Strength of Mortar, Grout, and Masonry: Comply with ASTM C1314.
3. Frequency: Test for every 5,000 SF of wall area that has grouted units with a minimum of one test for each building.
Herbert, Rowland & Grubic, Inc. 04 05 16 - 4 000483.0450
3.4 SCHEDULE
A. All block cores containing reinforcing bars are to be grouted solid.
B. All walls that have reinforcing bars are Structural Masonry.
END OF SECTION 04 05 16