03 60 00 - Grouting.pdf

PDF 539 KB Posted

Attached to
Water Main Replacement Project Phase 4 Contract No. WR-4
Solicitation number
Not on record
Issued by
Lancaster County, Pennsylvania

About this file

This is a technical specification document for grouting work prepared by Herbert, Rowland & Grubic, Inc., applicable to the Elizabethtown Area Water Authority's Water Main Replacement Project Phase 4 (Contract No. WR-4). The specification section 03 60 00 provides detailed requirements for all grouting materials and installation procedures related to concrete work in the project, including cast-in-place concrete components and structural elements. The grouting work must be performed within ambient temperature conditions of 40 degrees Fahrenheit minimum to 90 degrees Fahrenheit maximum, with materials requiring protection from moisture and dust during storage in clean, dry locations. The specification establishes two primary grout types: Portland cement grout composed of Type II and I/II cement, washed natural sand, and potable water; and nonshrink cementitious grout, a pre-mixed formulation that must meet CRD-C621 Type D standards with compressive strengths of 4,000 psi at one day, 7,000 psi at seven days, and 10,000 to 10,800 psi at 28 days, with initial setting time of approximately two hours and final setting time of approximately three hours.

All grout materials must comply with referenced ASTM International standards including C33 (concrete aggregates), C40 (organic impurities in aggregates), C150 (Portland cement), and C191 (cement setting time), as well as U.S. Army Corps of Engineers CRD-C621 standards for nonshrink grout. Installation requires saturating concrete surfaces with clean water, removing excess moisture, mixing grout in proximity to the work area, and placing grout quickly and continuously without pneumatic pressure or dry-packing methods while preventing air entrainment. Grout must be cured for a minimum of three days in damp conditions following initial set, with leveling shims remaining in place for at least 48 hours after placement. Field quality control and inspection requirements are referenced in section 01 40 00, and all installation must comply with execution requirements outlined in section 01 73 00.

View the file

Other files

File Type Posted
03 30 00 - Cast-in-Place Concrete.pdf PDF
01 78 39 - Tap Card - Project Record Documents.pdf PDF
32 12 16 - Asphalt Paving.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
03 39 00 - Concrete Curing.pdf PDF
01 33 00 - Submittal Procedures.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
00 65 19.19 - Consent of Surety to Final Payment.pdf PDF
01 26 13 - Request for Interpretation.pdf PDF
32 11 23 - Aggregate Base Courses.pdf PDF
00 21 13 - Instructions to Bidders.pdf PDF
00 73 73 - Statutory Requirements.pdf PDF
02 31 00 Subsurface Utility Engineering.pdf PDF
00 01 10 - Table of Contents.pdf PDF
00 65 19.16 - Affidavit of Release of Liens.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 63 36 - Field Order Form.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
00 73 46 - Wage Rate Determination.pdf PDF
00 63 49 - Work Change Directive Form.pdf PDF
01 10 00 - Project Summary.pdf PDF
03 20 00 - Concrete Reinforcing.pdf PDF
00 43 13 - Bid Bond PENAL SUM Form.pdf PDF
00 31 46 - Permits_01 - Phase 4 HOP Application - Sealed.pdf PDF
01 42 00 - References.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 11 13 - Advertisement for Bids.pdf PDF
01 74 19 - Construction Waste Management and Disposal.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
01 32 33 - Photographic Documentation.pdf PDF
31 23 19 - Dewatering.pdf PDF
02 82 33 Removal and Disposal of ACM.pdf PDF
32 91 13 - Soil Preparation.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
01 61 00 - Product Requirements.pdf PDF
00 72 00 - General Conditions 2018.pdf PDF
32 91 19 - Landscape Grading.pdf PDF
00 52 00 - Owner_Contractor Agreement.pdf PDF
33 14 19 - Valves And Hydrants For Water Utility Service.pdf PDF
00 61 13.13 - Performance Bond.pdf PDF
31 23 16.26 - Rock Removal.pdf PDF
01 32 36 - Video Monitoring and Documentation.pdf PDF
01 26 00 - Contract Modifications.pdf PDF
01 40 00 - Quality Requirements.pdf PDF
31 23 23.33 - Flowable Fill.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 45 36 EEO Certificate.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
00 73 43 - Wage Rate Requirements.pdf PDF
Show 40 more

Latest 50 of 91 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03 60 00 – GROUTING

Herbert, Rowland & Grubic, Inc. 03 60 00 - 1 009280.0426

SECTION 03 60 00 – GROUTING

PART 1 - GENERAL

1.1 SUMMARY

A. Related Requirements:

1. Section 03 10 00 – Concrete Forming and Accessories: Form materials, waterstops, and accessories as required to form cast-in-place concrete and maintain structural integrity until stripping.

2. Section 03 30 00 – Cast-in-Place Concrete: Cast-in-place or in-situ concrete for structural building frames, slabs on fill or grade, and other concrete components.

1.2 REFERENCE STANDARDS

A. ASTM International:

1. ASTM C33 - Standard Specification for Concrete Aggregates.

2. ASTM C40 - Standard Test Method for Organic Impurities in Fine Aggregates for Concrete.

3. ASTM C150 - Standard Specification for Portland Cement.

4. ASTM C191 - Standard Test Methods for Time of Setting of Hydraulic Cement by Vicat Needle.

B. U. S. Army Corps of Engineers Concrete Research Division (CRD):

1. CRD-C621 - Non-Shrink Grout.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Section 01 61 00 – Product Requirements: Requirements for transporting, handling, storing, and protecting products.

B. Inspection: Accept materials on Site in manufacturer's original packaging and inspect for dam-age.

C. Store materials according to manufacturer instructions.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 2 009280.0426

D. Protection:

1. Protect materials from moisture and dust by storing in clean, dry location remote from construction operations areas.

2. Provide additional protection according to manufacturer instructions.

1.4 AMBIENT CONDITIONS

A. Section 01 50 00 – Temporary Facilities and Controls: Requirements for ambient condition con-trol facilities for product storage and installation.

B. Maximum Conditions: Do not perform grouting if temperatures exceed 90 degrees F.

C. Minimum Conditions: Maintain minimum temperature of 40 degrees F before, during, and after grouting, until grout has set.

PART 2 - PRODUCTS

2.1 PORTLAND CEMENT GROUT

A. Portland Cement: Comply with ASTM C150, Type II and I/II.

B. Water:

1. Potable.

2. No impurities, suspended particles, algae, or dissolved natural salts in quantities capable of causing:

a. Corrosion of steel.

b. Volume change increasing shrinkage cracking.

c. Efflorescence.

d. Excess air entraining.

C. Fine Aggregate:

1. Washed natural sand.

2. Gradation:

a. Comply with ASTM C33.

b. Represented by smooth granulometric curve within required limits.

3. Free from injurious amounts of organic impurities according to ASTM C40.

D. Mix:

1. Portland cement, sand, and water.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 3 009280.0426

2. Do not use ferrous aggregate or staining ingredients in grout mixes.

2.2 NONSHRINK CEMENTITIOUS GROUT

A. Description:

1. Pre-mixed and ready-for-use formulation requiring only addition of water.

2. Nonshrink, non-corrosive, nonmetallic, non-gas forming, and no chlorides.

B. Performance and Design Criteria:

1. Certified to maintain initial placement volume or expand after set, and to meet following minimum properties when tested according to CRD-C621 for Type D nonshrink grout:

a. Setting Time:

1) Initial: Approximately two hours.

2) Final: Approximately three hours.

3) Comply with ASTM C191.

b. Maximum Expansion: 0.10 to 0.40 percent.

c. Compressive Strength:

1) One-Day: 4,000 psi.

2) Seven-Day: 7,000 psi.

3) 28-Day: 10,000 to 10,800 psi.

4) Comply with CRD-C621.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation examination.

B. Verify areas to receive grout.

3.2 PREPARATION

A. Section 01 73 00 – Execution Requirements: Requirements for installation preparation.

B. Remove defective concrete, laitance, dirt, oil, grease, and other foreign material from concrete surfaces by brushing, hammering, chipping, or other similar means until sound and clean con-crete surface is achieved.

C. Roughen concrete lightly, but not to interfere with placement of grout.

D. Remove foreign materials from metal surfaces in contact with grout.

Herbert, Rowland & Grubic, Inc. 03 60 00 - 4 009280.0426

E. Align, level, and maintain final positioning of components to be grouted.

F. Saturate concrete surfaces with clean water, and then remove excess water.

3.3 INSTALLATION

A. Mixing:

1. Mix grout components in proximity to Work area and transport mixture quickly and in manner not permitting segregation of materials.

B. Placing of Grout:

1. Place grout material quickly and continuously.

2. Do not use pneumatic-pressure or dry-packing methods.

3. Apply grout from one side only to avoid entrapping air.

4. Do not vibrate placed grout mixture or permit placement if area is being vibrated by nearby equipment.

5. Thoroughly compact final installation and eliminate air pockets.

6. Do not remove leveling shims for at least 48 hours after grout has been placed.

C. Curing:

1. Prevent rapid loss of water from grout during first 48 hours by use of approved membrane curing compound or by using wet burlap method.

2. Immediately after placement, protect grout from premature drying, excessively hot or cold temperatures, and mechanical injury.

3. After grout has attained its initial set, keep damp for minimum three days.

3.4 FIELD QUALITY CONTROL

A. Section 01 40 00 – Quality Requirements: Requirements for inspecting and testing.

END OF SECTION 03 60 00