02 - AF IMT 103 Base Civil Engineering Work Clearance Request.pdf

Air Force Form PDF 97 KB Posted

Attached to
Relocate Kirtland Sunshades
Solicitation number
FA3099-22-R-0001
Issued by

About this file

This document contains a Base Civil Engineering Work Clearance Request form and details of a related federal contract opportunity for relocating sunshades at Kirtland Air Force Base in New Mexico.

The form requests clearance to proceed with excavation or utility work, and must be completed and approved prior to starting any work that may disrupt aircraft traffic, base utilities, fire and security systems, or normal base operations. It requires information on the type and location of work, proposed dates, and signatures for approval from various base departments including electrical, steam, water, fire protection, security, safety, and communications.

The related federal contract opportunity is a firm-fixed price solicitation from the Air Force for the removal and reinstallation of two sunshade structures at Kirtland AFB in New Mexico and Laughlin AFB in Texas. The NAICS code is 236220 for construction of commercial and institutional buildings with a small business size standard of $39.5 million. The solicitation will be set aside for small businesses and is available electronically, with proposals due as specified once released. Award is anticipated as a firm-fixed price contract.

View the file

Other versions and copies of AF Form 103

File Revision Posted Attached to
Attachment 3 AF Form 103 FA309925Q0006 Version 2.pdf Version 2 Tree Removal BPA
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
30 - AF Form 103 Base Civil Engineering Work Clearance Request - 01 Aug 1994.pdf Aug 1, 1994 SABER IDIQ
Attachment 3 AF Form 103.pdf Revision not stated Tree Trimming and Removal BPA
Appendix A - AF Form 103 - Work Clearance Request.pdf Revision not stated Right of Way Vegetation Clearing - Joint Base Charleston
Atch 19-APPENDIX 17 AF Form 103 - Dig Permit.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 47-AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
Atch 20-APPENDIX 18 AF Form 103 - Outage Request.pdf Revision not stated Nellis AFB Paving IDIQ
08 FA489725B0008 AF Form 103 Work Clearance Request.pdf Revision not stated Repair Building 1330 Main Sewage Line
13 AF Form 103 Work Clearance Request.pdf Revision not stated Construct T-1A Static Display
ATT 10_AF Form 103.pdf Revision not stated Indefinite Delivery/Indefinite Quantity (IDIQ) Western-Range Operational Ordering Contract for Infrastructure Enhancement (WOOKIE) Multiple Award Construction Contract (MACC) at Vandenberg Space Force Base, California
SOW Attach 8 - AF Form 103.pdf Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 24 AF FORM 103 Work Clearance.pdf Revision not stated Fiber Optic Cable Install - Qty 6
K. AF IMT 103 Base Civil Engineering Work Clearance Request.pdf Same revision and size as this file Revision not stated Repair_Replace Liner, Wastewater Lagoon One
3ac. Appendix C - AF Form 103.pdf Revision not stated Tree Removal and Trimming at Yokota and GSUs, Japan
Attachment 6 - Blank AF Form 103 Dig Permit.pdf Revision not stated Laughlin AFB Tree Removal Blanket Purchase Agreement
14. AF Form 103 Base Civil Engineering Work Clearance Request (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Atch 22 APPENDIX 17 AF Form 103 Work Clearance Request.pdf Revision not stated IDIQ Paving
Atch 34 AF Form 103 Base Civil Engineering Work Clearance Request.pdf Revision not stated IDIQ Paving
Atch 21 APPENDIX 17 AF Form 103 Work Clearance Request Guidance.docx Revision not stated IDIQ Paving
Show all 20

Who attaches AF Form 103

Other files

File Type Posted
Attach 37 - B219 Information.pdf PDF
FA309922R0001 Amendment 004.pdf PDF
Attach 36 - CASS Sys As-built.pdf PDF
Attach 35 - Questions and Answers Revised 30 June.pdf PDF
Attach 38 - Rows V and W.pdf PDF
Attach 39 - Disconnect Panel.jpg JPG image
Solicitation Amendment FA309922R00010003 SF 30.pdf PDF
Attach 32 - Past Performance Questionnaire.pdf PDF
Solicitation Amendment FA309922R00010002 SF 30.pdf PDF
Attach 30 - NM20220044 New Mexico Wage Rate.pdf PDF
Attch 33 - Bays 4 and 5 sheet 1 sun shade canopies elevation.pdf PDF
Attach 34 - Bays 4 and 5 sheet 2 sun shade canopies details.pdf PDF
Attach 35 - Solicitation Questions and Answers.pdf PDF
Attach 31 - TX20220186 Texas Wage Rate.pdf PDF
Solicitation Amendment FA309922R00010001 SF 30 (1).pdf PDF
Solicitation - FA309922R0001.pdf PDF
10 - Schedule of Material Submittals.pdf PDF
25 - UFC 3-575-01 Lightning And Static Electricity Protection Systems.pdf PDF
15 - UFC 3-250-01 Pavement Design For Roads And Parking Areas.pdf PDF
13 - UFC 3-201-01 Civil Engineering.pdf PDF
22 - UFC 3-260-16 O-M Manual Standard Practice For Airfield Pavement Condition Surveys.pdf PDF
12 - UFC 1-200-01 DoD Building Code.pdf PDF
07 - EQ Contractor Tech Specs March 2021.pdf PDF
23 - UFC 3-301-01 Structural Engineering.pdf PDF
16 - UFC 3-250-04 Standard Practice For Concrete Pavements With Change 2.pdf PDF
14 - UFC 3-220-01 Geotechnical Engineering.pdf PDF
28 - Entry Authority List (EAL).pdf PDF
01 - AETC Installation Excellence Guide.pdf PDF
18 - UFC 3-260-01 Airfield And Heliport Planning And Design With Change 1.pdf PDF
17 - UFC 3-250-11 Soil Stabilization And Modifications For Pavements.pdf PDF
29 - Progress Schedule and Progress Report.pdf PDF
20 - UFC 3-260-03 Airfield Pavement Evaluation.pdf PDF
09 - LAFB_Architectural_Compatibility_Guide.pdf PDF
11 - Security Requirements for SOW.pdf PDF
06 - DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
27 - Division 01 Specifications.pdf PDF
21 - UFC 3-260-04 Airfield And Heliport Marking.pdf PDF
08 - FAA_Form_7460-1.pdf PDF
19 - UFC 3-260-02 Pavement Design For Airfields.pdf PDF
24 - UFC 3-535-01 Visual Air Navigation Facilities With Change 3.pdf PDF
26 - Contractor Fire Prevention Briefing Guide 3.0.pdf PDF
03 - AF IMT 3000 Material Approval Submittal.pdf PDF
04 - C-D Debris Disposal Report Tracker.pdf PDF
05 - C-D Debris Monthly Disposal Report.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE PREPAREDBASE CIVIL ENGINEERING WORK CLEARANCE REQUEST

(See Instructions on Reverse)

1. Clearance is requested to proceed with work at on Work Order No. , Contract No. , involving excavation or utility disturbance per attached sketch. This area has has not been staked or clearly marked.

2. TYPE OF FACILITY/WORK INVOLVED

G. AIRCRAFT OR VEHICULAR TRAFFIC FLOWA. PAVEMENTS D. FIRE DETECTION & PROTECTION SYSTEMS

H. SECURITYB. DRAINAGE SYSTEMS E. UTILITY OVERHEAD UNDERGROUND

I. OTHERC. RAILROAD TRACKS F. COMM OVERHEAD UNDERGROUND

3. DATE CLEARANCE REQUIRED 4. DATE OF CLEARANCE

5. SIGNATURE OF REQUESTING OFFICIAL

ORGANIZATION REMARKS (Use Reverse for additional REVIEWER'S NAME AND INITIALS

8.

A. ELECTRICAL DISTRIBUTION

B A

S B. STEAM DISTRIBUTION

E

C. WATER DISTRIBUTION

C I

D. POL DISTRIBUTIONV

I L

E. SEWER DISTRIBUTION

E N

F. ENVIRONMENTAL

G

I

G. PAVEMENTS/ GROUNDSN

E

E H. FIRE PROTECTION

R

I

I. ZONEN

G

J. OTHER (Specify)

9. SECURITY POLICE

10. SAFETY

11. COMMUNICATIONS

12. BASE OPERATIONS

13. CABLE TV

14. COMMERCIAL UTILITY COMPANY

TELEPHONE

GAS

ELECTRIC

15. OTHER (Specify)

16. REQUESTED CLEARANCE APPROVED DISAPPROVED

17. TYPED NAME AND SIGNATURE OF APPROVING OFFICER (Chief of Operations Flight or Chief of Engineering Flight) 17a. DATE SIGNED

PREVIOUS EDITIONS ARE OBSOLETE.AF IMT 103, 19940801, V3

7. ORGANIZATION6. TELEPHONE NO.

INSTRUCTIONS

The BCE work clearance request is used for any work (contract or in-house) that may disrupt aircraft or vehicular traffic flow, base utility services, protection provided by fire and intrusion alarm system, or routine activities of the installation. This form is used to coordinate the required work with key base activities and keep customer inconvenience to a minimum. It is also used to identify potentially hazardous work conditions in an attempt to prevent accidents. The work clearance request is processed just prior to the start of work. If delays are encountered and the conditions at the job site change (or may have changed) this work clearance request must be reprocessed.

18. REMARKS. (This section must describe specific precautionary measure to be taken before and during work accomplishment. Specific comments concerning the approved method of excavation, hand or powered equipment, should be included.)

AF IMT 103, 19940801, V3 (REVERSE)