05 - C-D Debris Monthly Disposal Report.pdf

PDF 60 KB Posted

Attached to
Relocate Kirtland Sunshades
Solicitation number
FA3099-22-R-0001
Issued by

About this file

This document contains a monthly debris disposal report and a federal contract opportunity solicitation. The debris disposal report is a template for contractors to report tons and costs for debris diverted from landfills, landfilled, mulched, and other categories on a monthly basis. It requires the contractor's name, reporting period, totals for each category, percentages diverted from landfills, and an authorized signature.

The federal contract opportunity is solicitation number FA3099-22-R-0001 from the Department of the Air Force Air Education and Training Command to relocate two sunshades from Kirtland Air Force Base in New Mexico to Laughlin Air Force Base in Texas. The project includes removing and dismantling the sunshades, grinding down footers, transporting, installing with new footers and lighting, and replacing any additional parts. The acquisition is set aside for small businesses with a NAICS code of 236220 and size standard of $39.5 million. Interested parties can download the solicitation and all responsible sources may submit proposals for a firm-fixed price contract. Offerors must register in the System for Award Management to be eligible for award.

View the file

Other files

File Type Posted
Attach 37 - B219 Information.pdf PDF
FA309922R0001 Amendment 004.pdf PDF
Attach 36 - CASS Sys As-built.pdf PDF
Attach 35 - Questions and Answers Revised 30 June.pdf PDF
Attach 38 - Rows V and W.pdf PDF
Attach 39 - Disconnect Panel.jpg JPG image
Solicitation Amendment FA309922R00010003 SF 30.pdf PDF
Attach 32 - Past Performance Questionnaire.pdf PDF
Solicitation Amendment FA309922R00010002 SF 30.pdf PDF
Attach 30 - NM20220044 New Mexico Wage Rate.pdf PDF
Attch 33 - Bays 4 and 5 sheet 1 sun shade canopies elevation.pdf PDF
Attach 34 - Bays 4 and 5 sheet 2 sun shade canopies details.pdf PDF
Attach 35 - Solicitation Questions and Answers.pdf PDF
Attach 31 - TX20220186 Texas Wage Rate.pdf PDF
Solicitation Amendment FA309922R00010001 SF 30 (1).pdf PDF
Solicitation - FA309922R0001.pdf PDF
10 - Schedule of Material Submittals.pdf PDF
25 - UFC 3-575-01 Lightning And Static Electricity Protection Systems.pdf PDF
15 - UFC 3-250-01 Pavement Design For Roads And Parking Areas.pdf PDF
13 - UFC 3-201-01 Civil Engineering.pdf PDF
22 - UFC 3-260-16 O-M Manual Standard Practice For Airfield Pavement Condition Surveys.pdf PDF
12 - UFC 1-200-01 DoD Building Code.pdf PDF
07 - EQ Contractor Tech Specs March 2021.pdf PDF
23 - UFC 3-301-01 Structural Engineering.pdf PDF
16 - UFC 3-250-04 Standard Practice For Concrete Pavements With Change 2.pdf PDF
14 - UFC 3-220-01 Geotechnical Engineering.pdf PDF
28 - Entry Authority List (EAL).pdf PDF
01 - AETC Installation Excellence Guide.pdf PDF
18 - UFC 3-260-01 Airfield And Heliport Planning And Design With Change 1.pdf PDF
17 - UFC 3-250-11 Soil Stabilization And Modifications For Pavements.pdf PDF
29 - Progress Schedule and Progress Report.pdf PDF
20 - UFC 3-260-03 Airfield Pavement Evaluation.pdf PDF
09 - LAFB_Architectural_Compatibility_Guide.pdf PDF
11 - Security Requirements for SOW.pdf PDF
06 - DD 1354 - Transfer and Acceptance of DoD Real Property.pdf PDF
27 - Division 01 Specifications.pdf PDF
21 - UFC 3-260-04 Airfield And Heliport Marking.pdf PDF
08 - FAA_Form_7460-1.pdf PDF
19 - UFC 3-260-02 Pavement Design For Airfields.pdf PDF
24 - UFC 3-535-01 Visual Air Navigation Facilities With Change 3.pdf PDF
26 - Contractor Fire Prevention Briefing Guide 3.0.pdf PDF
03 - AF IMT 3000 Material Approval Submittal.pdf PDF
04 - C-D Debris Disposal Report Tracker.pdf PDF
02 - AF IMT 103 Base Civil Engineering Work Clearance Request.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reporting Period: through (mm/dd/yy) (mm/dd/yy)

Contractor:

Tons Diverted (T) Cost to Divert ($) Tons Landfilled (T) Cost to Landfill ($) Tons Mulched (T) Concrete Asphalt Clean Fill Gravel Greenery Scrap Metal Wood Drywall Other:

Other:

Other:

General Debris:

TOTALS: 0 $0.00 0 $0.00 0

Total Diverted: 0 Comments:

Total Landfilled: 0

Total Mulched: 0

Total Incinerated: 0

Total Waste to Energy: 0

Percent Diverted: #DIV/0!

(=Total Diverted divided by Total Diverted + Total Landfilled + Total Mulched + Total Incinerated + Total Waste to Energy)

Note 1: Contractor may attach weight tickets to this form.

Note 2: Estimated weights and costs is sufficient if actual numbers cannot be given.

Signature: Date:

Construction & Demolition Debris Monthly Disposal Report

MulcDiverted Landfilled # of Loads Where DeliveredCommodity

File details come from the government source that posted it. Updated .